Laserfiche WebLink
NW 1/4, SEC. 11 T.28 N, R.4 E, W.M. <br />CITY OFEVERETT, WASHINGTON <br />EASEMENT AND UTILITY NOTES <br />NOTES <br />ATTACH IN A MANNER THAT POST SEE WSDOT STANDARD <br />1. INSTALL THE ENDS OF THE SILT FENCE TO POINT <br />ASSURES FABRIC IS FIRMLY SPECIFICATIONS 8-01.3(9)A <br />HELD BY THE BACKUP SLIGHTLY UPSLOPE TO PREVENT SEDIMENT FROM <br />SUPPORT IN A WAY THAT FLOWING AROUND THE ENDS OF THE FENCE. <br />REDUCES THE POTENTIAL <br />FOR FABRIC TEARING 2. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />FASTEN GEOTEXTILE TO WSDOT STANDARD SPECIFICATIONS 8-01.3(9)A <br />POST EVERY 6" IN O.C. AND 8-01.3(15). <br />BACKUP SUPPORT 3. SPLICES SHALL NEVER BE PLACED IN LOW SPOTS <br />OR SUMP LOCATIONS. IF SPLICES ARE LOCATED IN <br />o z LOW OR SUMP AREAS, THE FENCE MAY NEED TO <br />BACKFILLED & `" SELF-LOCKING TIE-NYLONE BE REINSTALLED UNLESS OTHERWISE APPROVED. <br />COMPACTED II 6/6 (MIN GRADE) <br />NATIVE SOIL GEOTEXTILE � 120#MIN TENSILE STRENGTH4. INSTALL SILT FENCING PARALLEL TO MAPPED <br />, <br />UV STABILIZED CONTOUR LINES. <br />FLOW <br />5. DURING EXCAVATION, MINIMIZE DISTURBING <br />XT THE GROUND AROUND TRENCH AS MUCH AS IS <br />FEASIBLE, AND SMOOTH SURFACE FOLLOWING <br />EXCAVATION TO AVOID CONCENTRATING FLOWS. <br />\ COMPACTION MUST BE ADEQUATE TO PREVENT <br />BURY GEOTEXTILE UNDERCUTTING FLOWS. <br />IN TRENCH <br />sF BACKUP SUPPORT <br />GEOTEXTILE FOR SILT FENCE F TYPICAL <br />20�� STEEL POST (TYPICAL) <br />o SEE STANDARD SPECIFICATION <br />(TYPICAL) <br />SECTION 9-33.2 (1), TABLE 6 <br />TYPICAL INSTALLATION DETAIL �� /��c_`P FABRIC <br />� <br />(GEOTEXTILE) <br />(TYPICAL) <br />INSTALL BACKUP SUPPORT FOR i <br />THE GEOTEXTILE SEE STANDARD i <br />SPECIFICATION SECTION 8.01.3(9)A <br />o <br />to <br />i <br />�C II <br />G <br />SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER <br />z <br />i TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE <br />Z <br />6 <br />QUO FENCE AT THE OVERLAP. <br />SPLICE DETAIL <br />WSDOT STD PLAN 1-30.10-02 ACCEPTABLE SUBSTITUTE <br />w <br />TYPICAL SILT FENCE <br />I EXCEPT STEEL POST REQUIRED <br />WITH BACKUP SUPPORT <br />W <br />ISOMETRIC CITY OF EVERETT <br />4Err <br />s I o\_ <br />PUBLIC WORKS DEPARTMENT <br />Q <br />I / City Engineer Section Manager CAD Manager Drawn By Current Rev Date <br />O <br />o <br />RYAN SASS HEATHER GRIFFIN PAUL WILHELM ESH <br />TITLE 03/17/2017 <br />STANDARD DRAWING No. <br />TEMPORARY SILT FENCE 214 <br />qQ <br />-E-� <br />W1 TEMPORARY SILT FENCE <br />C2.2 N.T.S. (STD. DWG. 214) <br />NOTES <br />1. STABILIZED CONSTRUCTION ENTRANCE SHALL <br />MEETTHE REQUIREMENTS OF WSDOT STANDARD <br />SPECIFICATION SECTION 8-01.3(7). <br />INSTALL DRIVEWAY CULVERT <br />IF THERE IS A ROADSIDE DITCH <br />25 PRESENT <br />25, <br />ROAD <br />EX15T1NG <br />30' MIN TYPICAL <br />PERMEABLE BALLAST TYPICAL SEE <br />_ <br />- - STANDARD SPECIFICATION <br />SECTION 9-03.9(2) <br />U <br />1' MIN <br />LENGTH AS REQUIRED 100' MIN, EXCEPT DEPTH <br />MAY BE REDUCED TO 50' MIN FOR TYPICAL <br />SITES WITH LESS THAN ONE ACRE <br />OF EXPOSED SOIL OR APPROVED BY INSPECTOR <br />3 <br />0 <br />s <br />PLACE CONSTRUCTION GEOTEXTILE FOR SOIL <br />STABILIZATION FROM