Laserfiche WebLink
Exhibit A (Scope of Work) <br /> <br />Hultz/BHU Engineers <br />Consulting Engineers <br />E N G I N E E R I N G H O U R S <br />(253) 383-3257 <br />8/6/2024 <br /> <br />Project: Everett Station - ASHRAE Level 2 Building Audi <br />Work: Mechanical Engineering <br /> <br />DESIGN PHASE <br /> <br />Task <br />- <br />Principal <br />Assoc <br />Principal <br />Senior <br />Engr <br />Senior <br />Proj Mgr <br />Project <br />Engr <br />Project <br />Mgr <br />Senior <br />Designer <br />CAD <br />Tech <br />.- <br />Clerical <br />Generate Building Energy Model 1 4 30 2 <br />Cross-check model w/ Utilities 2 4 <br />Interviews with Staff 2 2 <br />Modify model for ECMs 2 12 <br />Cost Estimate for ECMs 2 12 <br />EUI Analysis 4 8 <br />Draft Level 2 Audit Report 12 4 12 <br />Review Meeting 4 <br />Incorporate Meeting Comments 2 2 2 <br />Complete WA CBPS Form D 4 <br /> Hour Total 1 38 0 0 74 0 0 2 14 <br />Labor Hourly Rate $225.00 $185.00 $160.00 $155.00 $150.00 $135.00 $120.00 $100.00 $70 <br />Labor Cost Sub-Totals $225 $7,030 $0 $0 $11,100 $0 $0 $200 $980 <br />DESIGN PHASE TOTAL: $19,535 <br /> <br />Hourly Rates <br /> - <br />Principal <br />Assoc <br />Principal <br />Senior Senior <br />Engr Proj Mgr <br />Project <br />Engr <br />Project <br />Mgr <br />Senior <br />Designer <br />CAD <br />Tech <br />.- <br />Clerical <br /> <br />$225.00 <br /> <br />$185.00 <br /> <br />$160.00 <br /> <br />$155.00 <br /> <br />$150.00 <br /> <br />$135.00 <br /> <br />$120.00 <br /> <br />#100.00 <br /> <br />$70.00 <br /> <br />