TESC & GRADING NOTES
<br />ATTACH IN A MANNER THAT
<br />ASSURES FABRIC IS FIRMLY
<br />HELD BYTHE BACKUP
<br />SUPPORT IN A WAY THAT
<br />REDUCES THE POTENTIAL
<br />FOR FABRIC TEARING
<br />BACKUP SUPPORT
<br />BACKFILLED &
<br />COMPACTED j
<br />NATIVE SOIL GI
<br />F�
<br />Ow
<br />BURY GEOTEXTILE
<br />IN TRENCH
<br />TYPI
<br />POST SEE WSDOT STANDARD
<br />SPECIFICATIONS 8-01.3(9)A
<br />FASTEN GEOTEXTILE TO
<br />POST EVERY 6" IN O.C.
<br />o?
<br />`V SELF-LOCKING TIE-NYLONE
<br />6/6 (MIN GRADE)
<br />120#MIN TENSILE STRENGTH,
<br />UV STABILIZED
<br />v I S
<br />o z GEOTEXTILE FOR SILT FENCE F2
<br />N SEE STANDARD SPECIFICATION OJT
<br />SECTION 9-33.2 (1), TABLE 6 d
<br />l
<br />CAL INSTALLATION DETAIL
<br />i / Quo
<br />/
<br />/ IQ
<br />INSTALL BACKUP SUPPORT FOR /
<br />/
<br />THE GEOTEXTILE SEE STANDARD /
<br />/
<br />SPECIFICATION SECTION 8.01.3(9)A
<br />/
<br />��
<br />P��P SPLIC
<br />TO PR
<br />kl 11
<br />/ Q
<br />j/ 19
<br />/ TYPICAL SILT FENCE
<br />/ W WITH BACKUP SUPPORT
<br />/�o�����° ISOMETRIC
<br />W Q
<br />'10`
<br />/
<br />� �
<br />LENGTH AS REQUIRED 100'
<br />MAY BE REDUCED TO 50' MI
<br />SITES WITH LESS THAN ONE
<br />OF EXPOSED SOIL OR APPRO
<br />PLACE CONSTRUCTION GEOI
<br />STABILIZATION FROM THE El
<br />ROADWAY TO THE CONSTRL
<br />nD AC nIDCrTCn DV TUC CNIC
<br />•
<br />Know what's below.
<br />Call before you dig.
<br />UTILITY CONFLICT NOTE.•
<br />CAUTION.-
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION,
<br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE
<br />PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL
<br />AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE
<br />CALLING UTILITY LOCATE ® 1-800-424-5555 POTHOLING ALL OF THE EXISTING
<br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY
<br />WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN
<br />ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND
<br />ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR
<br />SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL
<br />PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.
<br />1 TEMPORARY SILT FENCE
<br />CZ. Z N. T. S. (STD. DWG. 214)
<br />ISOMETRIC VIEW
<br />CONSTRUCTION ENTRANCE
<br />r3_*_ CONSTRUCTION ACCESS
<br />CZ. Z N. T. S. (STD. DWG. 20 1)
<br />GENERAL NOTES
<br />NOTES
<br />1. INSTALL THE ENDS OF THE SILT FENCE TO POINT
<br />SLIGHTLY UPSLOPE TO PREVENT SEDIMENT FROM
<br />FLOWING AROUND THE ENDS OF THE FENCE.
<br />2. PERFORM MAINTENANCE IN ACCORDANCE WITH
<br />WSDOT STANDARD SPECIFICATIONS 8-01.3(9)A
<br />AND 8-01.3(15).
<br />3. SPLICES SHALL NEVER BE PLACED IN LOW SPOTS
<br />OR SUMP LOCATIONS. IF SPLICES ARE LOCATED IN
<br />LOW OR SUMP AREAS, THE FENCE MAY NEED TO
<br />BE REINSTALLED UNLESS OTHERWISE APPROVED.
<br />4. INSTALL SILT FENCING PARALLEL TO MAPPED
<br />CONTOUR LINES.
<br />5. DURING EXCAVATION, MINIMIZE DISTURBING
<br />THE GROUND AROUND TRENCH AS MUCH AS IS
<br />FEASIBLE, AND SMOOTH SURFACE FOLLOWING
<br />EXCAVATION TO AVOID CONCENTRATING FLOWS.
