SECTION 4 & 5, TOWNSHIP 29 NORTH, RANGE 5 EAST, W.M.
<br />ATTACH IN A MANNER THAT
<br />ASSURES FABRIC IS FIRMLY
<br />HELD BY THE BACKUP
<br />SUPPORT IN A WAY THAT
<br />REDUCES THE POTENTIAL
<br />FOR FABRIC TEARING
<br />BACKUP SUPPORT
<br />BACKFILLED &
<br />COMPACTED
<br />NATIVE SOIL
<br />BURY GEOTEXTILE
<br />IN TRENCH
<br />LE
<br />DRAINAGE
<br />GRATE FRP
<br />SEDIMENT
<br />AND DEBR
<br />DRAINAGE GRATE
<br />BELOW INLET GRATE
<br />DEVICE
<br />SECTION VIEW
<br />ISOMETRIC VIEW
<br />POST SEE WSDOT STANDARD
<br />SPECIFICATIONS 8-01.3(9)A
<br />FASTEN GEOTEXTILE TO
<br />POST EVERY 6" IN O.C.
<br />o cz
<br />N G
<br />SELF-LOCKING TIE-NYLONE
<br />�i 6/6 (MIN GRADE)
<br />120# MIN TENSILE STRENGTH,
<br />/ UV STABILIZED
<br />INSTALL BACKUP SUPPORT FOR
<br />THE GEOTEXTILE SEE STANDARD
<br />SPECIFICATION SECTION 8.01.3(9)A
<br />)W BYPASS
<br />V LET GRATE
<br />WATER
<br />ZETRIEVAL SYSTEM
<br />TYPICAL
<br />OVERFLOW BYPASS
<br />TYPICAL
<br />GEOTEXTILE FOR SILT FENCE
<br />SEE STANDARD SPECIFICATION
<br />SECTION 9-33.2 (1), TABLE 6 -
<br />oil
<br />j IIIIIII{�+�;�y
<br />IIIIII,II
<br />III
<br />III l l i l l l l l I l j l l l"l j l l"
<br />IIIIIIIIIIIIIIQIIII
<br />II"IIIIIIIIIIII
<br />Ijlllll
<br />111 TYPICAL SILT FENCE
<br />W WITH BACKUP SUPPORT
<br />NOTES
<br />1. CATCH BASIN INSERTS SHALL BE REMOVED AT THE
<br />END OF THE PROJECT.
<br />2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN
<br />DRAINAGE DEVICES PER THE MANUFACTURES'S
<br />RECOMMENDATIONS. CATCH BASIN INLET INSERTS
<br />SHALL BE INSTALLED IN CURB INLETS.
<br />3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO
<br />CLEARING AND GRADING ACTIVITY, OR UPON
<br />PLACEMENT OF A NEW CATCH BASIN.
<br />4. SEDIMENT SHALL BE REMOVED FROM THE UNIT
<br />WHEN IT BECOMES ONE THIRD FULL OR IN
<br />ACCORDANCE WITH THE MANUFACTURES'
<br />INSTRUCTIONS.
<br />5. SEDIMENT REMOVAL SHALL BE ACCOMPLISHED BY
<br />REMOVING THE INLET INSERTS, EMPTYING, AND
<br />RE -INSTALLING IT INTO THE CATCH BASIN. DO NOT
<br />WASH SEDIMENT INTO STORM DRAINS WHILE
<br />CLEANING.
<br />6. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE
<br />STORM WATER STRUCTURE IT WILL SERVICE.
<br />7. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF
<br />SYSTEM (OVERFLOW BYPASS).
<br />8. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF
<br />THE BIGD WITHOUT SPILLING THE COLLECTED
<br />MATERIAL.
<br />9. PERFORM MAINTENANCE IN ACCORDANCE WITH
<br />STANDARD SPECIFICATION 8-01.3(15).
<br />WSDOT STD PLAN 1-40.20-00 ACCEPTABLE SUBSTITUTE IF
<br />MAINTENANCE MEETS NOTES 1-5
<br />CITY OF EVERETT
<br />PUBLIC WORKS DEPARTMENT
<br />STORM DRAIN INLET
<br />PROTECTION 210
<br />NnTFS
<br />1. INSTALL THE ENDS OF THE SILT FENCE TO POINT
<br />SLIGHTLY UPSLOPE TO PREVENT SEDIMENT FROM
<br />FLOWING AROUND THE ENDS OF THE FENCE.
<br />2. PERFORM MAINTENANCE IN ACCORDANCE WITH
<br />WSDOT STANDARD SPECIFICATIONS 8-01.3(9)A
<br />AND 8-01.3(15).
<br />3. SPLICES SHALL NEVER BE PLACED IN LOW SPOTS
<br />OR SUMP LOCATIONS. IF SPLICES ARE LOCATED IN
<br />LOW OR SUMP AREAS, THE FENCE MAY NEED TO
<br />BE REINSTALLED UNLESS OTHERWISE APPROVED.
<br />4. INSTALL SILT FENCING PARALLELTO MAPPED
<br />CONTOUR LINES.
