Laserfiche WebLink
Evergreen Pump Station Mods. <br />UP3747 <br />Quantity Designation <br />1 XFMR-A <br />Main Switch- <br />. <br />Change Order No. 03 <br />Product Description <br />Estimated Ship <br />Dates <br />Dry Transformer-Class 7423 5/12/2023 <br />1 Gear 1200A MV Metal Enclosed Switchgear 3/6/2023 <br />1 SWGR-A 600A MV Switchgear 5/15/2023 <br />1 SWGR-B 600A MV Switchgear 5/15/2023 <br />1 SWGR-GEN 600A MV Switchgear Generator 5/15/2023 <br />1 MTS Manual Transfer Switch-FOXFAB 5/15/2023 <br />1 ATS-ASCO Automatic Transfer Switch 2/20/2023 <br />5/22/2024 <br />Delayed <br />Ship- <br />Actual Ship Calander <br />Date Days <br />6/8/2023 27 Days <br />2/21/2024 352 Day s <br />2/27/2024 288 Days <br />2/27/2024 288 Days <br />2/27/2024 288 Days <br />7/12/2023 58 Days <br />4/23/2024 428 Days