<br />COMPACTION MUST BE ADEQUATE TO PREVENT
<br />UNDERCUTTING FLOWS.
<br />STEELPO�
<br />(TYPICAL)
<br />FABRIC
<br />(GEOTEXT
<br />(TYPICAL)
<br />BACKUP SUPPORT
<br />(TYPICAL)
<br />ED FENCE SECTIONS SHALL BECLOSEENOUGH TOGETHER
<br />EVENT SILT LADEN WATER FROM ESCAPING THROUGH THE
<br />FENCE AT THE OVERLAP.
<br />cni ir-r nr-rnii
<br />WSDOT STD PLAN 1-30.10-02 ACCEPTABLE SUBSTITUTE
<br />EXCEPT STEEL POST REQUIRED
<br />4:CITY OF EVERETT
<br />7T PUBLIC WORKS DEPARTMENT
<br />City Engineer Secion Manager CADManager Drawn By Curren[Rev Date
<br />RYAN SASS HEATHER GRIFFIN PAUL WILHELM ESH 03/17/2017
<br />TIRE
<br />STANDARD DRAWING No,
<br />TEMPORARY SILT FENCE 214
<br />NOTES
<br />1. STABILIZED CONSTRUCTION ENTRANCE SHALL
<br />MEETTHE REQUIREMENTS OF WSDOT STANDARD
<br />SPECIFICATION SECTION 8-01.3(7).
<br />INSTALL DRIVEWAY CULVERT
<br />IF THERE IS A ROADSIDE DITCH
<br />PRESENT
<br />30' MIN TYPICAL
<br />PERMEABLE BALLAST TYPICAL SEE
<br />STANDARD SPECIFICATION
<br />SECTION 9-03.9(2)
<br />PROVIDE FULL WIDTH OF
<br />INGRESS/EGRESS AREA
<br />15' MIN
<br />WSDOT STD PLAN 1-80.10-02 ACCEPTABLE SUBSTITUTE
<br />4CITY OF EVERETT
<br />--7T PUBLIC WORKS DEPARTMENT
<br />City Engineer Section Manager CADManager Drawn By Current Rev Date
<br />RYAN SASS HEATHER GRIFFIN PAUL WILHELM ESH 04/03/2017
<br />TIRE
<br />STANDARD DRAWING N,.
<br />CONSTRUCTION ACCESS 20
<br />1
<br />SW 1/4, NE 1/4, SEC. 23, T.28 N, R.4 E, W.M.
<br />CITY OFEVERETT, WASHINGTON
<br />URHIINHl7C
<br />GRATE FRP
<br />SEDIMENT
<br />AND DEBR
<br />DRAII
<br />BELO
<br />DEVI(
<br />5" MAX
<br />crr-T1nn1 X/Ir_IA1
<br />ISOMETRIC VIEW
<br />OPTION: STOCKPILE EXISTING TOPSOIL
<br />STOCKPILE EXISTING TOPSOIL DURING GRADING. STOCKPILE AND COVER SOIL
<br />WITH WEED BARRIER MATERIAL THAT SHEDS MOISTURE YETALLOWS AIR
<br />TRANSMISSION, IN APPROVED LOCATION, PRIOR TO GRADING. REPLACE
<br />STOCKPILED TOPSOIL PRIOR TO PLANTING. STOCKPILED TOPSOIL SHALL BE
<br />TESTED AND AMENDED IF NEEDED TO MEET THE ORGANIC MATTER OR
<br />DEPTH REQUIREMENTS EITHER AT PREAPPROVED RATE OR CALCULATED
<br />RATE. ALL SOIL AREAS DISTURBED OR COMPACTED DURING CONSTRUCTION,
<br />AND NOT COVERED BY BUILDINGS OR PAVEMENT, SHALL BE AMENDED WITH
<br />COMPOST AS DESCRIBED BELOW.
<br />1. SCARIFICATION: IF PLACED TOPSOIL PLUS COMPOST OR OTHER
<br />ORGANIC MATERIAL WILLAMOUNTTO LESSTHAN 12 INCHES, SCARIFY
<br />OR TILL SUBGRADE TO DEPTH NEEDED TO ACHIEVE 12 INCHES OF
<br />LOOSENED SOIL AFTER TOPSOIL AND AMENDMENT ARE PLACED.
