Laserfiche WebLink
# <br />PUD Staff: <br />Project Name: <br />Pre-Conditions Post-Conditions <br />Qualifying ARC retrofit applications have the following characteristics: <br />• Heating type is electric or gas. <br />• Existing RTU has the following characteristics:• A VFD and controller for variable speed fan operation; or <br />• A unitary system (split-systems are not eligible),• A multispeed motor and controller for multispeed fan operation <br />• A constant-speed supply fan (RTUs with variable speed fans are not eligible), and <br />• Less than 20 years old and in good working order.• Digital, integrated economizer control; and <br />• Web-enabled control, monitoring and alarms. <br />The ARC and ARC-Lite products must be on the BPA ARC Qualified Product List. <br />Rebates and Savings <br />Unit ID Pre-Insp. <br />Complete? <br />Rated Cooling <br />Capacity <br />(Btu/h) <br />Heat <br />Type <br />Operating <br />Hours per Year <br />Proposed <br />ARC Type <br />Rounded <br />Cooling <br />Tonnage <br />Avg. <br />kWh/Ton/ <br />Yr Savings <br />Estimated <br />kWh/Unit/ <br />Yr Savings <br />Rebates <br />per Unit* <br />RTU#1 Yes 180,000 Electric 2,500 - 5,500 ARC 15.0 866.0 12,990 $3,750.00 <br />RTU#2 Yes 90,000 Electric 2,500 - 5,500 ARC 7.5 866.0 6,495 $1,875.00 <br />RTU#3 Yes 90,000 Electric 2,500 - 5,500 ARC 7.5 866.0 6,495 $1,875.00 <br />RTU#4 Yes 120,000 Electric 2,500 - 5,500 ARC 10.0 866.0 8,660 $2,500.00 <br />RTU#5 Yes 60,000 Electric 2,500 - 5,500 ARC 5.0 866.0 4,330 $1,250.00 <br />RTU#6 Yes 90,000 Electric 2,500 - 5,500 ARC 7.5 866.0 6,495 $1,875.00 <br />52.5 45,465 $13,125.00 <br />Project Development Incentive:$2,625.00 <br />*Total Rebate is capped at approved project cost. <br />Contractor Info, Proposed Controller & Project Cost <br />Proposed ARC Product Name Proposed ARC-Lite Product Name Project Cost* <br />Version August 2024 - Effective Date August 1st, 2024 * Cost should include equipment, labor, permit and tax. <br /> Energy Services ● eebiz@snopud.com ● www.snopud.com <br />Both ARC and ARC-Lite retrofits must add one of the following equipment options to the <br />existing RTU: <br />The ARC Retrofit applications must also include a controller with both of the following capabilities: <br />Rob Marks <br />Advanced Rooftop Unit Control (ARC)City of Everett Serv Cntr 2024-08 R-ARC <br />• $250/Ton for ARC Retrofits <br />• $150/Ton for ARC Lite Retrofits <br />Rebate Application <br />$18,825.04 <br />Trane WSC090E4RGA0901B <br />Pelican Wireless Systems - Pelican zone controller Z8 or Z24, or PEARL Economizer <br />Model # <br />Trane WCH180E40BAB <br />Trane WSC090E4RGA09D1B <br />Trane WSC090E4RGA09D1B <br />Trane WSC120E4RGA08D0B <br />Trane WSC060E4RGA10D08 <br />PUD APPROVED <br />By ST on 11/12/24 7:36PM <br />City of Everett Serv Cntr 2024-08 R-ARC <br /># <br />11/12/2024, 7:36 PM