THE EDGE OF THE EXISTING PROVIDE FULL WIDTH OF <br />o <br />ROADWAY TO THE CONSTRUCTION ENTRANCE, INGRESS/EGRESS AREA <br />Z <br />OR AS DIRECTED BY THE ENGINEER 15' MIN <br />a <br />O <br />o <br />ISOMETRIC VIEW <br />CONSTRUCTION ENTRANCE WSDOT STD PLAN 1-80.10-02 ACCEPTABLE SUBSTITUTE <br />z <br />0 <br />CITY OF EVERETT <br />Z a <br />E <br />PUBLIC WORKS DEPARTMENT <br />w0 <br />U M <br />N <br />City Engineer Section Manager CAD Manager Drawn BY Current Rev Date <br />RYAN SASS HEATHER GRIFFIN PAUL WILHELM ESH 04/03/2017 <br />TITLE <br />STANDARD DRAWING No. <br />w ""I <br />a a k <br />0 <br />a � a <br />CONSTRUCTION ACCESS 201 <br />3 CONSTRUCTION ACCESS <br />C2.2 N. T. S. (STD. DWG. 20 1) <br />Know what's below. <br />Call before you dig. <br />UTILITY CONFLICT NOTE. - <br />CAUTION: <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, <br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE <br />PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL <br />AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS AND THEN SHALL <br />INCLUDE CALLING UTILITY LOCATE ® 1-800-424-5555 POTHOLING ALL OF THE <br />EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY <br />VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS <br />SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC <br />INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, <br />THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO <br />RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />NOTES <br />5" MAX <br />1. CATCH BASIN INSERTS SHALL BE REMOVED AT THE <br />END OF THE PROJECT. <br />DRAINAGE GRATE <br />TRIM <br />2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN <br />DRAINAGE DEVICES PER THE MANUFACTURES'S <br />RECOMMENDATIONS. CATCH BASIN INLET INSERTS <br />GRATE FRAME <br />OVERFLOW BYPASS <br />SHALL BE INSTALLED IN CURB INLETS. <br />SEDIMENT <br />BELOW INLET GRATE <br />3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO <br />AND DEBRIS <br />DEVICE <br />CLEARING AND GRADING ACTIVITY, OR UPON <br />PLACEMENT OF A NEW CATCH BASIN. <br />FILTERED WATER <br />4. SEDIMENT SHALL BE REMOVED FROM THE UNIT <br />a,. <br />WHEN IT BECOMES ONE THIRD FULL OR IN <br />ACCORDANCE WITH THE MANUFACTURES' <br />INSTRUCTIONS. <br />5. SEDIMENT REMOVAL SHALL BE ACCOMPLISHED BY <br />REMOVING THE INLET INSERTS, EMPTYING, AND <br />RE -INSTALLING IT INTO THE CATCH BASIN. DO NOT <br />WASH SEDIMENT INTO STORM DRAINS WHILE <br />CLEANING. <br />6. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE <br />STORM WATER STRUCTURE IT WILL SERVICE. <br />7. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF <br />SYSTEM (OVERFLOW BYPASS). <br />SECTION VIEW <br />8. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF <br />THE BIGD WITHOUT SPILLING THE COLLECTED <br />MATERIAL. <br />9. