My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2614 COLBY AVE 2025-01-09
>
Address Records
>
COLBY AVE
>
2614
>
2614 COLBY AVE 2025-01-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 1:08:40 PM
Creation date
11/21/2024 11:07:53 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2614
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIGHTING COMPLIANCE SUMMARY E a -\ <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI Adm• ' e by:©2022 NEEA,All rights reserved <br /> Project Title YOMIE YOGURT-2018 WSEC For Building Department Use::AR 0 6 R^ ` • <br /> I Date: Oct 26,2022 <br /> Project Address 2614 Colby Ave <br /> Project&Applicant Everett,WA 98201 Li <br /> Information Applicant Name ZEYULI CIT E -• <br /> v (.Q,�, _n <br /> Applicant Phone 206-466-1225 �( <br /> Applicant Email zyli@studiol9architects.com Permit Sc r',: <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> General Occupancy All Group R-R2,1t3&R4 over 3 stories and all RI 'General Building Use Type Dining,Cafeteria Building Cond.Floor Area ' 2,200 <br /> INew Building or Project Cond.Floor Area 2,200 <br /> Alteration <br /> General Project Types Alteration 'Addition Lighting Scope I interior Lighting Floors Above Grade i <br /> Lighting Scope Compliance Method Compliance Method 1 -General <br /> Lighting Project Description <br /> Interior/Exterior LPA Calculation <br /> Lighting Compliance Scope Project Type (Interior includes both interior&parking) Luminaire Replacement Scope Compliance Method Adjustment Compliance Verification <br /> and Method Alteration interior Lighting 50%or more replaced Space by space No Calculation Adjustments allowed COMPLIES <br /> Additional Efficiency <br /> Options Included <br /> I <br /> 1 YOMIE YOGURT-2018 WSEC i Date I Oct 26,2022 Project Title <br /> Lighting Power Calculation ALTERATION-INTERIOR LIGHTING(50%or more replaced) Compliance Verification COMPLIES <br /> Compliance Method Space by space I.PA Calculation Adjustment none <br /> Interior Lighting Power Allowance-Space by Space <br /> Ceiling Total Watts Allowed Total Proposed Watts <br /> General Space Type Specific Space Type Height(Ft) Gross Interior Area(SF) LPA(Watts/SF) (SF x LPA x 1) (LPD+Display LPD) Compliance Status <br /> Corridors General 34 0.41 14 <br /> Dining area General 261 0.43 112 <br /> Food preparation 365 1.09 398 <br /> Restroom General 52 0.63 33 <br /> Warehouse/storage area Medium to bulky palletized items 1,256 0.33 415 • <br /> Proposed Total LPD 884 <br /> Totals' 971 884 COMPLIES 1 <br /> Proposed lighting Power Density <br /> 1 Watts or I Total Watts <br /> Fixture Type Fixture II) Quantity of Wattage Limit Total Linear Watts per Linear Proposed <br /> Fixtures(#F) per Fixture Feet(LF) Foot(WpLF) (#F z WpF)or <br /> (WpI) (LF x\VpL ) <br /> individual Fixtures <br /> Direct/indirect pendant Pi 4 19 76 <br /> Troffer FI 4 29 116 <br /> Recessed downlight Ri 15 20 300 <br /> Suspended GI 7 56 392 <br /> Proposed Total LPD 884 <br /> Project Title YOMIE YOGURT-2018 WSEC Date Oct 26,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.