My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5831 1ST AVE SE 2024 Plans 2024-11-26
>
Address Records
>
1ST AVE SE
>
5831
>
Plans
>
5831 1ST AVE SE 2024 Plans 2024-11-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 11:16:14 AM
Creation date
11/26/2024 11:16:07 AM
Metadata
Fields
Template:
Address Document
Street Name
1ST AVE SE
Street Number
5831
Permit
B2405-047
Year
2024
Notes
ADDITION OF LANDING AND STAIRS TO EXISTING DECK
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Address: <br /> Side View—Page 2 of 2 5831 1st Ave SE <br /> Everett Washington 98203 <br /> Existing deck behind Notes: <br /> proposed deck/stairs New guardrail 1. Two 2"X8"beam assembly cantilevered U4 <br /> addition in this side height 36" max joist span(4 feet) <br /> view minimum 2"X2"nominal 2. Deck posts with be notched to carry double <br /> I Openings<4" halt L--- deck beam and fastened with hot dipped <br /> L.t-z1 1 L J galvanized '/z inch through bolts,nuts,and <br /> * I • _ I washers <br /> « 3. Joist to joist blocking over beam length will be <br /> fastened to adjacent joists with 3 inch timber <br /> House screws <br /> — <br /> _ 4. Deck beam will be attached to joists with <br /> • • hurricane ties <br /> ,� !. ; 5. 14"round high strength concrete footings 12" <br /> Existing ._, deep and 6"thickness with 8"concrete pier <br /> Deck height P. 10 * , }* with above grade post connector <br /> 7'6"' *" I 6. Guardrail posts will be secured to interior <br /> — > joists using tension ties and blocking on end <br /> / ; joists. Configuration dependent on joint <br /> J <br /> location to guardrail post position. <br /> 7. Four stair stringers will be field notched from <br /> ` See 2X12 by 12"boards <br /> Seee 1 <br /> 8. Stairs estimated will have 12 rises of 7.5" <br /> t Note Trex deck Ledger and stringer trend depth of 10"and overall <br /> _,A11 2 Not boards <br /> i trend depth of 11.25"with the deck boards <br /> Stair See 9. Four stringers 9"on center will span the 36" <br /> / ' stringer Note 2 New deck end stair width as required by the Trex decking <br /> / I' r board manufacturer <br /> See header joist(46.5"span) <br /> ` - Note 10 10. 2X8"blocking will be added mid-stair run to <br /> 0 Stair stringer Two notched secure the four stair stringers <br /> — I • hanger 6X6 post to 11. Stairs guardrail height will be greater than 34" <br /> See double beam 12. Stair handrail on the right side descending <br /> Note 12 — vim Openings<6 One hand rail on connpctinns will be at least 34"from nosing of the step <br /> right side of stairs and the clear width of the stairway at and <br /> See descending <br /> below the handrail height will not be less than <br /> Note 9 Openings<4" 31.5" <br /> r ! Stairs estimated will <br /> have 12 rises and a 13. Bottom stair guardrail posts will terminate at <br /> total run of 9'2" Manufactured the bottom of the stair stringers and secured <br /> ILL to the stair stringers using /z inch through <br /> R3k See 40"X36"high strength concrete elevated post <br /> .7,b bolts, nuts and washers and tension ties and <br /> • Note 13 pad stair landing approximately connector blocking as needed. <br /> `b`7`"— 4"thick reinforced with <br /> High strength 14. The stair stringer header will be secured <br /> reinforcing mesh g g Ground surface The4X4post sections,2X8"joist to joist <br /> �—concrete mix using <br /> blocking and engineered tension ties to <br /> 8"round pier with <br /> r 5"concrete pad base 14"round Tooter base 6"or protect rim joist <br /> a;- , .g* ''' '1 .y' � of crushed stone 5/8" reinforced rebar 15. The stair risers will be closed with fascia <br /> ( terminating above I greater thickness no less boards <br /> Two 2"X4"baseplates to secure ushed gravel minus 1 I than 12"below ground <br /> ground level I 16. 40"X36"high strength concrete pad stair <br /> stringer base to concrete pad.Base surface <br /> plates will be secured with landing approximately 4"thick reinforced <br /> galvanized anchor bolts Projected stair total rise is 7' with reinforcing mesh <br /> 6"'and total run is 9'2"' 17. Two 2"X4"base plates to secure stringer <br /> base to concrete pad. Base plates will be <br /> secured with galvanized anchor bolts <br />
The URL can be used to link to this page
Your browser does not support the video tag.