My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5831 1ST AVE SE 2024 Plans 2024-11-26
>
Address Records
>
1ST AVE SE
>
5831
>
Plans
>
5831 1ST AVE SE 2024 Plans 2024-11-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 11:16:14 AM
Creation date
11/26/2024 11:16:07 AM
Metadata
Fields
Template:
Address Document
Street Name
1ST AVE SE
Street Number
5831
Permit
B2405-047
Year
2024
Notes
ADDITION OF LANDING AND STAIRS TO EXISTING DECK
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Project Address: <br /> Plan View— Page 1 of 2 5831 1st Ave SE <br /> Everett Washington 98203 <br /> IHouse Rim Joist <br /> Lr '� f Notes: <br /> : See El 1. Design includes new decking stair landing(4"X <br /> \edger: <br /> 2X8 Note 13 Single Ledger:2X8 5"overall dimension)and stairs to be added <br /> ch nominal inch nominal adjacent to existing exterior house deck <br /> Existing bath exhaust 2"X8'joist (29"length) 2. New deck section will be structurally supported <br /> 19"lenathl hanger independent of the existingdeck <br /> vent(6"wide with 3" P <br /> clearance to ledgers) Concealed 3. Hem-Fir non-incised preservative-treated wood <br /> Double 2"X8"joists flange hangers used throughout <br /> 2"X8'joist (46.5"span) on opposite 4. All field-cut ends,notches and drilled holes with <br /> hanger 14"round end joists 4X4 be treated with wood preservative <br /> concrete guardrail 5. Beam tape will be applied to the top of the beam, <br /> See Two 2"X8"beam 14"round joists and stair stringers <br /> 6"X6" footing(12 6"X6" posts ong <br /> Note 15 assembly concrete 6. All fasteners and connectors used for the deck <br /> post inch depth) post footing(12 outside <br /> cantilevered(60" g will be approved for contact with preservative <br /> inch de th of end <br /> 's •./( span) — P ) joist treated wood in accordance IRC <br /> �� --I �'r s( 7. New deck framing(similar to current house deck) <br /> _ i t will include a ledger attached to the existing <br /> house rim joist with the joists attached at the <br /> Existing Deck _ 'J'10.5"on-centerjoist N.v L 1 •0' house and bearing over a beam <br /> 10.5"on.- 13.75"on- . 13.75"on- <br /> 2.5"on spacingconnectin 8. 8 inch joist hangers and 1%connector screws <br /> (12'X10' center joist 9 center joist��y' center joist��� will be used.Concealed flange hangers will be <br /> ) �nte� ~spacing the two headers s acin spacing Ei <br /> approx. 7.5' ✓ spacing �� P g installed on opposite end joists <br /> above grade _ r 9. Two 2"X8"beam assembly cantilevered L/4 max <br /> joist span(4 feet) <br /> 60"rim1 See 10. Deck posts with be notched to carry double deck <br /> joist Note 17 beam and fastened with hot dipped galvanized <br /> iii S e e <br /> • Note 17 Stairs 36"width with );II 'A inch through bolts,nuts,and washers <br /> 4 stringers 4X4 guardrail 11. Joist blocking over beam length will be fastened <br /> 4X4 guardrail (See pg.2) posts on outside to adjacent joists with 3 inch timber screws <br /> posts on outside of rim joist 12. Deck beam will be attached to joists with <br /> of rim joist hurricane ties <br /> 13. Two separate 2X8 inch nominal ledgers for the <br /> new 4'X5'decking needed due to existing bath <br /> One handrail exhaust vent on same plane as ledger and ledger <br /> on right side ------► attached with 4 inch ledger lock timber screws <br /> descending 14. Ledger and house rim board will be weather <br /> — protected with corrosion-resistant metal flashing <br /> _ — — and butyl peel and stick membrane <br /> 15. One double joist inboard of the end joist nearest <br /> the existing deck to support one deck board <br /> running parallel to the joist serving as a breaker <br /> board and support the butt ends of the new <br /> ,- ECEll <br /> decking boards running perpendicular to the <br /> 1)D breaker board and joists <br /> 16. Rim joist to joists will be connected using 8 inch <br /> timber screws <br /> MAY 1 9 2024 17. Guardrail posts will be secured with galvanized <br /> '/z"through bolts,nuts,and washers to interior <br /> CITY OF E VE R E TT joists using tension ties and blocking on end <br /> Permit Services joists. Configuration dependent on joint location <br /> to guardrail post position. <br />
The URL can be used to link to this page
Your browser does not support the video tag.