Laserfiche WebLink
CONSTRUCTION NOTES AND DETAILS <br />Know what's below. <br />Call before you dig. <br />Akf -A if . <br />fA "ON <br />14" <br />11 1/2" <br />�i- NON -SLIP TREAD SURFACE <br />3 1/4" <br />I 1 <br />SIDE ELEVATION <br />1 <br />AU CS W. MW OA rf AW <br />SITYMM 50 Mr LFT 04 T & <br />USULE POUOf OROYM AV <br />azw <br />AU94I-a*W MUC *?r0# <br />AN FM SM VW 405 07 W. <br />AE4e@qm jr #6rAuA nm av ,or <br />RV AA KV AMA M Or ACT M IMMOW <br />P,F2 ASA CK <br />AESMACM A.YSWSYD OW <br />0211? & 412C <br />SAW AIR SW ow im <br />► AW '1264COMME? <br />AO' fW III%)Jlfi fw Or Ifd' AW SU l " <br />a4w STW MW &XsR€T <br />67" f ' RAV AW WUnIN MM FM <br />AND dDOW 9W <br />ALSHURS Ja Jr ?V tV JWf <br />All W Sr` xs 37M A6I BIQE 7S <br />AEUMPM WAXLE SMS <br />dw$W A_yrRx7W <br />QWAAr MW lr AMW OU <br />MA4*7fLMrP0* SW AUM AW <br />EXTRACTIO <br />SURFACE <br />MRAGn1c1nN FOR TREAD EXTENSION <br />_L (SEE NOTE 9) <br />.12* <br />* J <br />*}y� <br />/ } <br />OUMET a ELC . 49aO F <br />V. <br />4W 00 MWE = <br />,RfrV <br />491.60 dW71M J OTaf R <br />atV <br />492 10 70P A40ACHNCR <br />C C V. <br />4-92.10 TOMS OF MSER <br />&EV <br />If60 Lo <br />13" <br />PLAN <br />SECTION A -A <br />1/2" GRADE 60 <br />REINFORCING <br />STEEL BAR <br />FOR <br />FORMOST FUJI <br />A PORTION OF THE NW1/4, OF THE SW1/4 OF SEC. 12, <br />TWP. 28N., RGE 4E., W. M. <br />CITY OF EVERETT, SNOHOMISH COUNTY, WASHINGTON <br />RECORD DRAWING <br />No <br />AS -BUILT RECORD DRAWING PREPARED <br />BY HARMSEN LLC., <br />a <br />EVERETT, WASHINGTON ON 5/29/2024 <br />z <br />FIELD WORK COMPLETED 4/25/24 <br />�� <br />AND RECORDED INFIELD BOOK # 1303' <br />ITEMS NOT MARKED ARE UNCHANGED OR <br />� 22019143 � <br />�f1srE. <br />COULD NOT BE VERIFIED IN THE <br />L LA�� <br />AS -BUILT SURVEY. <br />By: Project Engineer/Surveyor l Date 5/29/2024 <br />CONTRACTOR SHALL INCREASE DIAMETER OF <br />BOTTOM ORIFICE OF EXISTING STRUCTURE CB 12 <br />FROM 2.2471 " TO 2.375"� <br />NOTES <br />1. STEPS SHALL BE STEEL REINFORCED COPOLYMER <br />POLYPROPYLENE PLASTIC CONFORMING TO: <br />A. ASTM D 478 AND AASHTO M-199, MINIMUM <br />HORIZONTAL PULLOUT RATING SHALL BE 1500 <br />NON -SLIP LBS. <br />PATTERN B. ASTM A 615 GRADE 60 (DEFORMED <br />REINFORCING STEEL BAR). <br />2. ONLY STEPS APPROVED BY THE ENGINEER SHALL BE <br />USED. <br />3. ALL FABRICATION DIMENSIONS INDICATED ARE <br />MINIMUM. <br />4. THE MINIMUM TOTAL CROSS -SECTIONAL AREA OF <br />THE EXPOSED PORTION OF THE STEP, INCLUDING <br />THE 1/2-INCH DEFORMED REINFORCING STEEL BAR, <br />AND EXCLUDING THE NON -SLIP TREAD SURFACE, <br />SHALL BE ONE SQUARE INCH <br />5. THE ENTIRE POLYPROPYLENE PLASTIC MATERIAL <br />SURROUNDING THE REINFORCING STEEL