<br />ENTIRE SURFACE SHOULD BE DISTURBED BY SCARIFICATION. DO NOT
<br />SCARIFY WITHIN DRIP LINE OF EXITING TREES TO BE RETAINED.
<br />2. SETBACKS: TO PREVENT UNEVEN SETTLING, DO NOT
<br />COMPOST -AMEND SOILS WITHIN 3 FEET ON CENTER OF UTILITY
<br />INFRASTRUCTURE (POLES, VAULTS, METERS ETC.). WITHIN ONE FOOT
<br />OF PAVEMENT EDGE, CURBS AND SIDEWALKS; SOIL SHOULD BE
<br />COMPACTED TO APPROXIMATELY 90% MAX. MODIFIED PROCTOR
<br />DENSITY (ASTM D1557) TO ENSURE A FIRM SURFACE. DO NOT
<br />COMPACT WITHIN TREE PROTECTION ZONE.
<br />OPTION: AMEND EXISTING TOPSOIL
<br />AMEND EXISTING SITE TOPSOIL, OR SUBSOIL, EITHER AT PREAPPROVED RATE
<br />OR AT CALCULATED RATE BASED ON TESTS OF THE SOIL AND AMENDMENTS.
<br />ALL SOIL AREAS DISTURBED OR COMPACTED DURING CONSTRUCTION AND
<br />NOT COVERED BY BUILDINGS OR PAVEMENT, SHALL BE AMENDED WITH
<br />COMPOST AS DESCRIBED BELOW.
<br />1. SCARIFICATION: SCARIFY OR TILL SUBGRADE TO 8 INCHES DEPTH (OR
<br />TO DEPTH NEEDED TO ACHIEVE A TOTAL DEPTH OF 12 INCHES OF
<br />UNCOMPACTED SOIL AFTER CALCULATED AMOUNT OF AMENDMENT IS
<br />ADDED). ENTIRE SURFACE SHOULD BE DISTURBED BY SCARIFICATION.
<br />DO NOT SCARIFY WITHIN DRIP LINE OF EXISTING TREES TO BE RETAINED
<br />OR WHERE SCARIFICATION WOULD DAMAGE TREE ROOTS OR AS
<br />DETERMINED BY THE ENGINEER.
<br />2. SETBACKS: TO PREVENT UNEVEN SETTLING, DO NOT COMPOST -AMEND
<br />SOILS WITHIN 3 FEET ON CENTER OF UTILITY INFRASTRUCTURE (POLES,
<br />VAULTS, METERS ETC.). WITHIN ONE FOOT OF PAVEMENT EDGE,
<br />CURBS AND SIDEWALKS; SOIL SHOULD BE COMPACTED TO
<br />APPROXIMATELY 90% MAX. MODIFIED PROCTOR DENSITY (ASTM
<br />D1557) TO ENSURE A FIRM SURFACE. DO NOT COMPACT WITHIN TREE
<br />PROTECTION ZONE.
<br />1. FOR ANY EASEMENT ACCESS OR EASEMENT WITH PUBLIC UTILITIES, THE CITY ENGINEER SHALL DETERMINE
<br />THE REQUIRED EASEMENT WIDTH BASED ON CITY STANDARDS.
<br />2. WITH THE EXCEPTION OF THE EASEMENT ACCESS DRIVE, NO NEW DRIVEWAYS OR PARKING AREAS WILL BE
<br />PERMITTED WITHIN THE FRONT YARD SETBACK AREA FOR ALL LOTS THAT FRONT ON THE PUBLIC STREET.
<br />3. ACCESS OFF AN EASEMENT DRIVE IS LIMITED TO ONE TWENTY FOOT DRIVEWAY AND CURB CUT PER LOT.
<br />THE DRIVEWAY SHALL NOT EXCEED TWENTY FEET IN WIDTH FOR A DISTANCE OF TWENTY FEET FROM THE
<br />EASEMENT ACCESS DRIVE CURB. THE MINIMUM PARKING STALL WIDTH FOR TWO CARS IN FRONT OF THE
<br />GARAGE IS 20 FEET BY 20 FEET - TWO (2) STALLS. THE MINIMUM PARKING PAD FOR 4 OFF-STREET IS
<br />20 FEET BY 40 FEET.