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />RETRIEVAL SYSTEM <br />STANDARD SPECIFICATION 8-01.3(15). <br />TYPICAL <br />DRAINAGE GRATE <br />0 <br />0 <br />N <br />0 <br />Y <br />K <br />0 <br />Z <br />Z <br />0 <br />WSDOT STD PLAN 1-40.20-00 ACCEPTABLE SUBSTITUTE IF <br />o <br />LL <br />BELOW INLET GRATE <br />MAINTENANCE MEETS NOTES 1-5 <br />DEVICE <br />OVERFLOW BYPASS <br />z <br />TYPICAL <br />CITY OF EVERETT <br />Z <br />L, N <br />w � <br />PUBLIC WORKS DEPARTMENT <br />0 ti <br />w <br />0N <br />City Engineer Sec - Manager CAD Manager Drawn By Current Rev Date <br />RYAN SASS HEATHER GRIFFIN PAUL WILHELM ESH <br />TITLE 12/30/2016 <br />y <br />ISOMETRIC VIEW <br />STANDARD Nu. <br />Uk <br />STORM DRAIN INLET <br />E <br />d�a <br />21DRAWIOG <br />PROTECTION <br />2 STORM DRAIN INLET PROTECTION <br />��2N. T. S. (STD. DWG. 210) <br />TESC & GRADING NOTES <br />1. THE TEMPORARY EROSION CONTROL SYSTEM SHALL BE INSTALLED PRIOR TO ALL OTHER CONSTRUCTION. <br />2. WHERE POSSIBLE, MAINTAIN NATURAL VEGETATION FOR SILT CONTROL. <br />3. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE EROSION CONTROL FACILITIES <br />SHALL BE MAINTAINED AND/OR ALTERED AS REQUIRED BY THE CITY ENGINEER TO ENSURE CONTINUING <br />EROSION/SEDIMENTATION CONTROL. <br />4. ALL DISTURBED AREAS THAT WILL BE LEFT FOR 30 DAYS OR MORE DURING THE PERIODS OF MARCH 1 TO <br />MAY 15 AND AUGUST 15 TO OCTOBER 1 SHALL BE IMMEDIATELY SEEDED WITH A MIX AND BY A METHOD <br />APPROVED BY THE CITY OF EVERETT PUBLIC WORKS DEPARTMENT AND MAINTAINED UNTIL SEED GERMINATION <br />IS ASSURED. IN ADDITION TO SEEDING, SLOPES OF 25% OR GREATER WILL BE MULCHED WITH 2.0 TONS OF <br />STRAW PER ACRE, OR WITH AN APPROVED EQUAL. <br />DURING THE REST OF THE YEAR, TEMPORARY SOIL STABILIZATION MUST BE APPLIED IMMEDIATELY TO <br />DISTURBED AREAS THAT WILL BE LEFT EXPOSED FOR 7 DAYS OR MORE, AND IMMEDIATELY TO SLOPES <br />GREATER THAN 25Z WILL BE LEFT EXPOSED FOR 3 DAYS OR MORE. <br />5. THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN. TRACKING OF MUD AND DEBRIS FROM THE SITE WILL <br />NOT BE ALLOWED. FAILURE TO COMPLY WITH THIS CONDITION WILL RESULT IN ALL WORK ON THE SITE <br />BEING STOPPED. <br />6. GRADING OUTSIDE CITY RIGHT-OF-WAY SHALL CONFORM TO CHAPTER 70, UNIFORM BUILDING CODE. <br />7. COMPACT ALL FILLS TO MINIMUM 95% MAXIMUM DENSITY. <br />8. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO <br />INSURE THAT SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. AS CONSTRUCTION <br />PROGRESSES AND UNEXPECTED (SEASONAL) CONDITIONS DICTATE, MORE SILTATION CONTROL FACILITIES MAY <br />BE REQUIRED TO INSURE COMPLETE SILTATION CONTROL OF THE PROPOSED PROJECT. THEREFORE, DURING <br />THE COURSE OF CONSTRUCTION IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO <br />ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL <br />FACILITIES THAT MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES. <br />9. SUITABLE NATIVE MATERIAL EXCAVATED DURING TRENCHING SHALL BE USED FOR TRENCH BACKFILL UNLESS <br />NOTIFIED BY THE CITY ENGINEER THAT THE NATIVE MATERIAL IS UNSUITABLE. THE CITY ENGINEER, OR HIS <br />REPRESENTATIVE, WILL EXAMINE EXCAVATED NATIVE MATERIAL AT THE TIME OF EXCAVATION TO DETERMINE ITS <br />SUITABILITY FOR USE AS BACKFILL. NATIVE MATERIAL WILL BE CONSIDERED SUITABLE FOR TRENCH BACKFILL <br />IF IT IS: <br />A. CAPABLE OF ATTAINING THE DEGREE OF COMPACTION SPECIFIED IN D COMPACTION. <br />B. WITHIN REASONABLE TOLERANCE OF OPTIMUM MOISTURE CONTENT. <br />C. REASONABLY FREE OF ORGANIC MATERIAL, CLAY, FROZEN LUMPS, ROCKS OR OTHER DELETERIOUS <br />MATTER. <br />10. UNSUITABLE