My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1223 LOMBARD AVE 2025-01-24
>
Address Records
>
LOMBARD AVE
>
1223
>
1223 LOMBARD AVE 2025-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2025 9:34:02 AM
Creation date
11/21/2024 9:05:20 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
1223
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 406.2 • <br /> Energy Credits (2015 Code) <br /> OPTION DESCRIPTION CREDIT(S) Estimated Cost <br /> 2c AIR LEAKAGE CONTROL AND EFFICIENT VENTILATION 2c: 1.5 <br /> Compliance based on Section R402.4.1.2: Reduce the tested air leakage to 1.5 air <br /> changes per hour maximum <br /> and <br /> All whole house ventilation requirements as determined by Section M1507.3 of the <br /> International Residential Code shall be met with a heat recovery ventilation system <br /> with minimum sensible heat recovery efficiency of 0.85. <br /> To qualify to claim this credit,the building permit drawings shall specify the option <br /> being selected and shall specify the maximum tested building air leakage and shall <br /> show the heat recovery ventilation system. <br /> 3a" HIGH EFFICIENCY HVAC EQUIPMENT 3a: 1.0 <br /> Gas,propane or oil-fired furnace with minimum AFUE of 94%,or <br /> Gas,propane or oiled-fired boiler with minimum AFUE of 92% <br /> To qualify to claim this credit,the building permit drawings shall specify the option <br /> being selected and shall specify the heating equipment type and the minimum <br /> equipment efficiency. <br /> 3b' HIGH EFFICIENCY HVAC EQUIPMENT 3b: - 1.0 <br /> Air-source heat pump with minimum HSPF of 9.0 <br /> To qualify to claim this credit,the building permit drawings shall specify the option <br /> being selected and shall specify the heating equipment type and the minimum <br /> equipment efficiency. <br /> 3e" HIGH EFFICIENCY HVAC EQUIPMENT 3c: 1.5 <br /> Closed-loop ground source heat pump;with a minimum COP of 3.3 <br /> or <br /> Open loop water source heat pump with a maximum pumping hydraulic head of 150 <br /> feet and minimum COP of 3.6 <br /> To qualify to claim this credit,the building permit drawings shall specify the option <br /> being selected and shall specify the heating equipment type and the minimum <br /> equipment efficiency. <br /> 3d1' HIGH EFFICIENCY HVAC EQUIPMENT 3d: 1.0 <br /> Ductless Split System Heat Pumps,Zonal Control:In homes where the primary space <br /> heating system is zonal electric heating,a ductless heat pump system shall be installed <br /> and provide heating to the largest zone of the housing unit. <br /> To qualify to claim this credit;the building permit drawings shall specify the option <br /> being selected and shall specify the heating equipment type and the minimum <br /> equipment efficiency. <br /> 4 HIGH EFFICIENCY HVAC DISTRIBUTION SYSTEM: 1.0 <br /> All heating and cooling system components installed inside the conditioned space. <br /> This includes all equipment and distribution system components such as forced air <br /> ducts,hydronic piping,hydronic floor heating loop,convectors and radiators.All <br /> combustion equipment shall be direct vent or sealed combustion. <br /> For forced air ducts:A maximum of 10 linear feet of return ducts and 5 linear feet of <br /> supply ducts may be located outside the conditioned space.All metallic ducts located <br /> outside the conditioned space must have both transverse and longitudinal joints sealed <br /> with mastic.If flex ducts are used,they cannot contain splices.Flex duct connections <br /> must be made with nylon straps and installed using a plastic strapping tensioning tool. <br /> Ducts located outside the conditioned space must be insulated to a minimum of R-8_ <br /> Locating system components in conditioned craw]spaces is not permitted under this <br /> option. <br /> Electric resistance heat and ductless heat pumps are not permitted under this option. <br /> Direct combustion heating equipment with AFUE less than 80%is not permitted <br /> under this option. <br /> To qualify to claim this credit,the building permit drawings shall specify the option <br /> being selected and shall specify the heating equipment type and shall show the <br /> location of the heating and cooling equipment and all the ductwork. <br />
The URL can be used to link to this page
Your browser does not support the video tag.