Laserfiche WebLink
' Project Address: <br /> Plan View— Page 1 of 2 5831 1st Ave SE <br /> Everett Washington 98203 <br /> IHouse Rim Joist <br /> Lr '� f Notes: <br /> : See El 1. Design includes new decking stair landing(4"X <br /> \edger: <br /> 2X8 Note 13 Single Ledger:2X8 5"overall dimension)and stairs to be added <br /> ch nominal inch nominal adjacent to existing exterior house deck <br /> Existing bath exhaust 2"X8'joist (29"length) 2. New deck section will be structurally supported <br /> 19"lenathl hanger independent of the existingdeck <br /> vent(6"wide with 3" P <br /> clearance to ledgers) Concealed 3. Hem-Fir non-incised preservative-treated wood <br /> Double 2"X8"joists flange hangers used throughout <br /> 2"X8'joist (46.5"span) on opposite 4. All field-cut ends,notches and drilled holes with <br /> hanger 14"round end joists 4X4 be treated with wood preservative <br /> concrete guardrail 5. Beam tape will be applied to the top of the beam, <br /> See Two 2"X8"beam 14"round joists and stair stringers <br /> 6"X6" footing(12 6"X6" posts ong <br /> Note 15 assembly concrete 6. All fasteners and connectors used for the deck <br /> post inch depth) post footing(12 outside <br /> cantilevered(60" g will be approved for contact with preservative <br /> inch de th of end <br /> 's •./( span) — P ) joist treated wood in accordance IRC <br /> �� --I �'r s( 7. New deck framing(similar to current house deck) <br /> _ i t will include a ledger attached to the existing <br /> house rim joist with the joists attached at the <br /> Existing Deck _ 'J'10.5"on-centerjoist N.v L 1 •0' house and bearing over a beam <br /> 10.5"on.- 13.75"on- . 13.75"on- <br /> 2.5"on spacingconnectin 8. 8 inch joist hangers and 1%connector screws <br /> (12'X10' center joist 9 center joist��y' center joist��� will be used.Concealed flange hangers will be <br /> ) �nte� ~spacing the two headers s acin spacing Ei <br /> approx. 7.5' ✓ spacing �� P g installed on opposite end joists <br /> above grade _ r 9. Two 2"X8"beam assembly cantilevered L/4 max <br /> joist span(4 feet) <br /> 60"rim1 See 10. Deck posts with be notched to carry double deck <br /> joist Note 17 beam and fastened with hot dipped galvanized <br /> iii S e e <br /> • Note 17 Stairs 36"width with );II 'A inch through bolts,nuts,and washers <br /> 4 stringers 4X4 guardrail 11. Joist blocking over beam length will be fastened <br /> 4X4 guardrail (See pg.2) posts on outside to adjacent joists with 3 inch timber screws <br /> posts on outside of rim joist 12. Deck beam will be attached to joists with <br /> of rim joist hurricane ties <br /> 13. Two separate 2X8 inch nominal ledgers for the <br /> new 4'X5'decking needed due to existing bath <br /> One handrail exhaust vent on same plane as ledger and ledger <br /> on right side ------► attached with 4 inch ledger lock timber screws <br /> descending 14. Ledger and house rim board will be weather <br /> — protected with corrosion-resistant metal flashing <br /> _ — — and butyl peel and stick membrane <br /> 15. One double joist inboard of the end joist nearest <br /> the existing deck to support one deck board <br /> running parallel to the joist serving as a breaker <br /> board and support the butt ends of the new <br /> ,- ECEll <br /> decking boards running perpendicular to the <br /> 1)D breaker board and joists <br /> 16. Rim joist to joists will be connected using 8 inch <br /> timber screws <br /> MAY 1 9 2024 17. Guardrail posts will be secured with galvanized <br /> '/z"through bolts,nuts,and washers to interior <br /> CITY OF E VE R E TT joists using tension ties and blocking on end <br /> Permit Services joists. Configuration dependent on joint location <br /> to guardrail post position. <br />