<br />4. SURFACE PARKING: EMC 18.28.120 SURFACE PARKING IS ONLY PERMITTED ON A LOT WITH AN EXISTING
<br />HOUSE. THE PARKING AREA MAY NOT BE BETWEEN THE EXISTING HOUSE AND THE PUBLIC STREET. THE
<br />PARKING PAD MUST BE A MINIMUM OF 20 FEET BY 40 FEET AND BE A MINIMUM OF 5 FEET AWAY FROM
<br />ANY NEW PROPERTY LINE AND MAY NOT BE WITHIN THE REQUIRED OPEN SPACE.
<br />5. GARAGES: ENC 18.28.150 ON ALL NEW LOTS WHERE PROPOSED SINGLE FAMILY DWELLINGS ARE PROPOSED A
<br />TWO (2) CAR GARAGE IS REQUIRED.
<br />6. EMC 18.28.120 ALL DEVELOPMENT STANDARDS FOR EASEMENT ACCESS DRIVE MUST BE MET.
<br />EASEMENT AND UTILITY NOTES
<br />1. 5' MIN SEPARATION BETWEEN CITY OPERATED UTILITIES AND OTHER PRIVATE AND PUBLIC OPERATED UTILITIES
<br />(PUD, CABLE TV, PHONE, GAS ETC.)
<br />2. NON CITY OPERATED PUBLIC UTILITIES MAY CROSS CITY EXCLUSIVE EASEMENT ONLY BETWEEN 450 AND 900
<br />WITH RIDGED STEEL CONDUIT OR PVC CONDUIT ENCASED IN RED CONCRETE AT THE PUBLIC WORKS
<br />INSPECTORS OPTION.
<br />3. CONDUIT DUCTING SHALL HAVE A MINIMUM COVER OF 3' AND NOT OBSTRUCT CROSSING BY OTHER UTILITIES
<br />FOR A VERTICAL DISTANCE GREATER THAN 3' IN EITHER EASEMENT.
<br />4. ONLY CITY OPERATED UTILITIES SHALL BE ALLOWED WITHIN CITY EXCLUSIVE EASEMENT NO OTHER
<br />EASEMENTS MAY BE GRANTED WITHIN THE LIMITS OF THIS EASEMENT.
<br />)W BYPASS
<br />NLET GRATE
<br />WATER
<br />NOTES
<br />1. CATCH BASIN INSERTS SHALL BE REMOVED ATTHE
<br />END OF THE PROJECT.
<br />2. CATCH BASIN INSERTS ARE ONLYTO BE INSTALLED IN
<br />DRAINAGE DEVICES PER THE MANUFACTURES'S
<br />RECOMMENDATIONS. CATCH BASIN INLET INSERTS
<br />SHALL BE INSTALLED IN CURB INLETS.
<br />3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO
<br />CLEARING AND GRADING ACTIVITY, OR UPON
<br />PLACEMENT OF A NEW CATCH BASIN.
<br />4. SEDIMENT SHALL BE REMOVED FROM THE UNIT
<br />WHEN IT BECOMES ONE THIRD FULL OR IN
<br />ACCORDANCE WITH THE MANUFACTURES'
<br />INSTRUCTIONS.
<br />5. SEDIMENT REMOVAL SHALL BE ACCOMPLISHED BY
<br />REMOVING THE INLET INSERTS, EMPTYING, AND
<br />RE -INSTALLING IT INTO THE CATCH BASIN. DO NOT
<br />WASH SEDIMENT INTO STORM DRAINS WHILE
<br />CLEANING.
<br />6. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE
<br />STORM WATER STRUCTURE IT WILL SERVICE.
<br />7. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF
<br />SYSTEM (OVERFLOW BYPASS).
<br />8. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF
<br />THE BIGD WITHOUT SPILLING THE COLLECTED
<br />MATERIAL.
<br />9. PERFORM MAINTENANCE IN ACCORDANCE WITH
<br />STANDARD SPECIFICATION 8-01.3(15).
<br />WSDOT STD PLAN 1-40.20-00 ACCEPTABLE SUBSTITUTE IF
<br />MAINTENANCE MEETS NOTES 1-5
<br />iS
<br />CITY OF EVERETT
<br />PUBLIC WORKS DEPARTMENT
<br />City Engineer Secion Manager CADManager Drawn ey Current Rev Date
<br />RYAN SASS HEATHER GRIFFIN PAUL WILHELM ESH 12/30/2016
<br />THE
<br />STORM DRAIN INLET STANDARD DRAWING No.