BACKFILL MATERIAL SHALL BE REMOVED FROM THE SITE AND HAULED TO AN APPROVED <br />DISPOSAL SITE. THE CITY ENGINEER SHALL BE PROVIDED WITH THE LOCATION OF ALL DISPOSAL SITES TO <br />BE USED AND ALSO COPIES OF THE PERMITS AND APPROVALS OF SUCH DISPOSAL SITES. <br />11. IMPORTED MATERIAL SHALL MEET THE REQUIREMENT OF GRAVEL BORROW AS SPECIFIED IN SECTION 3.16.1.3 <br />OF THE DESIGN AND CONSTRICTION STANDARDS AND SPECIFICATIONS, OR CRUSHED SURFACING TOP COURSE <br />AS SPECIFIED IN SECTION 9-03.9(3) OF THE 1991 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND <br />MUNICIPAL CONSTRUCTION. <br />12. TRENCH BACKFILL SHALL BE SPREAD IN LAYERS AND COMPACTED BY MECHANICAL TAMPERS OF THE IMPACT <br />TYPE APPROVED BY THE CITY ENGINEER. THE BACKFILL MATERIAL SHALL BE PLACED IN SUCCESSIVE LAYERS <br />WITH THE FIRST LAYER NOT TO EXCEED 2 FEET ABOVE THE PIPE, AND THE FOLLOWING LAYERS NOT <br />EXCEEDING 12 INCHES IN LOOSE THICKNESS, WITH EACH LAYER BEING COMPACTED TO THE DENSITY <br />SPECIFIED BELOW: <br />A. IMPROVED AREA SUCH AS STREET AND SIDE WALK AREAS SHALL BE COMPACTED TO 909 OF MAXIMUM DRY <br />DENSITY TO WITHIN 3 FEET OF SUBGRADE. THE LAST 3 FEET SHALL BE COMPACTED TO 95Z OF MAXIMUM <br />DRY DENSITY. <br />B. UNIMPROVED AREAS OR LANDSCAPE AREAS SHALL BE COMPACTED TO 90q OF MAXIMUM DRY DENSITY. <br />13. TEMPORARY SILTATION PONDS AND ALL TEMPORARY SILTATION CONTROLS SHALL BE MAINTAINED IN A <br />SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETED, <br />PERMANENT DRAINAGE FACILITIES ARE OPERATIONAL, AND THE POTENTIAL FOR EROSION HAS PASSED. <br />14. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, SIZE, NOR LOCATION OF PIPES, <br />RESTRICTORS, OR DETENTION FACILITIES, BUT IS AN APPROVAL OF GRADING AND SEDIMENTATION CONTROL <br />PLAN ONLY. <br />COE TESC NOTES <br />1. Approval of this erosion/sedimentation control (ESC) plan does not constitute an approval of <br />permanent road or drainage design (e.g. size and location of roads, pipes, restrictors, channels, <br />retention facilities, utilities). <br />2. The implementation of these ESC plans and the construction, maintenance, replacement, and <br />upgrading of these ESC facilities is the responsibility of the applicant/contractor until all <br />construction is completed and approved and vegetation/landscaping is established. <br />3. The boundaries of the clearing limits shown on this plan shall be clearly flagged in the field prior <br />to construction. During the construction period, no disturbance beyond the flagged clearing limits <br />shall be permitted. The flagging shall be maintained by the applicant/contractor for the duration <br />of construction. <br />4. The ESC facilities shown on this plan must be constructed in conjunction with all clearing and <br />grading activities, and in such a manner as to ensure that sediment and sediment laden water do <br />not enter the drainage system, roadways, or violate applicable water quality standards. <br />5. The ESC facilities shown on this plan are the minimum requirements for anticipated site <br />conditions. During the construction period, these ESC facilities shall be upgraded as needed for <br />unexpected storm events and to ensure that sediment and