My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
600 54TH ST SW Utility Plans 2024-12-04
>
Address Records
>
54TH ST SW
>
600
>
Utility Plans
>
600 54TH ST SW Utility Plans 2024-12-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2024 7:44:04 AM
Creation date
12/4/2024 7:37:55 AM
Metadata
Fields
Template:
Address Document
Street Name
54TH ST SW
Street Number
600
Permit
PW2010-022
Address Document Type
Utility Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NW 1/4, SEC. 11 T.28 N", R.4 E", W.M. <br />CITY OF EVERETT, WASHINGTON <br />SEAHURST MANOR 23 `\ 23// AV PROPOSE ti CL 29043600306600 <br />22 VOL. 25, Pc. 101 ' - - -0.� - / HE / 0.7' \ BLOCK <br />j�' 4 8-55'17- E 211.86' <br />}FW6LLI <br />CHAIN LINK FENCE _ — — — � — <br />1-------- ------ <br />----- -f I 8'S3'15"E 197.83" \�\�. <br />j ZHE� I �0 <br />ijl <br />PRbPOS16 ' ' / , / \\\\\\ \ \ \ <br />OCK <br />SP #36-95 <br />I A.F.19608055003 <br />PROPOSED N <br />5 WALL <br />j'�/��—) <br />I ' l PRO Os <br />i _ Illl I I I I I <br />\ / BLOCK <br />PL °� WALL <br />i } I <br />- - - - - <br />N <br />SP #36-95 o III I I \ � <br />7 A.F.Jf9608055003 _ <br />I//-,�� I � � I (� I � <br />PEDESTRIAN <br />/I 00436 000� 0 <br />IIIII / 1. 1 %�O 28040 0010 0 TR,1%I� / It <br />CL <br />00 <br />CL <br />CL <br />\ \ \\5PEDESTRIAN <br />EASEMENT \ \ \\ \\ <br />✓ 1 <br />1 <br />---- pTV 1 e <br />/ <br />2 <br />\`\ `\ \ \I \ `\ \ \ S. P.J�1202-53-97 I I \ \ _ <br />_ PROPOSED <br />a \ \ _ ` \ \ \ <br />F.#98,2,45002 \, \ \\ ROCKERY (TYP.) \�, i i III I I it = I \I / <br />101 111 I f J <br />\ \ \\ ' ' 'i \\\\\ IIII III I111 <br />N 8/ <br />8R'38 30" E i I \ 1 I t i \ \ I IIII <br />c� IIIII 1 <br />II------------- <br />I I I I 7EAP <br />SiOCKPllE - <br />AREA IIIIIIIIIIII I II IIII IIII IIII II IIIIIIII III <br />/ I <br />I / <br />00436800003703 <br />HOUSE PL-- T41111 <br />/ / ' / _ <br />� T2 1�c I C VA II I <br />4.14'06 I I L=10.33 I I � =%--J III III IIII I <br />- ---- �1 (T 991 I IIII, IIIIIIIIIII 7 0� <br />R=139.!"4/ / �- 1 1 \ / / — �/ — / / / I I III III I IIII IIIII 1 1 / lI I l I <br />l I l l I III IIII 1 1 1 1 1 1 1 1 I I / i l l l� I� �/ i /JGRAVEL <br />1 / <br />�54r <br />r�nrsrrr�nnnrnnn, <br />Know whars below. <br />Cali before you dig. <br />UTILITY CONFLICT NOTE.' <br />CAUTION.' <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, <br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE <br />PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL <br />AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS AND THEN SHALL <br />INCLUDE CALLING UTILITY LOCATE ® 1-800-424-5555 POTHOLING ALL OF THE <br />EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY <br />VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS <br />SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC <br />INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, <br />THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO <br />RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />15' SEWER —� <br />EASEMENT TO <br />CITY OF EVERETT / <br />RECORDED <br />1202009230693 <br />ZZI <br />--7 <br />2, <br />\ / I <br />i <br />I I I I <br />I I I <br />I <br />LOT I <br />I <br />1 1 <br />\ 11 I <br />Z 1 i i i <br />THE 13 ELEMENTS OF SWPPP BMP <br />ELEMENT J/1 - MARK CLEARING LIMITS: <br />LIMIT OF CONSTRUCTION ARE CLEARLY MARKED. <br />ELEMENT J/2 - ESTABLISH CONSTRUCTION ACCESS: <br />A STABILIZED CONSTRUCTION ENTRANCE IS SHOWN. <br />ELEMENT J/3 - CONTROL FLOW RATES: <br />THE DETENTION VAULT WILL BE USED FOR SEDIMENT STORAGE DURING <br />CONSTRUCTION. <br />ELEMENT 14 - INSTALL SEDIMENT CONTROLS: <br />SILT FENCE, INLET