My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hultz, BHU Engineers, Inc. 11/14/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Hultz, BHU Engineers, Inc. 11/14/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:26:06 PM
Creation date
11/19/2024 2:25:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Hultz, BHU Engineers, Inc.
Approval Date
11/14/2024
End Date
12/31/2027
Department
Facilities
Department Project Manager
Josh O’Neil
Subject / Project Title
ASHRAE Level II Building Energy Audit
Tracking Number
0004590
Total Compensation
$20,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />SCOPE OF WORK <br /> <br /> <br />Hultz BHU Engineers, Inc. will be providing an AHSRAE Level 2 Building Energy Audit <br />of the Everett Station. The purpose of the Audit is to provide analysis of the building’s <br />energy consumption by end-use to identify areas with the greatest opportunities for <br />energy efficiency. <br /> <br />Our work would be to interview staff, and analyze the building’s various envelope, <br />electrical, mechanical, and control systems that serve the building, and provide Energy <br />Conservation Measures (ECMs) to reduce the building Energy Utilization Index (EUI). <br /> <br />The deliverable would be a report with, as a minimum, the following sections: <br />• Table of Contents <br />• Executive Summary <br />• Background <br />• Facility Description <br />• Utility Summary <br />• Benchmarking <br />• Energy Conservation Measures (ECMs) <br />• Appendix: Completed US DOE Asset Score/Audit Template tool. This is listed as <br />“Form D” in the Clean Buildings Standard <br />We propose to provide these services on an hourly basis not to exceed $20,000.00 <br />without a written request from the City of Everett. Our added work is summarized below <br />in the task and hours breakdown. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.