My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2418 74TH ST SE 2023 Plans 2024-11-26
>
Address Records
>
74TH ST SE
>
2418
>
Plans
>
2418 74TH ST SE 2023 Plans 2024-11-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 10:40:43 AM
Creation date
11/26/2024 10:39:59 AM
Metadata
Fields
Template:
Address Document
Street Name
74TH ST SE
Street Number
2418
Permit
B2301-019
Year
2023
Notes
INSTALLATION OF (4) HELICAL PILES TO STABILIZE FOUNDATION
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 of 21 <br /> PROJECT NO. SHEET NO. <br /> �►� S221006-2XR <br /> PROJECT 2418 74th St SE Everett WA 98203 <br /> LONGITUDE SUBJECT Foundation Stabilization/Jacking <br /> ONE TWENTY° <br /> ENGINEERING&DESIGN BY JT DATE 11/19/2022 <br /> Scope/Objective: <br /> To determine the required pile spacing and geometry to stabilize and lift(where required)the existing structural foundation. These <br /> findings have been based upon the calculated strength of the existing foundation system and the current vertical loading from the <br /> existing structure above(based on as-built assessments). <br /> The R&R Foundation Specialists'(R&R)proposed pile layout can be found in the following pages with structural recommendations <br /> based upon the findings of L120 Engineering&Design. <br /> Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic <br /> damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in <br /> the structural scope presented here. <br /> It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings.The interior crawl-space <br /> support system for the first floor shall be installed per R&R. This could include the use of some or all of the following:longer support <br /> posts,adjustable post-base hardware,and/or the addition of taller wood support members. Settlement in these interior support areas <br /> shall be monitored and further adjustments shall be made if necessary. <br /> Structural Summary: <br /> -The foundation of the residence consists of continuous cast-in-place concrete stem wall and concrete strip footings.Below the footings, <br /> piles are to be spaced at a distance no larger than 8'-0"o.c.as indicated on the attached Level Survey. <br /> -End piles shall not exceed the maximum corner offset as specified on the attached Level Survey. <br /> -A maximum allowable loading of 1,480 plf was utilized in this analysis.This was determined through inspection of building geometry <br /> and conservative span/tributary loading assumptions based on standard construction practices <br /> - The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment <br /> assemblies with capacities equal to or greater than the indicated load values. <br /> Allowable Load Capacity Requirement: <br /> Helical Pile#1-2 @ 8'-0"o.c. 9.0 kip minimum vertical capacity(allowable load) <br /> Helical Pile#3-4 @ 8'-0"o.c. 12.0 kip minimum vertical capacity(allowable load) <br /> Note: Refer to the attached General Notes for additional requirements. <br /> - As determined by R&R,the site appears to have no lateral(horizontal)displacements or concerns. As such,the analysis and <br /> recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed or <br /> expected additional structural analysis will be required. <br /> - Structural recommendations contained in this package are based on site photographs dated September 11th,2022,provided by R&R. <br /> To the knowledge of L120,a geotechnical investigation was not performed on this site.Consequently,all structural recommendations <br /> assume adequate soil conditions to obtain the required pile capacities. <br /> Please inform L120 of site-specific conditions that were unconsidered by,may conflict with,or otherwise compromise the <br /> recommendations contained within this package,including,but not limited to,water drainage,slope stability,existing structural damage, <br /> or existing subsurface obstructions. In this instance,the structural assumptions,recommendations,and scope for this project will need <br /> to be revisited to consider and address the new findings <br /> Refer to the following pages for pile and connection specifications. <br /> L120 ENGINEERING&DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.