BAR SHALL <br />BE CAST MONOLITHICALLY. MINIMUM COVER SHALL <br />BE 3/16-INCH. <br />6. THE FOLLOWING DIMENSIONS SHALL APPLY UNLESS <br />OTHERWISE NOTED ON THE DRAWINGS OR <br />STANDARD PLANS FOR SPECIFIC STRUCTURES: D=6" <br />+1/4" E=3 1/4" +1/4" <br />7. STEP RUNGS SHALL BE SPACED AT A MAXIMUM OF <br />14-INCHES. <br />8. STEPS SHALL BE INSTALLED IN ACCORDANCE WITH <br />THE APPROVED MANUFACTURERS RECOMMENDED <br />PROCEDURE. <br />9. STEPS IN THE CONE AND RISER SECTIONS WILL HAVE o <br />6" EXTENSION FROM WALL. STEPS INSTALLED ABOVE <br />CONE OR TOP SLAB SHALL BE A MAX OF 3" <br />EXTENSION FROM WALL AND USED AS HANDHOLD. <br />ALSO SEE 605A, 605E OR 605C. <br />w <br />0 <br />> <br />0 <br />0 <br />EVERETT PUBLIC WORKS <br />WASHINGTON DEPARTMENT z <br />Oty 1I,R er Section Manager CAD Manager awn By urr v O Q <br />TITLB RYAN SASS DAVID VOIGT PAUL WILHELM ESH 12/30/2016 0 0 <br />ALTERNATE POLYPROPYLENE STANDARDo W" <br />PLASTIC STEPS 609 Ea\ <br />TYPE A-1 CURB <br />& GUTTER <br />SEE STANDARD <br />DRAWING 307 <br />SOLID BRICKS 0 <br />RECTANGULAR <br />AhII IfTNAENIT f <br />- EXISTING <br />PAVEMENT <br />6" <br />MATERIALS <br />PIPE BEDDING MATERIAL SHALL BE <br />CRUSHED SURFACING BASE COURSE <br />CONFORMING TO SECTION 9-03.9(3) I <br />OF THE STANDARD SPECIFICATIONS <br />FOR ROAD, BRIDGE AND MUNICIPAL -� <br />CONSTRUCTION WSDOT/APWA. <br />OVER EXCAVATION AND PLACEMENT OF FOUNDATION MATERIAL, IF <br />REQUIRED SHALL BE FOUNDATION I_ -I <br />MATERIAL CLASS A OR B <br />CONFORMING TO SECTION 9-03.17 <br />OF THE STANDARD SPECIFICATIONS N/ (SEE NOTE1) <br />FOR ROAD, BRIDGE AND MUNICIPAL <br />CONSTRUCTION WSDOT/APWA. <br />18"MIN <br />-I -I r--I 1 r-I-...I 1 <br />COMPACTION <br />_I PROVIDE UNIFORM SUPPORT UNDER PIPE <br />�= 2 BARREL. <br />HAND TAMP UNDER PIPE HAUNCHES FOR ALL <br />BEDDING MATERIALS. <br />El <br />ALL BACKFILL MATERIAL SHALL BE PLACED IN <br />LIFTS NOT TO EXCEED 12 INCHES BEFORE <br />-I COMPACTION UNLESS AUTHORIZED BY THE <br />ENG <br />NEER DUE TO THE CHARACTER OF THE <br />MATERIAL IAND THE COMPACTING EQUIPMENT. <br />III <br />UPPER LIMIT OF COMPACT BEDDING MATERIAL TO 90% <br />PIPE ZONE MAXIMUM DENSITY EXCEPT DIRECTLY OVER <br />PIPE, HAND TAMP ONLY. MECHANICAL <br />COMPACTION OF BACK FILL MATERIAL SHALL <br />N NOT BEGIN UNTILTHE DEPTH OF COMPACTED <br />BACKFILL MATERIAL IS 2 FEET ABOVE THE TOP <br />OF PIPE. <br />EACH LIFT SHALL BE MECHANICALLY <br />o COMPACTED TO THE REQUIRED DENSITY PRIOR <br />O TO PLACING SUBSEQUENT LIFTS OF BACKFILL <br />MATERIAL. <br />1O COMPACTION TESTS SHALL BE AS REQUIRED BY <br />THE CITY ENGINEER, BUT IN NO CASE LESS THAN <br />2 TESTS EVERY 200 FEET OF TRENCH (ONE AT <br />LOWER LIMIT SUBGRADE AND ONE