Laserfiche WebLink
SW 1/4, NE 1/4, SEC. 23, T.28 N., R.4 E., W.M. <br />CITY OFEVERETT, WASHINGTON <br />/ <br />sue\ / FENCE 0.1 '(E) \ <br />- AT CORNER \ <br />�- � <br />551-- <br />\ <br />1.2\ \ \ 0.6 / \ <br />r <br />�°�•F�. \\ j LOT 1 / \\ <br />FOUND REBAR, NO CAP 1 - REIW4IN <br />1.1'(S) & 0.6'(W) of 1 _ (ro ) / LOT <br />CORNER. FENCE 0.2'(N) FOUND REBAR W/CAP STAMPED \\ <br />AT CORNER J + F��J� �/r4� :: 0 �l \ 28067 METRON AT CORNER. \ <br />END FENCE 0.2'(S) ) ( �h y�Pk,`/ HOUSE��i,,, 1V.E� \Y FENCE INT. 1.6 (N) & 1.0 (E) \ \ <br />OF PROPERTY LINE \ ! \ \ S�� _ (To OF CORNER \ <br />FOUND REBAR W CAP STAMPED \ \ •. , ..: U,'� (`r0 REMAIN) REMAIN) J �1, ) \ \ <br />"28067 METRON" AT CORNER. l / \ \� :,'.' 4 a /� �C�� 1.6 <br />(� (ro / <br />FENCE INT. 0.1 '(N) & 0.1 '(E) \ \ ` , \ / V \ \ CONCRETE l(U� / / I <br />OF CORNER ti9 • . • �\ \ ' (r0 REMAIN) \ REM�41N), <br />��� 9 5 • ' � `/ � � �j � \ A HALT \ �... •� � � LOT <br />�,\ <br />LOT 7 SNO. CO. <br />A. 2 SHORT PLAT <br />•. o I I v ":�o �� o N �`�o. SP 255(BB4) / <br />\ \ o pA �/� A t �� A.E.#B50540152 / <br />R��'0'� <br />Ile` \ / / ` / FOUND REBAR W CAP / <br />STAMPED "28067 / <br />�v L074 ' l A `� \ \ / / // , / V A METRON" / <br />GUESS U TY SEMENT \ <br />� \ \ \� L V F. 21 0 41 �LOT O A V v � - END WOOD FENCE 1. 9 (E) <br />/ \ � 91WA ,��1 j \ \ . OF PROPERTY LINE <br />\ 4/ / - / \ \ J 'X 1 / �" ��"" <> , F, / / �'�END WOOD FENCE <br />I / \ J0' R�5 < / \ /2.1 '(E) OF PROPERTY <br />p6 LINE <br />0 0 ~� < 5� FOUND REBAR WICAP <br />\ I l �sg��N Voh s <br />STAMPED "28067 <br />L O T 4 1 �,_ i \ //// V A o METRON" L O T 0 <br />END WALL 0.2' <br />OF PROPERTY LINE <br />� G <br />i <br />• <br />Know what's below. <br />Call before you dig. <br />UTILITY CONFLICT NOTE:- <br />LOT 5 <br />LOT 6 <br />BLOCK 3 <br />PLAT OF <br />RANCHO INTERCITY <br />VOL. 12, PC. 46 <br />FOUND CASED CONC. MON. <br />W/2" BRASS DISK & PUNCH. <br />DOWN 0.6'. VISITED 7-16-21 <br />Uf m/m=54d.3y \ / <br />IE 12" CPP(N=545.99 <br />IE 12" CPP(Ej=545.99 / <br />/EX. A � 50 <br />CB RIM=548.54 F_N_ � Z / <br />� CA\ / ' 6'' / ` / / <' \ > IE 12" CPP(W)=545.44 <br />i IE 12" CPP(S)=545.54 <br />PROPOSED­-\�, � / �\ / � <br />WALL s� � � ems. � � / le/ / V � . / FOUND REBAR W/CAP 5/ <br />STAMPED "28067 <br />�o \ \ \ � / / \� METRON" OFFSET 4.0'(NW) <br />\ o \ / 1 / \ NON PROPERTY LINE / O I / <br />LOT •3 / A o�- A // // \ \ \., v / �� �xpp / S �� 00552300400604 <br />�V A � V / / \ V 1 � / <br />/ I� '�� �� \\ L LOT 1 \ �� �� \ / SS RIM=5 .87 <br />\ \ \ \ \ r <br />L 0 T 7 / \ /IE 12" PVC(E)=536.92 <br />\ / 1 � �% // / i / c�0 IE 12" PVC(W)=536.82 <br />et C)�rSNOCO. LA <br />o ' ' / �. L / �f i _ <br />SHORT PLAT \ � �,_ � _` R _ - � -`I � / \ \ / CB RIM-547.32 <br />A. E #9B010B5002 \ j� J r 4'_ \ / / \ " _ <br />�` \\ IE 12 DI(W =544.42 <br />IE 12" DI(E)=544.52 <br />\ w \1000, <br />� \ - 43- / �, \ _ _ / ,�� CB RIM=545.97 \ <br />i \ �\ \ IE 12 CPP N 542.97 <br />1 / `\ IN. - - IE 12" DI(S)=543.07 \\ <br />END WALL 1.0'(E) \ Oleo / / \ / , / CB RIM=545.99 <br />i 10,OF PROPERTY LINE \ \ / 1 _ / �F �O �1 `\ / IE 12 DIN=543.29 <br />IE 12" DI(E)=543.39 <br />\ \ \ J �' B RIM=546.53 <br />END WALL 1.O'(E) \ \ \ , \ �� IE 1,2" CPP(W)=542.33 00552300400702 <br />OF PROPERTY LINE \ \ LOT 2 "� �� IE 12`l CPP(E)=542.43 <br />IE 12" �RP(S)=542.33 <br />6 <br />'� \ �5' l'a►�� _,� _ / EX.WM (IBR)3.8 <br />\ \ <br />co_ �� 0 A \ <br />/ ,.fi / ���x FOUND REBAR W/CAP STAMPED \ <br />LOT 2 �, \ , ` / I / "28067 METRON" AT CORNER \ <br />CB RIM=543.49 00552300400800 <br />c <br />IE 12- CPP(W)=538.59 <br />4.3' TEMP. D REBAR /C / IE 12 CPP(E)=538.89 <br />i /CONSTRUCTION I / \ jr, 12" CPP S -538 69 <br />CAUTION.• <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, <br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE <br />PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL <br />AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE <br />CALLING UTILITY LOCATE ® 1-800-424-5555 POTHOLING ALL OF THE EXISTING <br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY <br />WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN <br />ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND <br />ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR <br />SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL <br />PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />i <br />„ ( ) <br />C �o ^ _STA ED AT 06�ERL <br />/ CB RIA1 542.93 <br />i 1.5'� '� LOT 1 cr_J / IE 12" CPP(N) =540.63 <br />/EX. SSMH RIM=541.21\ <br />TESC POND \ \ J . - �� /C '�o / 1 / IE 12.E PVC W =529.41 \ \ <br />LOT 1 \ \\ /� / .� o { • } IE 12 PVC(E)=529.51 \ <br />�� 1� p "`MMM"' \ - �EX. RAMP IE 8" PVC(S)=530.00 \ <br />DEDICATION Ole <br />/ �. \ <br />792 SF \ � s s ��CB RIM=541.02 \ <br />\ IE 12 RCP(W)=537.92 \ <br />FOUND RE&_ � / � : � \ <br />„ IE 12 RCP(S)=538.02 � <br />STAMPED 10424 2.6 (N)� I CB RIM=540.52 <br />& 0.9'(E) OF CORNER EX.WM l c) <br />/ o IE 12" RCP(NW)=538.42 <br />/ (►BR) y \ "so IE 8" RCP(SW)=538.82 <br />CB RIM=540.27 <br />EX. RAMP \\ IE 8" RCP(NE)=538.77 <br />IX'FH 00552200400900 <br />/ (TO BE RELOWED TO <br />S BACK OF SIDEWALK) <br />�1 \ CB RIM=5- <br />�� IE 12 CPP(N)=536.04 <br />oe <br />CB RIM=539.53 <br />IE 12" CPP(W)=534.73 <br />CB RIM=534.86 1 i\ / IE 12" CPP E=534.83 <br />IE 12- RCP(NE)=531.16 IE 12" CPP(S)=534.73 <br />IE 12 RCP(SE)=531.16�Q \ / CB RIM=538.01 <br />IE 12" RCP(SW)=531.16 pR � \ IE 12 RCP NE=535.61 00552300401000 <br />/SSMH RIM=537.67 \\ IE 12" RCP(SW)=535.61 <br />/ <br />IE 8 PVC NE=526.52 \\ <br />pp / IE 8" PVC(SE)=526.52 <br />CB RIM=534.39 �,pk� , / IE 8" PVC(SW)=426.42 \\ <br />IE 12" CPP(NW)=531.79 \ <br />z � \ <br />/ 00552300401101 \ <br />CB RIM=535.13 \ <br />/ \ IE 12" RCP(NE)=532.43 \ <br />� IE 12" RCP(SE)=532.43 \ <br />\� IE 12" RCP(SW)=532.43 \ <br />\ 1 <br />00552300400603 <br />SCALE: I " = 30' <br />30 60 0 30 60 <br />THE 13 ELEMENTS OF SWPPP BMP <br />ELEMENT 11 - MARK CLEARING LIMITS: <br />LIMIT OF CONSTRUCTION ARE CLEARLY MARKED. <br />ELEMENT 12 - ESTABLISH CONSTRUCTION ACCESS: <br />A STABILIZED CONSTRUCTION ENTRANCE IS SHOWN. <br />ELEMENT #3 - CONTROL FLOW RATES: <br />A SEDIMENT POND IS PROPOSED. <br />ELEMENT 14 - INSTALL SEDIMENT CONTROLS. <br />SILT FENCE, INLET PROTECTION, MULCH, INTERCEPTOR SWALES AND <br />SEDIMENT POND ARE PROPOSED. <br />ELEMENT 15 - STABILIZE SOILS: <br />SOIL STABILIZATION IS ACHIEVED BY MULCHING, PLASTIC COVERING AND <br />SEEDS. <br />ELEMENT 16 - PROTECT SLOPES: <br />SLOPES ARE PROTECTED BY PLASTIC COVERING, MULCHING AND SEEDS. <br />ELEMENT 17- PROTECT DRAIN INLETS. <br />INLET PROTECTIONS ARE PROPOSED FOR THE STORM DRAINS. <br />ELEMENT18 - STABILIZE CHANNELS AND OUTLETS: <br />OUTLET PROTECTIONS ARE PROPOSED. <br />ELEMENT 19 - CONTROL POLLUTANTS. <br />ALL VEHICLES, EQUIPMENT AND PETROLEUM PRODUCT <br />STORAGE/DISPERSING AREAS WILL BE INSPECTED REGULARLY TO <br />DETECT ANY LEAKS OF SPILLS, AND TO IDENTIFY MAINTENANCE NEEDS <br />AND PREVENT LEAKS OF SPILLS. <br />ELEMENT 110 - CONTROL DEWATERING: <br />THERE WILL BE NO DEWATERING AS PART OF THIS CONSTRUCTION <br />PROJECT. <br />ELEMENT # 11- MAINTAIN BMP's: <br />ALL TEST BMPs SHALL BE MAINTAINED AND REPAIRED AS NEEDED. <br />ELEMENT 112 - MANAGE THE PROJECT. <br />THIS COULD BE ACHIEVED BY MINIMIZING THE EXTENT AND DURATION <br />OF THE AREA EXPOSED AND BY EMPHASIZING EROSION CONTROL THEN <br />SEDIMENT CONTROL. <br />ELEMENT # 13 - PROTECT ON -SITE STORMWATER MANAGEMENT BMP'S <br />FOR RUNOFF FROM ROOFS AND OTHER HARD