Laserfiche WebLink
11` <br /> • <br /> Response: Stair design have been revised, corrected, dimensions provided. <br /> Clouded notes are on sheets A05,A07. <br /> 6. the stairs to the Master Bedroom do not appear to provide the minimum required headroom. <br /> Show how existing roof structure will be modified to gain the required headroom over the stairs. <br /> Response: Stair design have been revised, corrected, dimensions provided. <br /> Clouds see section A-A on All and plans sheets A07,A08 <br /> g‘6R 2aS n14/i1)- irG bblwori <br /> 7. Please verify the area of all additions and the area of the garage being converted into living <br /> space. Area calculation are based on the dimensions to the outside of exterior walls. <br /> Response: Area of garage was modified, but still kept as unheated space. <br /> 8. Provide a minimum 36 inches landing measured in the direction of travel at the front door. <br /> Landing shall be at last as wide as door. If 4 or more risers are present, provide a handrail per <br /> section R311.7.8IRC. Show on plans. Show a landing at the rear door from the Recreation <br /> Room and at Bedroom#5. Specify 7 % inch maximum rise. <br /> Response: The landing provided. The handrail note added on main floor plan sheet <br /> A05 and elevations sheet A 10 <br /> 9. The details on sheet A04 show brick veneer with 31/inches between the bricks and the <br /> framed wall. The text calls out a one inch air space. Please correct. Specify scale of section <br /> drawings. Callouts on sheet A04 refer to details 1 and 2 on sheet A05. Please correct. <br /> Response: Two details have been modified and brick veneer was changed to thin <br /> cut stone veneer. The dimensions and notes arrow corrected, the typo with sheet <br /> number have been corrected. See sheet A04 for modified details 1/A04 and 2/A04 <br /> and new thin cut stone detail 3/A04. <br /> 10. How new concrete on foundation plan. Use a different symbol to represent existing concrete <br /> and new concrete. <br /> Response: Proposed foundation hatch have been changes and heavier line has been <br /> used <br /> 11. Provide section drawing for new foundation with brick veneer. Show brick on all plan views <br /> and on the section drawing on sheet Al 1. <br /> Response: The new stone veneer detail has been provided as detail 3 on sheet A04. <br /> 12. Show brick veneer on foundation plan. Lower floor and on elevations. <br /> Response: The line indicates stone veneer have been shown on basement and <br /> 25 <br />