sediment -laden water do not leave the <br />site. <br />6. The ESC facilities shall be inspected routinely and maintained by the applicant/contractor to <br />ensure their continued functioning, especially after storm events. <br />7. The ESC facilities on inactive sites shall be inspected and maintained a minimum of once a <br />month or within the 48 hours following a major storm event. <br />8. At no time shall more than one foot of sediment be allowed to accumulate within a trapped catch <br />basin. All catch basins and conveyance lines shall be cleaned prior to paving. The cleaning <br />operation shall not flush sediment laden water into the downstream system. <br />9. Stabilized construction entrances shall be installed at the beginning of construction and <br />maintained for the duration of the project. Additional measures may be required to ensure that all <br />paved areas are kept clean for the duration of the project. <br />10. The Contractor shall provide periodic street cleaning to remove debris and sediment tracked off <br />the site. <br />11. Appropriate measures shall be taken to stop sediment from entering surface water bodies if the <br />proposed BMPs fail. <br />12. Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no more than 2 days <br />from October 1 through April 30, and for no more than 7 days from May 1 through September 30. <br />NOTES <br />1. CITY STREETS ARE TO BE KEPT CLEAN OF DIRT AND DEBRIS AT ALL TIMES DURING CONSTRUCTION. DUST <br />SUPPRESSION AND STREET CLEANING MUST OCCUR AS DIRECTED BY PUBLIC WORKS INSPECTOR. <br />2. ALL EXPOSED GROUND MUST BE RESEEDED WITHIN 30 DAYS OF COMPLETION OF CONSTRUCTION. IF <br />RESEEDING IS NOT PRATICAL DUE TO WEATHER OR SEASONAL PROBLEMS, THE GROUND MUST BE COVERED <br />WITH MULCH AS DIRECTED BY THE CITY ENGINEER. <br />3. TEMPORARY EROSION CONTROL MEASURES FOR CONSTRUCTION ACTIVITY MUST BE OPERATIONAL PRIOR TO <br />COMMENCEMENT OF ANY CLEARING OR EARTHWORK. <br />4. ANY GRADING/FILL ON THIS SITE SHALL BE DONE IN A MANNER THAT DOES NOT IMPACT THE SURROUNDING <br />PROPERTIES. <br />EROSION CONTROL DEVICES NOTES <br />ADDITIONAL EROSION AND SEDIMENT CONTROL MAY BE REQUIRED AS PER INSPECTORS DIRECTION <br />CONSTRUCTION. <br />1. 5" MIN SEPARATION BETWEEN CITY OPERATED UTILITIES AND OTHER PRIVATE AND PUBLIC OPERATED UTILITIES <br />(PUD, CABLE TV, PHONE, GAS ETC.) <br />2. NON CITY OPERATED PUBLIC UTILITIES MAY CROSS CITY EXCLUSIVE EASEMENT ONLY BETWEEN 450 AND 900 <br />WITH RIDGED STEEL CONDUIT OR PVC CONDUIT ENCASED IN RED CONCRETE AT THE PUBLIC WORKS <br />INSPECTORS OPTION. <br />3. CONDUIT DUCTING SHALL HAVE A MINIMUM COVER OF 3' AND NOT OBSTRUCT CROSSING BY OTHER UTILITIES <br />FOR A VERTICAL DISTANCE GREATER THAN 3' IN EITHER EASEMENT. <br />4. ONLY CITY OPERATED UTILITIES SHALL BE ALLOWED WITHIN CITY EXCLUSIVE EASEMENT NO OTHER <br />EASEMENTS MAY BE GRANTED WITHIN THE LIMITS OF THIS EASEMENT. <br />GENERAL NOTES <br />1. FOR ANY EASEMENT ACCESS OR EASEMENT WITH PUBLIC UTILITIES, THE CITY ENGINEER SHALL DETERMINE <br />THE REQUIRED EASEMENT WIDTH BASED ON CITY STANDARDS. <br />2. WITH THE EXCEPTION OF THE EASEMENT ACCESS DRIVE, NO NEW DRIVEWAYS OR PARKING AREAS WILL BE <br />PERMITTED WITHIN THE FRONT YARD