SURFACES: N/A <br />1. CESCL CONTACT INFORMATION MUST BE SUBMITTED TO <br />CITY INSPECTOR PRIOR TO ANY WORK. <br />2. CITY STREETS ARE TO BE KEPT CLEAN OF DIRT AND <br />DEBRIS AT ALL TIMES DURING CONSTRUCTION. DUST <br />SUPPRESSION AND STREET CLEANING MUST OCCUR AS <br />DIRECTED BY PUBLIC WORKS INSPECTOR. <br />J. ALL EXPOSED GROUND MUST BE RESEEDED WITHIN 30 <br />DAYS OF COMPLETION OF CONSTRUCTION. IF RESEEDING <br />IS NOT PRATICAL DUE TO WEATHER OR SEASONAL <br />PROBLEMS, THE GROUND MUST BE COVERED WITH MULCH <br />AS DIRECTED BY THE CITY ENGINEER. <br />4. TEMPORARY EROSION CONTROL MEASURES FOR <br />CONSTRUCTION ACTIVITY MUST BE OPERATIONAL PRIOR TO <br />COMMENCEMENT OF ANY CLEARING OR EARTHWORK. <br />5. ALL ACCESS ROADS AND DRIVEWAYS SHALL HAVE A <br />MAXIMUM GRADE OF 15% TO MEET TRAFFIC STANDARDS. <br />SEDIMENT POND <br />INFLOW (10 YR/24 HR) <br />0.45 cfs <br />SURFACE REQ'D <br />938 SF <br />POND TOP ELEV <br />EL=458 <br />POND BOTTOM ELEV <br />EL=454.5 <br />EMERGENCY OVERFLOW <br />SPILLWAY ELEV= <br />EL=457 (L=6') <br />SURFACE AREA PROVIDED <br />975 SF <br />CONSTRUCTIONSEQUEYCE <br />1. PRIOR TO CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL <br />SCHEDULE AND ATTEND PRE -CONSTRUCTION CONFERENCE WITH THE <br />CITY OF EVERETT INSPECTION UNIT AND EROSION CONTROL SPECIALIST. <br />2. FLAG CLEARING LIMITS AND INSTALL SILT FENCE AS SHOWN. <br />3. INSTALL ROCK CONSTRUCTION ENTRANCE. <br />4. CLEAR AND GRUB ROAD AREAS, AND STOCKPILE AREAS. CONSTRUCT <br />SEDIMENT POND INSTALL TEMPORARY EROSION CONTROL BMP's SUCH <br />AS INTERCEPTOR TRENCHES, CHECK DAMS, ETC. AND DIRECT RUNOFF <br />TO THE SEDIMENT POND. <br />5. GRADE AND STABILIZE ROAD WITH GRAVEL BASE. COVER EXPOSED <br />SOILS WITH MULCH, HOG FUEL OR HYDROSEED. <br />6. CONSTRUCT WATER AND STORM UTILITIES. INSTALL GAS, POWER, <br />TELEPHONE AND CABLE UTILITIES, AS REQUIRED. <br />7. PLACE AND POUR CURBS AND GUTTERS. <br />8. PAVE ROADS WITH ATB AND PLACE DETENTION SYSTEM INTO FULL <br />OPERATION. <br />9. HYDROSEED REMAINING EXPOSED SOILS AND STABILIZE PROJECT. <br />10. FLUSH STORM DRAINAGE SYSTEM AND REMOVED SEDIMENTATION IN <br />ALL CATCH BASINS AND THE VAULT. <br />11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED <br />WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR <br />AFTER THE TEMPORARY BMP's ARE NO LONGER NEEDED. TRAPPED <br />SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED <br />SOIL AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY <br />STABILIZED. <br />