<br />PROTECTION 210
<br />2 STORM DRAIN INLET PROTECTION
<br />CZ. Z N. T. S. (STD. DWG. 210)
<br />T'4' (SETTLED) ARBORIST
<br />WOOD CHIP MULCH
<br />3" OF COMPOST
<br />INCORPORATED INTO
<br />5" OF SITE SOIL (TOTAL
<br />AMENDED DEPTH OF
<br />9.5", FOR A SETTLED
<br />DEPTH OF 8")
<br />SUBSOIL SCARIFIED 4"
<br />BELOW COMPOST
<br />AMENDED LAYER (12"
<br />BELOW SOIL SURFACE)
<br />1. PREAPPROVED RATE: PLACE 3 INCHES OF
<br />COMPOSTED MATERIAL AND ROTOTILL INTO 5
<br />INCHES OF EXISTING SITE SOILS (A TOTAL
<br />AMENDED DEPTH OF ABOUT 9.5 INCHES, FOR A
<br />SETTLED DEPTH OF 8 INCHES).
<br />2. CALCULATED RATE: PLACE CALCULATED
<br />AMOUNT OF COMPOSTED MATERIAL OR
<br />APPROVED ORGANIC MATERIAL AND ROTOTILL
<br />INTO DEPTH OF SOIL NEEDED TO ACHIEVE 8
<br />INCHES OF SETTLED SOIL AT 10% ORGANIC
<br />CONTENT.
<br />3. RAKE BEDS TO SMOOTH AND REMOVE SURFACE
<br />ROCKS LARGER THAN 2 INCHES DIAMETER.
<br />MULCH PLANTING BEDS WITH T'4' OF ORGANIC
<br />MULCH OR STOCKPILED DUFF.
<br />0"
<br />8"
<br />12"
<br />GRASS SEED OR SOD
<br />1.75" OF COMPOST
<br />INCORPORATED INTO
<br />6.25" OF SITE SOIL
<br />(TOTAL AMENDED
<br />DEPTH OF 9.5", FOR A
<br />SETTLED DEPTH OF 8")
<br />SUBSOIL SCARIFIED 4"
<br />BELOW COMPOST
<br />AMENDED LAYER (12"
<br />BELOW SOIL SURFACE)
<br />TURF (LAWN) AREAS
<br />1. PREAPPROVED RATE: PLACE 1.75 INCHES OF
<br />COMPOSTED MATERIAL AND ROTOTILL INTO 6.25
<br />INCHES OF EXISTING SITE SOILS (A TOTAL
<br />AMENDED DEPTH OF ABOUT 9.5 INCHES, FOR A
<br />SETTLED DEPTH OF 8 INCHES).
<br />2. CALCULATED RATE: PLACE CALCULATED
<br />AMOUNT OF COMPOSTED MATERIAL OR
<br />APPROVED ORGANIC MATERIAL AND ROTOTILL
<br />INTO DEPTH OF SOIL NEEDED TO ACHIEVE 8
<br />INCHES OF SETTLED SOIL AT 5% ORGANIC
<br />CONTENT.
<br />3. WATER OR ROLL TO COMPACT TO 85% OF
<br />MAXIMUM DRY DENSITY. RAKE TO LEVEL AND
<br />REMOVE SURFACE ROCKS LARGER THAN 1 INCH
<br />DIAMETER.
<br />EVERETT PUBLIC WORKS
<br />WASHINGTON DEPARTMENT
<br />City Engineer Section Manager CADManager Drawn By Current Rev Date
<br />RYAN SASS HEATHER GRIFFIN PAUL WILHELM BED 01/04/2021
<br />TITLE
<br />STANDARD DRAWING No.
<br />POST- CONSTRUCTION SOIL
<br />QUALITY AND DEPTH 203
<br />POST- CONS TR UCTION SOIL QUALITY AND DEPTH
<br />N. T. S.
<br />CONTRACTOR RESPONSIBILITY FOR EROSION/SILTATION CONTROL
<br />IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL PLAN THAT STORM WATER RUNOFF BE
<br />CONTROLLED AT ALL TIMES TO PREVENT SOIL EROSION AND TO MAINTAIN WATER QUALITY. ANY AND ALL
<br />MEASURES NECESSARY TO DO SO SHALL BE EMPLOYED BY THE CONTRACTOR.
