My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KBA, Inc. 11/18/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
KBA, Inc. 11/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 2:28:08 PM
Creation date
11/19/2024 2:27:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KBA, Inc.
Approval Date
11/18/2024
Council Approval Date
11/6/2024
End Date
12/31/2028
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
PGSF Construction Management
Tracking Number
0004591
Total Compensation
$8,485,355.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
KBA, Inc. September 26, 2024 <br />S:\Projects\Contracts\Client\Everett\BP-24-092-01 - Everett PGSF\Negotiations\KBA-SCOPE PGSF Plant_Rev1.docx <br /> 4 of 7 <br /> <br />• Change Order(s) <br />• Progress Pay Requests <br />• Certificate Letters of Completion <br />• Final records – hard copy and electronic <br />E. Construction Phase Services – Field <br />1. Observe the technical conduct of the construction, including providing day -to-day contact with <br />the construction contractor, Client, utilities, and other stakeholders, and monitor for <br />adherence to the Contract Documents. The Consultant’s personnel will act in accordance <br />with Sections 1-05.1 and 1-05.2 of the WSDOT/APWA Standard Specifications. <br />2. Observe material, workmanship, and construction areas for compliance with the Contract <br />Documents and applicable codes. Advise the Client of any non-conforming work observed <br />during site visits. <br />3. Prepare Inspector Daily Reports (IDRs), recording the construction contractor’s operations as <br />actually observed by the Consultant; includes estimated quantities of work placed that day, <br />contractor’s equipment and crews, photos of work performed, and other pertinent information. <br />4. Interpret Construction Contract Documents, in coordination with Designer. <br />5. Evaluate and report to Client issues that may arise as to the quality and acceptability of <br />material furnished, work performed, and rate of progress of work performed by the <br />construction contractor. <br />6. Establish communications with adjacent property owners. Respond to questions from <br />property owners and the general public. <br />7. Coordinate with permit holders on the Project to monitor compliance with approved permits, if <br />applicable. <br />8. Prepare field records, daily reports of force account worked, and other payment source <br />documents to help facilitate administration of the Project in accordance with funding agency <br />requirements. <br />9. Attend and actively participate in regular on-site meetings. <br />10. Take periodic digital photographs during the course of construction. Photographs to be <br />labeled and organized in accordance with Client protocol. <br />11. Punch List. Upon substantial completion of work, coordinate with the Client and affected <br />agencies, to prepare a ‘punch list’ of items to be completed or corrected. Coordinate final <br />inspection with those agencies. <br />12. Testing. Conduct materials and laboratory tests. Coordinate the work of the Field <br />Representative(s) and testing laboratories in the observation and testing of materials used in <br />the construction; document and evaluate results of testing; and inform Client and construction <br />contractor of deficiencies. <br />Deliverables <br />• IDRs with Project photos – submitted on a weekly basis <br />• Field Note Records and Daily Reports of Force Account Worked <br />• Additional Project photos not included in IDRs <br />• Punch List(s) <br />• Test reports <br /> <br />F. Assumptions <br />1. Budget:
The URL can be used to link to this page
Your browser does not support the video tag.