AT 50% OF TRENCH <br />OF PIPE ZONE DEPTH). <br />IN PLACE DENSITY AND MOISTURE CONTENT <br />4 WILL BE DETERMINED USING NUCLEAR <br />METHOD, ASTM 2922-71. <br />LABORATORY MAXIMUM DRY DENSITY AND <br />OPTIMUM MOISTURE CONTENT WILL BE <br />DETERMINED USING THE MODIFIED PROCTOR <br />METHOD IN ACCORDANCE WITH ASTM D-1557. <br />NOTES <br />E AND GRATE SHALL BE INSTALLED WITHIN ± 1/4" <br />JSH WITH FINISHED GRADE. <br />T FRAME AND GRATE TO <br />H PAVEMENT SLOPE. <br />MATCH EXISTING SLOPE OF <br />GUTTER OR STREET CROWN <br />FRAME, SEE STANDARD <br />DRAWING 406 <br />PLASTIC SHIM STRIPS <br />(MEADOW BURKE, DAYTON <br />SUPERIOR OR EQUAL) WOOD <br />WEDGES/SHIMS ARE NOT ALLOWED <br />GROUT BETWEEN SHIMS WITH <br />4000 PSI CEMENT CONCRETE <br />SOLID BRICKS OR <br />RECTANGULAR <br />ADJUSTMENT SECTION, <br />SEE STANDARD <br />DRAWINGS 401, 402, <br />403 OR 404. <br />EVERETT PUBLIC WORKS <br />WASHINGTON DEPARTMENT <br />D11EI SASS HEATHERgGRIFFIN ` PDA"0 ILHELM awl WRB 03/O7/2017 <br />TITLE <br />TYPICAL FRAME AND STANDARDBa. <br />GRATE INSTALLATION 407 <br />NOTES <br />1. W = MAXIMUM WIDTH OF TRENCH. FOR PIPES 15" OR <br />LESS IN DIA W=40". FOR PIPES 18" OR GREATER W=1.5 X <br />I.D. + 18". PIPE MUST BE CENTERED IN TRENCH. <br />2. ALTERNATE SLOPING TRENCH WALL TO MEET O.S.H.A. <br />REQUIREMENTS (NO SLOPES STEEPER THAN 1:1 EXCEPT <br />FOR ROCK). <br />3. SUITABLE NATIVE MATERIAL OR IMPORTED GRAVEL <br />BORROW AS DIRECTED. COMPACT TO 90% MAXIMUM <br />DENSITY. <br />4. FOUNDATION GRAVEL IF REQUIRED BY THE ENGINEER TO <br />REPLACE UNSUITABLE MATERIAL. SHALL BE FOUNDATION <br />MATERIAL CLASS A, B OR AS APPROVED BY THE <br />ENGINEER. <br />5. IF DIRECTED BY THE ENGINEER THE TOP THREE TO FIVE <br />FEET OF BACKFILL SHALL BE IMPORTED GRAVEL BORROW <br />OR SUITABLE NATIVE MATERIAL COMPACTED TO 95% <br />MAXIMUM DENSITY. <br />6. SEE CITY OF EVERETT STANDARD DWG 326 FOR <br />PAVEMENT PATCH DETAILS. <br />7. VERTICAL TRENCH WALLS WITH SHORING TO CONFORM <br />TO O.S.H.A. REGULATIONS. <br />8. SUBGRADE OR GROUND SURFACE IN NON -PAVED AREAS. <br />9. EXCAVATED NATIVE MATERIAL OR STOCKPILED BACKFILL <br />MATERIAL. <br />10. FOR ALL TRENCHING TRANSVERSE TO THE ROADWAY <br />BACKFILL ABOVE THE PIPE ZONE SHALL BE CONTROLLED <br />DENSITY FILL. SEE SECTION 3-9.6 & 3-20.1 OF THESE <br />STANDARDS. <br />11. FOR UTILITY CUTS SUCH AS GAS, TELEPHONE, POWER, <br />AND CABLE TV LONGITUDINAL TO THE ROADWAY, <br />BACKFILL SHALL BE CONTROLLED DENSITY FILL. SEE <br />SECTION 3-9.5 OF THESE STANDARDS. <br />EVERETT PUBLIC WORKS <br />WASHINGTON DEPARTMENT <br />CITY B­ <br />T LE RYAN SASS SDAVID V01GT �APAU�L WILHELM awe ESH 12/11/2019 <br />STANDARD DRAWING N.. <br />TYPICAL TRENCH SECTION 614 <br />24" <br />0 7 OR 8 EQUAL SPACES <br />Ln <br />ci <br />DIRECTION OF FLOW <br />0 <br />0 <br />0 <br />3 <br />z <br />E <br />0 <br />0 <br />0 <br />a <br />24" <br />R a 4 EQUAL SPACES 4 EQUAL SPACES <br />z o �, <br />.. �H <br />00 <br />O N <br />SECTION C-C <br />CRUSHEI <br />BASE CO <br />t� <br />zw <br />0 <br />00 <br />LU <br />N <br />vni <br />m J <br />Y <br />° <br />L,., Q <br />a EE <br />�' <br />a w <br />J F- <br />Z <br />as <br />w <br />z2 <br />O w <br />g <br />w <br />a N <br />> <br />0 <br />0 <br />O <br />2 <br />z <br />0 <br />oa <br />O o <br />a <br />Q; <br />RECORD DRAWING <br />This Record Drawing has been prepared, in part, <br />based on "As -Built" information provided by <br />others. Though the as -built information and this <br />drawing are based on the best available <br />information, no presumption should be made <br />regarding the drawing's accuracy. <br />Jim Knappert 06/10/2024 <br />Permit Inspector <br />DETAIL A <br />in %n <br />in <br />%n <br />0 <br />N <br />in <br />�n <br />Ln <br />rn <br />STANDARD DIRECTIONAL GRATE <br />DETAIL A <br />ISOMETRIC <br />BI-DIRECTIONAL OPTION <br />ISOMETRIC <br />31� _I <br />1 1/4" <br />BOLT -DOWN SLOT <br />DETAIL A <br />STANDARD TRENCH SECTION <br />SEE STANDARD DRAWING 614 <br />I I <br />BEDDING AND FOUNDATION: <br />ALTERNATE SLOPING <br />TRENCH WALL <br />UPPER LIMIT OF <br />PIPE ZONE <br />NOTES <br />1. BOLT -DOWN CAPABILITY IS REQUIRED ON ALL <br />FRAMES, GRATES AND COVERS. PROVIDE TWO <br />HOLES IN THE FRAME THAT ARE VERTICALLY <br />ALIGNED WITH THE GRATE OR COVER SLOTS. THE <br />FRAME SHALL ACCEPT THE 5/8" - 11 NC X 2" <br />STAINLESS STEEL RECESSED ALLEN HEAD CAP SCREW <br />BEING TAPPED, OR OTHER APPROVED MECHANISM. <br />LOCATION OF BOLT DOWN HOLES VARIES BY <br />MANUFACTURER. <br />2. REFER TO WSDOT STANDARD SPECIFICATION <br />9-05.15(2) AND DESIGN CONSTRUCTION <br />STANDARDS AND SPECIFICATIONS SECTION 4 FOR <br />ADDITIONAL REQUIREMENTS. <br />3. FOR FRAME DETAILS, SEE STANDARD DRAWINGS <br />406 AND 407. <br />4. ALL GRATES MUST BE STENCILED OR STAMPED <br />"DUMP NO WASTE, DRAINS TO _", WHERE THE <br />BLANK SHALL BE FILLED IN WITH "STREAM", "LAKE", <br />"RIVER", "PUGET SOUND", OR "WETLAND" AS <br />APPLICABLE TO THE LOCATION WHERE THE GRATE IS <br />TO BE INSTALLED. <br />WSDOT STD PLAN B-30.30-01 AND B-30.40-01, ACCEPTABLE <br />SUBSTITUTE EXCEPT ALL STEEL RECESSED ALLEN SCREWS <br />MUST BE STAINLESS STEEL <br />EVERETT PUBLIC WORKS <br />0 WASHINGTON DEPARTMENT <br />011 <br />ri `DI SASS HEATHERgGRIFFIN 'APAUL WILHELM awl WRB 1/0 03/2019 <br />VANED GRATES STANDARD411 <br />FOR CATCH BASIN OR INLET <br />LIMITS OF TRENCH <br />W = MAXIMUM WIDTH OF TRENCH. FOR