SETBACK AREA FOR ALL LOTS THAT FRONT ON THE PUBLIC STREET. <br />3. ACCESS OFF AN EASEMENT DRIVE IS LIMITED TO ONE TWENTY FOOT DRIVEWAY AND CURB CUT PER LOT. <br />THE DRIVEWAY SHALL NOT EXCEED TWENTY FEET IN WIDTH FOR A DISTANCE OF TWENTY FEET FROM THE <br />EASEMENT ACCESS DRIVE CURB. THE MINIMUM PARKING STALL WIDTH FOR TWO CARS IN FRONT OF THE <br />GARAGE IS 20 FEET BY 20 FEET - TWO (2) STALLS. THE MINIMUM PARKING PAD FOR 4 OFF-STREET IS <br />20 FEET BY 40 FEET. <br />4. SURFACE PARKING: EMC18.28.120 SURFACE PARKING IS ONLY PERMITTED ON A LOT WITH AN EXISTING <br />HOUSE. THE PARKING AREA MAY NOT BE BETWEEN THE EXISTING HOUSE AND THE PUBLIC STREET. THE <br />PARKING PAD MUST BE A MINIMUM OF 20 FEET BY 40 FEET AND BE A MINIMUM OF 5 FEET AWAY FROM <br />ANY NEW PROPERTY LINE AND MAY NOT BE WITHIN THE REQUIRED OPEN SPACE. <br />5. GARAGES. ENC18.28.150 ON ALL NEW LOTS WHERE PROPOSED SINGLE FAMILY DWELLINGS ARE PROPOSED A <br />TWO (2) CAR GARAGE IS REQUIRED. <br />6. EMC 18.28.120 ALL DEVELOPMENT STANDARDS FOR EASEMENT ACCESS DRIVE MUST BE MET. <br />CONTRA CTOR RESPONSIBILITY FOR ER OSION/SIL TA TION CONTR OL <br />IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL PLAN THAT STORM WATER RUNOFF BE <br />CONTROLLED AT ALL TIMES TO PREVENT SOIL EROSION AND TO MAINTAIN WATER QUALITY. ANY AND ALL <br />MEASURES NECESSARY TO DO SO SHALL BE EMPLOYED BY THE CONTRACTOR. <br />1. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDITIONS, THE CONTRACTOR SHALL BE FULLY <br />RESPONSIBLE FOR ENSURING THAT EROSION DOES NOT OCCUR ON THE SITE AND THAT POLLUTED OR <br />SILT -LADEN RUNOFF DOES NOT LEAVE THE SITE OR ENTER INTO ANY CREEK, STREAM, WETLAND OR <br />WATER BODY ON THE SITE. <br />2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR SELECTING AND IMPLEMENTING APPROPRIATE METHODS, "BEST MANAGEMENT PRACTICES" (BMPS), FOR <br />STORM WATER TREATMENT AND CONTROL THAT MEET THE REQUIREMENTS OF BOTH THE WASHINGTON STATE <br />DEPARTMENT OF ECOLOGY AND THE CITY OF EVERETT <br />3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES TO THE PROJECT ENGINEER <br />AND THE CITY INSPECTOR. IN THE EVENT THAT THE INSTALLED WATER QUALITY CONTROL MEASURES ARE <br />INEFFECTIVE AT CONTROLLING EROSION AND SILTATION, THE CONTRACTOR SHALL IMMEDIATELY REPORT TO <br />AND CONSULT WITH THE PROJECT ENGINEER TO FIND AN APPROPRIATE REMEDY. ALL CONSTRUCTION <br />ACTIVITIES, WITH THE EXCEPTION OF EROSION AND SILTATION CONTROL MEASURES, SHALL CEASE UNTIL <br />SUCH TIME AS THE WATER QUALITY IS BROUGHT UNDER CONTROL. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS AND ANTICIPATING STORM <br />ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES IN ANTICIPATION OF THE WEATHER. <br />5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPS SHALL BE STORED ON SITE AND SHALL <br />BE IMMEDIATELY AVAILABLE FOR USE. SUCH SUPPLIES AND MATERIALS SHALL INCLUDE, BUT NOT BE LIMITED <br />TO, STRAW BALES OR OTHER MULCHING MATERIAL, SILT FENCING AND STAKES, FILTER FABRIC, ETC. <br />6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, CONTRACTOR SHALL MONITOR ALL EROSION <br />CONTROL MEASURES AND SHALL PRIORITIZE IMPLEMENTATION AND MAINTENANCE OF EROSION AND SILTATION <br />CONTROL MEASURES ABOVE ALL OTHERS. <br />