My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY 2024-12-06
>
Address Records
>
BROADWAY
>
3315
>
3315 BROADWAY 2024-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 9:03:11 AM
Creation date
11/20/2024 8:43:15 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 3 4 5 6 <br /> DESIGNDYKEMAN <br /> ARCHITECTURE + <br /> E E <br /> r <br /> DUCT-TO-FAN CONNECTION TO <br /> COMPLY WITH 2O18 WSMC 506.3.2.3 <br /> SLOPE DUCT BACK <br /> TOWARDS HOOD <br /> I <br /> -Ell ECOTOPE <br /> I <br /> I <br /> MOUNT ON SITE.ROOF !. <br /> CURB BY OTHERS <br /> �MOORf� <br /> 2p4 OF WA4,0OG� <br /> __ _ vvvvvZ<<S��>>>v>>v�vvvvvvvvvvZ<<���;>>v>>v�vvvvZv Roof Plate � <br /> 1216 -4" 55029 <br /> RfCISTEaE� <br /> fss/ONAii. <br /> II DUCTS SERVING KITCHEN EXHAUST TENANT <br /> III{ SYSTEM SHALL BE CONSTRUCTED OF <br /> MATERIALS IN ACCORDANCE WITH <br /> IMPROVEMENTS <br /> 2018 WSMC 506.3.1.1 AND 506.3.1.21.2 <br /> FOR <br /> HOPEWORKS <br /> _ Level4 AT <br /> �18'-0° 3315 BROADWAY <br /> EVERETT, WA <br /> BID SET <br /> 08/29/2022 <br /> CLEANO UTS SHALL BE PROVIDED ONE <br /> C <br /> PER FLOOR PER 2018 WSMC 506.3.9.2 is drawing is: <br /> - 1.Copyright 2017 Dykeman,Inc. C <br /> = 2.The Architect's Instrument of Professional Service. <br /> 3.For use on this project only.Obtain Architect's <br /> Written permission far any other use or reproduction. <br /> PROJECT <br /> 20121-031 <br /> MARK DATE DESCRIPTION <br /> 10T <br /> _ Level 3 <br /> -10" <br /> GREASE DICT BRACING AND SUPPORTS <br /> SHALL BE CONSTRUCTED AND <br /> INSTALLED PER 2018 WSMC 506.3.3 <br /> ICI <br /> B B <br /> • <br /> PRINCIPAL IN CHARGE:I <br /> PROJECT MANAGER: <br /> PROJECT ARCHITECT: I <br /> JOB CAPTAIN: <br /> _ Level <br /> 98'-4" <br /> SLOPE BACK TO HOOD SEAL AROUND DUCT AT ENTRANCE TO <br /> SHAFT.ENSURE DUCT IS 6 INCHES FROM <br /> SHAFT WALL PER 2018 WSMC 506.3.11.1. <br /> FYREW RAP IS NOT REQUIRED WITHIN SHAFT <br /> DRAWING <br /> A MECHANICAL - A <br /> GREASE DUCT SECTION SECTIONS <br /> DRAWING <br /> a <br /> 1 2 3 4 5 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.