<br />5. DURING EXCAVATION, MINIMIZE DISTURBING
<br />THE GROUND AROUND TRENCH AS MUCH AS IS
<br />FEASIBLE, AND SMOOTH SURFACE FOLLOWING
<br />EXCAVATION TO AVOID CONCENTRATING FLOWS.
<br />COMPACTION MUST BE ADEQUATE TO PREVENT
<br />UNDERCUTTING FLOWS.
<br />STEEL POE
<br />(TYPICAL)
<br />FABRIC
<br />(GEOTEXTI
<br />(TYPICAL)
<br />SUPPORT
<br />L)
<br />SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER
<br />TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE
<br />FENCE AT THE OVERLAP.
<br />SPI ICE DETAII
<br />WSDOT STD PLAN 1-30.10-02 ACCEPTABLE SUBSTITUTE
<br />EXCEPT STEEL POST REQUIRED
<br />CITY OF EVERETT
<br />PUBLIC WORKS DEPARTMENT
<br />msu Hsu ,", T. D..
<br />TEMPORARY SILT FENCE 1 214
<br />LENGTH AS REQUIRED 100' h
<br />MAY BE REDUCED TO 50' MII
<br />SITES WITH LESS THAN ONE
<br />OF EXPOSED SOIL OR APPRO
<br />PLACE CONSTRUCTION GE01
<br />STABILIZATION FROM THE El
<br />ROADWAYTO THE CONSTRU
<br />RIP OC nIRF(TFn RV THE FN(
<br />ISOMETRIC VIEW
<br />CONSTRUCTION ENTRANCE
<br />T.E.S.C. GENERAL NOTES
<br />THE NOTES AND DETAILS PROVIDED ON THIS SHEET ILLUSTRATE SOME OF THE MOST
<br />COMMON TEMPORARY EROSION/SILTATION CONTROL BEST MANAGEMENT PRACTICES
<br />(BMPs). ALTHOUGH SOME MEASURES SHOWN HERE MAY NOT BE SPECIFIED IN THE T.E.S.C.
<br />PLAN FOR THIS PROJECT, THE DETAILS ARE PROVIDED FOR FUTURE REFERENCE SHOULD
<br />SITE CONDITIONS REQUIRE ADDITIONAL MEASURES BEYOND THOSE SPECIFIED.
<br />APPROPRIATE RESPONSES TO UNANTICIPATED SITE CONDITIONS MAY INCLUDE, BUT ARE
<br />NOT LIMITED TO, THE FOLLOWING ADDITIONAL BMPs:
<br />• STRAW MULCH
<br />• TEMPORARY DITCHES, SWALES, DIKES OR BASINS
<br />• JUTE OR SYNTHETIC MATTING, EITHER GENERIC OR PROPRIETARY
<br />• SLOPE SCARIFICATION OR TERRACING
<br />• ANCHORED PLASTIC SHEETING
<br />• MULCH, BRUSH OR GRAVEL FILTER BERMS
<br />• DUST CONTROL
<br />• TIRE WASH STATIONS
<br />• SODDING
<br />• ROCK CHECK DAMS
<br />SUCH MEASURES SHALL BE SELECTED BY THE CONTRACTOR IN CONSULTATION WITH THE
<br />CITY INSPECTOR AND THE CESCL, AND SHALL BE INSTALLED PER MANUFACTURER'S
<br />SPECIFICATIONS, ENGINEER'S DESIGN OR STANDARD CONSTRUCTION INDUSTRY
<br />PRACTICE AS THE SITUATION DICTATES.
<br />1. THE TEMPORARY EROSION/SEDIMENTATION CONTROL FACILITIES SHALL BE
<br />CONSTRUCTED PRIOR TO ANY GRADING OR LAND CLEARING IN ACCORDANCE WITH
<br />THE APPROVED TEMPORARY EROSION/SEDIMENTATION CONTROL PLAN. THESE
<br />FACILITIES MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION AND
<br />LANDSCAPING IS COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED.
<br />2. NONCOMPLIANCE WITH THE EROSION CONTROL REQUIREMENTS, WATER QUALITY
<br />REQUIREMENTS, AND/OR CLEARING LIMITS MAY RESULT IN REVOCATION OF PROJECT
<br />PERMITS OR PLAN APPROVAL, FINES AND BOND FORECLOSURES.
<br />3. THE T.E.S.C. FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR
<br />ANTICIPATED SITE CONDITIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />PROVIDING IMPROVED OR MODIFIED FACILITIES AS NECESSARY TO MAINTAIN RUNOFF
<br />WATER QUALITY DURING AND AFTER SIGNIFICANT STORM EVENTS AND TO ADDRESS
<br />THE ACTUAL SITE AND SOILS CONDITIONS ENCOUNTERED.
<br />4. CONTRACTOR SHALL MAINTAIN ON SITE AT ALL TIMES SUFFICIENT QUANTITIES OF
<br />EROSION CONTROL MATERIALS TO COVER ALL EXPOSED SOIL IN THE EVENT OF
<br />UNANTICIPATED WEATHER CONDITIONS. CONTRACTOR MAY CONSIDER PHASING
<br />GRADING ON LARGE SITES TO MINIMIZE BARE SOIL EXPOSURE.