PROTECTION, MULCH, INTERCEPTOR SWALES AND <br />SEDIMENT POND ARE PROPOSED. <br />ELEMENT J/5 - STABILIZE SOILS: <br />SOIL STABILIZATION IS ACHIEVED BY MULCHING, PLASTIC COVERING AND <br />SEEDS. <br />ELEMENT J/6 - PROTECT SLOPES: <br />SLOPES ARE PROTECTED BY PLASTIC COVERING, MULCHING AND SEEDS. <br />ELEMENT J/7- PROTECT DRAIN INLETS: <br />INLET PROTECTIONS ARE PROPOSED FOR THE STORM DRAINS. <br />ELEMENT18 - STABILIZE CHANNELS AND OUTLETS: <br />OUTLET PROTECTIONS ARE PROPOSED. <br />ELEMENT J/9 - CONTROL POLLUTANTS: <br />ALL VEHICLES, EQUIPMENT AND PETROLEUM PRODUCT <br />STORAGE/DISPERSING AREAS WILL BE INSPECTED REGULARLY TO <br />DETECT ANY LEAKS OF SPILLS, AND TO IDENTIFY MAINTENANCE NEEDS <br />AND PREVENT LEAKS OF SPILLS. <br />ELEMENT J/10 - CONTROL DEWATERING: <br />THERE WILL BE NO DEWATERING AS PART OF THIS CONSTRUCTION <br />PROJECT. <br />ELEMENT J/II- MAINTAIN BMP's: <br />ALL TEST BMPs SHALL BE MAINTAINED AND REPAIRED AS NEEDED. <br />ELEMENT J/12 - MANAGE THE PROJECT. - <br />THIS COULD BE ACHIEVED BY MINIMIZING THE EXTENT AND DURATION <br />OF THE AREA EXPOSED AND BY EMPHASIZING EROSION CONTROL THEN <br />SEDIMENT CONTROL. <br />ELEMENT J/13 - PROTECT ON -SITE STORMWATER MANAGEMENT BMP'S <br />FOR RUNOFF FROM ROOFS AND OTHER HARD SURFACES: N/A <br />n Tn1rnc. <br />1. CESCL CONTACT INFORMATION MUST BE SUBMITTED TO <br />CITY INSPECTOR PRIOR TO ANY WORK. <br />2. CITY STREETS ARE TO BE KEPT CLEAN OF DIRT AND <br />DEBRIS AT ALL TIMES DURING CONSTRUCTION. DUST <br />SUPPRESSION AND STREET CLEANING MUST OCCUR AS <br />DIRECTED BY PUBLIC WORKS INSPECTOR. <br />3. ALL EXPOSED GROUND MUST BE RESEEDED WITHIN 30 <br />DAYS OF COMPLETION OF CONSTRUCTION. IF RESEEDING <br />IS NOT PRATICAL DUE TO WEATHER OR SEASONAL <br />PROBLEMS, THE GROUND MUST BE COVERED WITH MULCH <br />AS DIRECTED BY THE CITY ENGINEER. <br />4. TEMPORARY EROSION CONTROL MEASURES FOR <br />CONSTRUCTION ACTIVITY MUST BE OPERATIONAL PRIOR TO <br />COMMENCEMENT OF ANY CLEARING OR EARTHWORK. <br />5. ALL ACCESS ROADS AND DRIVEWAYS SHALL HAVE A <br />MAXIMUM GRADE OF 15% TO MEET TRAFFIC STANDARDS. <br />SCALE: I" = 30' <br />30 60 0 30 60 <br />CONSTRUCTIONSEQUENCE <br />1. PRIOR TO CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL <br />SCHEDULE AND ATTEND PRE -CONSTRUCTION CONFERENCE WITH THE <br />CITY OF EVERETT INSPECTION UNIT AND EROSION CONTROL SPECIALIST. <br />2. FLAG CLEARING LIMITS AND INSTALL SILT FENCE AS SHOWN. <br />3. INSTALL ROCK CONSTRUCTION ENTRANCE. <br />4. CLEAR AND GRUB ROAD AREAS, AND STOCKPILE AREAS. CONSTRUCT <br />DETENTION VAULT AND THE OUTFALL AND USE IT AS SEDIMENT POND <br />INSTALL TEMPORARY EROSION CONTROL BMP's SUCH AS INTERCEPTOR <br />TRENCHES, CHECK DAMS, ETC. AND DIRECT RUNOFF TO THE <br />SEDIMENT POND. <br />5. GRADE AND STABILIZE ROAD WITH GRAVEL BASE COVER EXPOSED <br />SOILS WITH MULCH, HOG FUEL OR HYDROSEED. <br />6. CONSTRUCT WATER AND STORM UTILITIES. INSTALL GAS, POWER, <br />TELEPHONE AND CABLE UTILITIES, AS REQUIRED. <br />7. PLACE AND POUR CURBS AND GUTTERS. <br />8. PAVE ROADS WITH ATB AND PLACE DETENTION SYSTEM INTO FULL <br />OPERATION. <br />9. HYDROSEED REMAINING EXPOSED SOILS AND STABILIZE PROJECT. <br />10. FLUSH STORM DRAINAGE SYSTEM AND REMOVED SEDIMENTATION IN <br />ALL CATCH BASINS AND THE VAULT. <br />11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED <br />WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR <br />AFTER THE TEMPORARY BMP's ARE NO LONGER NEEDED. TRAPPED <br />SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED <br />SOIL ARE45 RESULTING FROM REMOVAL SHALL BE PERMANENTLY <br />STABILIZED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.