PIPES 15" OR <br />LESS IN DIAMETER W = 40". FOR PIPES 18" OR <br />GREATER W = 1 1/2 x I.D. + 18". PIPE MUST BE <br />CENTERED IN TRENCH. <br />MATERIALS <br />PIPE BEDDING MATERIAL SHALL BE CRUSHED <br />SURFACING BASE COURSE CONFORMING TO SECTION <br />9-03.9(3) OF THE STANDARD SPECIFICATIONS FOR <br />ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION <br />WSDOT/APWA. <br />OPTIONAL PIPE BEDDING (TO SPRING -LINE) FOR PIPE <br />15" DIA AND LARGER: PEA GRAVEL OR 3/4" CLEAN <br />ROCK CHIPS AS APPROVED IN ADVANCE BY ENGINEER. <br />OVER EXCAVATION AND PLACEMENT OF FOUNDATION <br />MATERIAL, IF REQUIRED SHALL BE FOUNDATION <br />MATERIAL CLASS A OR B CONFORMING TO SECTION <br />9-03.17 OF THE STANDARD SPECIFICATIONS FOR ROAD, <br />BRIDGE AND MUNICIPAL CONSTRUCTION <br />WSDOT/APWA. <br />PROCEDURE FOR COMPACTION <br />PROVIDE UNIFORM SUPPORT UNDER PIPE BARREL. <br />COMPACT BEDDING MATERIAL TO 90% MAXIMUM <br />DENSITY EXCEPT DIRECTLY OVER PIPE, HAND TAMP <br />LOWER LIMIT <br />ONLY. <br />OF PIPE ZONE <br />HAND TAMP UNDER PIPE HAUNCHES FOR ALL <br />BEDDING MATERIALS. <br />FOR ADDITIONAL COMPACTION INFORMATION SEE <br />STANDARD DWG 615. <br />OVER EXCAVATE AND PLACE <br />FOUNDATION MATERIAL CLASS A, B <br />OR AS APPROVED BY THE ENGINEER <br />WHEN SPECIFIED. <br />EVERETT PUBLIC WORKS <br />WASHINGTON DEPARTMENT <br />011 tlrtERYAN SASS SDAVID VOIGT 'DP WILHELM awe WRB 12�3072016 <br />BEDDING FOR PIPE -STANDARD DRAWING "o. <br />IN TRENCHES 615 <br />CO C <br />N O <br />N ;� <br />0 <br />0 <br />cr <br />W <br />CL <br />0 <br />LI <br />N <br />W I � <br />= a <br />M Q <br />wl� <br />m U <br />cn <br />q m <br />3 <br />F_ <br />U <br />M <br />Cn <br />Z <br />O <br />M <br />6 ~ <br />N <br />ti <br />W o <br />Z 00 <br />�Wa <br />M > <br />LL <br />~ = W <br />� H J <br />O�J <br />M <br />� > <br />OTOM <br />U. N O <br />�O <br />L <br />O <br />LL <br />7/19/23 1 <br />v <br />� <br />Q <br />v <br />N <br />O <br />AU` <br />2 <br />Cn <br />Cn <br />w <br />M <br />N <br />3 <br />3 <br />m <br />O <br />O <br />•a�i <br />° <br />t <br />a <br />v <br />0 <br />0 <br />0 <br />Q <br />0 <br />V <br />E <br />V <br />• <br />•% <br />^W <br />W <br />a--J <br />M <br />C. <br />0Im <br />bm <br />� <br />UJ <br />� <br />N <br />O <br />• <br />N <br />N <br />C. <br />IN <br />W <br />V <br />CO <br />r <br />V <br />L M <br />N <br />E <br />+' <br />Z N <br />o N <br />Cn <br />L LJ <br />J <br />CL <br />LLJ <br />U) <br />O <br />Ln <br />L0 <br />PO <br />N <br />O <br />N <br />00 <br />3 <br />0 <br />0 <br />I <br />N <br />N <br />N <br />01 <br />c <br />N <br />C <br />C <br />N <br />N <br />N <br />0 <br />O <br />O <br />N <br />N <br />'a1 <br />