<br />1. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDITIONS, THE CONTRACTOR SHALL BE FULLY
<br />RESPONSIBLE FOR ENSURING THAT EROSION DOES NOT OCCUR ON THE SITE AND THAT POLLUTED OR
<br />SILT -LADEN RUNOFF DOES NOT LEAVE THE SITE OR ENTER INTO ANY CREEK, STREAM, WETLAND OR
<br />WATER BODY ON THE SITE.
<br />2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE CONTRACTOR SHALL BE RESPONSIBLE
<br />FOR SELECTING AND IMPLEMENTING APPROPRIATE METHODS, "BEST MANAGEMENT PRACTICES" (BMPS), FOR
<br />STORM WATER TREATMENT AND CONTROL THAT MEET THE REQUIREMENTS OF BOTH THE WASHINGTON STATE
<br />DEPARTMENT OF ECOLOGY AND THE CITY OF EVERETT
<br />3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES TO THE PROJECT ENGINEER
<br />AND THE CITY INSPECTOR. IN THE EVENT THAT THE INSTALLED WATER QUALITY CONTROL MEASURES ARE
<br />INEFFECTIVE AT CONTROLLING EROSION AND SILTATION, THE CONTRACTOR SHALL IMMEDIATELY REPORT TO
<br />AND CONSULT WITH THE PROJECT ENGINEER TO FIND AN APPROPRIATE REMEDY. ALL CONSTRUCTION
<br />ACTIVITIES, WITH THE EXCEPTION OF EROSION AND SILTATION CONTROL MEASURES, SHALL CEASE UNTIL
<br />SUCH TIME AS THE WATER QUALITY IS BROUGHT UNDER CONTROL.
<br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS AND ANTICIPATING STORM
<br />ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES IN ANTICIPATION OF THE WEATHER.
<br />5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPS SHALL BE STORED ON SITE AND SHALL
<br />BE IMMEDIATELY AVAILABLE FOR USE. SUCH SUPPLIES AND MATERIALS SHALL INCLUDE, BUT NOT BE LIMITED
<br />TO, STRAW BALES OR OTHER MULCHING MATERIAL, SILT FENCING AND STAKES, FILTER FABRIC, ETC.
<br />6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, CONTRACTOR SHALL MONITOR ALL EROSION
<br />CONTROL MEASURES AND SHALL PRIORITIZE IMPLEMENTATION AND MAINTENANCE OF EROSION AND SILTATION
<br />CONTROL MEASURES ABOVE ALL OTHERS.
<br />(STD. DWG. 203)
<br />NTnTp c
<br />1. CITY STREETS ARE TO BE KEPT CLEAN OF DIRT AND DEBRIS AT ALL TIMES DURING CONSTRUCTION. DUST
<br />SUPPRESSION AND STREET CLEANING MUST OCCUR AS DIRECTED BY PUBLIC WORKS INSPECTOR.
<br />2. ALL EXPOSED GROUND MUST BE RESEEDED WITHIN 30 DAYS OF COMPLETION OF CONSTRUCTION. IF
<br />RESEEDING IS NOT PRATICAL DUE TO WEATHER OR SEASONAL PROBLEMS, THE GROUND MUST BE COVERED
<br />WITH MULCH AS DIRECTED BY THE CITY ENGINEER.
<br />3. TEMPORARY EROSION CONTROL MEASURES FOR CONSTRUCTION ACTIVITY MUST BE OPERATIONAL PRIOR TO
<br />COMMENCEMENT OF ANY CLEARING OR EARTHWORK.
<br />4. ANY GRADING/FILL ON THIS SITE SHALL BE DONE IN A MANNER THAT DOES NOT IMPACT THE SURROUNDING
<br />PROPERTIES.
<br />EROSION CONTROL DEVICES NOTES
<br />ADDITIONAL EROSION AND SEDIMENT CONTROL MAY BE REQUIRED AS PER INSPECTORS DIRECTION DURING
<br />CONSTRUCTION.
<br />1. THE TEMPORARY EROSION CONTROL SYSTEM SHALL BE INSTALLED PRIOR TO ALL OTHER CONSTRUCTION.
<br />2. WHERE POSSIBLE, MAINTAIN NATURAL VEGETATION FOR SILT CONTROL.
<br />J. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE EROSION CONTROL FACILITIES SHALL BE MAINTAINED
<br />AND/OR ALTERED AS REQUIRED BY THE CITY ENGINEER TO ENSURE CONTINUING EROSION/SEDIMENTATION CONTROL.
<br />4. ALL DISTURBED AREAS THAT WILL BE LEFT FOR 30 DAYS OR MORE DURING THE PERIODS OF MARCH 1 TO MAY 15 AND AUGUST 15
<br />TO OCTOBER 1 SHALL BE IMMEDIATELY SEEDED WITH A MIX AND BY A METHOD APPROVED BY THE CITY OF EVERETT PUBLIC WORKS
<br />DEPARTMENT AND MAINTAINED UNTIL SEED GERMINATION IS ASSURED. IN ADDITION TO SEEDING, SLOPES OF 25% OR GREATER WILL
<br />BE MULCHED WITH 2.0 TONS OF STRAW PER ACRE, OR WITH AN APPROVED EQUAL.
<br />DURING THE REST OF THE YEAR, TEMPORARY SOIL STABILIZATION MUST BE APPLIED IMMEDIATELY TO DISTURBED AREAS THAT WILL BE
<br />LEFT EXPOSED FOR 7 DAYS OR MORE, AND IMMEDIATELY TO SLOPES GREATER THAN 25% WILL BE LEFT EXPOSED FOR 3 DAYS OR
<br />MORE.
<br />5. THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN. TRACKING OF MUD AND DEBRIS FROM THE SITE WILL NOT BE ALLOWED. FAILURE
<br />TO COMPLY WITH THIS CONDITION WILL RESULT IN ALL WORK ON THE SITE BEING STOPPED.
<br />6. GRADING OUTSIDE CITY RIGHT-OF-WAY SHALL CONFORM TO CHAPTER 70, UNIFORM BUILDING CODE.
<br />7. COMPACT ALL FILLS TO MINIMUM 95% MAXIMUM DENSITY.
<br />8. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO INSURE THAT SEDIMENT -LADEN
<br />WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. AS CONSTRUCTION PROGRESSES AND UNEXPECTED (SEASONAL) CONDITIONS
<br />DICTATE, MORE SILTATION CONTROL FACILITIES MAY BE REQUIRED TO INSURE COMPLETE SILTATION CONTROL OF THE PROPOSED
<br />PROJECT. THEREFORE, DURING THE COURSE OF CONSTRUCTION IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE
<br />CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES
<br />THAT MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES.
<br />9. SUITABLE NATIVE MATERIAL EXCAVATED DURING TRENCHING SHALL BE USED FOR TRENCH BACKFILL UNLESS NOTIFIED BY THE CITY
<br />ENGINEER THAT THE NATIVE MATERIAL IS UNSUITABLE. THE CITY ENGINEER, OR HIS REPRESENTATIVE, WILL EXAMINE EXCAVATED NATIVE
<br />MATERIAL AT THE TIME OF EXCAVATION TO DETERMINE ITS SUITABILITY FOR USE AS BACKFILL. NATIVE MATERIAL WILL BE CONSIDERED
<br />SUITABLE FOR TRENCH BACKFILL IF IT IS:
<br />A. CAPABLE OF ATTAINING THE DEGREE OF COMPACTION SPECIFIED IN D COMPACTION.
<br />B. WITHIN REASONABLE TOLERANCE OF OPTIMUM MOISTURE CONTENT.
<br />C. REASONABLY FREE OF ORGANIC MATERIAL, CLAY, FROZEN LUMPS, ROCKS OR OTHER DELETERIOUS MATTER.
<br />10. UNSUITABLE BACKFILL MATERIAL SHALL BE REMOVED FROM THE SITE AND HAULED TO AN APPROVED DISPOSAL SITE. THE CITY
<br />ENGINEER SHALL BE PROVIDED WITH THE LOCATION OF ALL DISPOSAL SITES TO BE USED AND ALSO COPIES OF THE PERMITS AND
<br />APPROVALS OF SUCH DISPOSAL SITES.
<br />11. IMPORTED MATERIAL SHALL MEET THE REQUIREMENT OF GRAVEL BORROW AS SPECIFIED IN SECTION 3.16.1.3 OF THE DESIGN AND
<br />CONSTRICTION STANDARDS AND SPECIFICATIONS, OR CRUSHED SURFACING TOP COURSE AS SPECIFIED IN SECTION 9-03.9(3) OF THE
<br />1991 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION.
<br />12. TRENCH BACKFILL SHALL BE SPREAD IN LAYERS AND COMPACTED BY MECHANICAL TAMPERS OF THE IMPACT TYPE APPROVED BY THE
<br />CITY ENGINEER. THE BACKFILL MATERIAL SHALL BE PLACED IN SUCCESSIVE LAYERS WITH THE FIRST LAYER NOT TO EXCEED 2 FEET
<br />ABOVE THE PIPE, AND THE FOLLOWING LAYERS NOT EXCEEDING 12 INCHES IN LOOSE THICKNESS, WITH EACH LAYER BEING
<br />COMPACTED TO THE DENSITY SPECIFIED BELOW.
<br />A. IMPROVED AREA SUCH AS STREET AND SIDE WALK AREAS SHALL BE COMPACTED TO 909 OF MAXIMUM DRY DENSITY TO WITHIN 3
<br />FEET OF SUBGRADE, THE LAST 3 FEET SHALL BE COMPACTED TO 959 OF MAXIMUM DRY DENSITY.
<br />B. UNIMPROVED AREAS OR LANDSCAPE AREAS SHALL BE COMPACTED TO 90% OF MAXIMUM DRY DENSITY.
<br />13. TEMPORARY SILTATION PONDS AND ALL TEMPORARY SILTATION CONTROLS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL
<br />SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETED, PERMANENT DRAINAGE FACILITIES ARE OPERATIONAL, AND THE
<br />POTENTIAL FOR EROSION HAS PASSED.
<br />14. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, SIZE, NOR LOCATION OF PIPES, RESTRICTORS, OR
<br />DETENTION FACILITIES; BUT IS AN APPROVAL OF GRADING AND SEDIMENTATION CONTROL PLAN ONLY.
<br />COE TES NOTES
<br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE
<br />DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES).
<br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC
<br />FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND
<br />VEGETATION/LANDSCAPING IS ESTABLISHED.
<br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION.
<br />DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL
<br />BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION.
<br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN
<br />SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR
<br />VIOLATE APPLICABLE WATER QUALITY STANDARDS.
<br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION
<br />PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND
<br />SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. 2022 DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS EROSION AND
<br />SEDIMENTATION CONTROL 2-6.
<br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED
<br />FUNCTIONING, ESPECIALLY AFTER STORM EVENTS.
<br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS
<br />FOLLOWING A MAJOR STORM EVENT.
<br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS
<br />AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO
<br />THE DOWNSTREAM SYSTEM.
<br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF
<br />THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE
<br />PROJECT.
<br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE
<br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL. IF
<br />BMPS FAIL AND SEDIMENT -LADEN WATER IS LEAVING THE SITE, IMMEDIATELY NOTIFY YOUR PUBLIC WORKS INSPECTOR.
<br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH
<br />APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30.
<br />13. NOTIFY THE CITY PUBLIC WORKS INSPECTOR AT LEAST 24 HOURS PRIOR TO DEWATERING ACTIVITIES. HANDLE HIGHLY TURBID OR OTHERWISE
<br />CONTAMINATED DEWATERING WATER SEPARATELY FROM STORMWATER.
<br />14. THE APPROVED PROJECT PUBLIC WORKS PERMIT AND SWPPP SHALL BE RETAINEDON SITE OR READILY AVAILABLE TO THE CONTRACTOR
<br />THROUGHOUT THE DURATION OF THE CONSTRUCTION PROJECT.
<br />15. DESIGN, INSTALL, IMPLEMENT, AND MAINTAIN EFFECTIVE POLLUTION PREVENTION MEASURES TO MINIMIZE THE DISCHARGE OF POLLUTANTS.
<br />16. PROTECT ALL LID BMPS FROM SEDIMENTATION THROUGH INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENT CONTROL BMPS ON
<br />PORTIONS OF THE SITE THAT DRAIN INTO THE LID BMPS.