<br />5. THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION,
<br />MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE T.E.S.C. FACILITIES IS THE
<br />RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS
<br />APPROVED. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED FOR NO
<br />MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7
<br />DAYS FROM MAY 1 THROUGH SEPTEMBER 30. STABILIZE WITH APPROVED T.E.S.C.
<br />METHODS (E.G. SEEDING, MULCHING, NETTING, EROSION BLANKETS, PLASTIC
<br />COVERING, ETC.). SOIL STOCKPILES SHALL BE STABILIZED WITHIN 24 HOURS.
<br />6. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE
<br />APPLIED AT A MINIMUM THICKNESS OF TWO INCHES.
<br />7. 7. ANY AREA NEEDING T.E.S.C. MEASURES, NOT REQUIRING IMMEDIATE ATTENTION,
<br />SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS.
<br />NOTES
<br />1. STABILIZED CONSTRUCTION ENTRANCE SHALL
<br />MEETTHE REQUIREMENTS OF WSDOT STANDARD
<br />SPECIFICATION SECTION 8-01.3(7).
<br />INSTALL DRIVEWAY CULVERT
<br />IF THERE IS A ROADSIDE DITCH
<br />PRESENT
<br />30' MIN TYPICAL
<br />PERMEABLE BALLAST TYPICAL SEE
<br />STANDARD SPECIFICATION
<br />SECTION 9-03.9(2)
<br />PROVIDE FULL WIDTH OF
<br />INGRESS/EGRESS AREA
<br />15' MIN
<br />WSDOT STD PLAN 1-80.10-02 ACCEPTABLE SUBSTITUTE
<br />4k7rCITY OF EVERETT
<br />PUBLIC WORKS DEPARTMENT
<br />CONSTRUCTION ACCESS 201
<br />8. THE T.E.S.C. FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A
<br />MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A STORM EVENT.
<br />9. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED
<br />WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE
<br />TEMPORARY BMPs ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED
<br />OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL SHALL BE
<br />PERMANENTLY STABILIZED.
<br />10. CONTRACTOR SHALL USE INDUSTRY BEST MANAGEMENT PRACTICES TO PREVENT
<br />PETROLEUM PRODUCTS, FERTILIZERS, CONCRETE BY-PRODUCTS AND OTHER
<br />POLLUTANTS FROM ENTERING OFF -SITE DRAINAGE COURSES. SLASH PILES AND
<br />OTHER SOLID WASTE SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE
<br />LOCAL REGULATIONS.
<br />11. WASTEWATER FROM PROJECT ACTIVITIES AND DE -WATERING SHALL BE ROUTED TO
<br />AN UPLAND AREA FOR REMOVAL OF FINE SEDIMENTS AND OTHER CONTAMINANTS.
<br />ONLY CLEAN, UNPOLLUTED WATER SHALL LEAVE THE SITE.
<br />12. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING.
<br />WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR CITY OF
<br />EVERETT APPROVAL.
<br />CONTRACTOR RESPONSIBILITY FOR
<br />EROSION/SILTATION CONTROL
<br />IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL PLAN THAT STORM
<br />WATER RUNOFF BE CONTROLLED AT ALL TIMES TO PREVENT SOIL EROSION AND TO MAINTAIN
<br />WATER QUALITY. ANY AND ALL MEASURES NECESSARY TO DO SO SHALL BE EMPLOYED BY THE
<br />CONTRACTOR.
<br />1. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDITIONS, THE CONTRACTOR SHALL BE
<br />FULLY RESPONSIBLE FOR ENSURING THAT EROSION DOES NOT OCCUR ON THE SITE AND
<br />THAT POLLUTED OR SILT -LADEN RUNOFF DOES NOT LEAVE THE SITE OR ENTER INTO ANY
<br />CREEK, STREAM, WETLAND OR WATER BODY ON OR OFF THE SITE.
<br />2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE CONTRACTOR SHALL BE
<br />RESPONSIBLE FOR SELECTING AND IMPLEMENTING APPROPRIATE METHODS, "BEST
<br />MANAGEMENT PRACTICES" (BMPs), FOR STORM WATER TREATMENT AND CONTROL THAT
<br />MEET THE REQUIREMENTS OF BOTH THE WASHINGTON STATE DEPARTMENT OF ECOLOGY
<br />AND CITY OF EVERETT.
<br />3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES TO THE
<br />CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (C.E.S.C.L.) AND TO CITY OF EVERETT. IN
<br />THE EVENT THAT THE INSTALLED WATER QUALITY CONTROL MEASURES ARE INEFFECTIVE AT
<br />CONTROLLING EROSION AND SILTATION, THE CONTRACTOR SHALL IMMEDIATELY REPORT TO
<br />AND CONSULT WITH THE C.E.S.C.L. TO FIND AN APPROPRIATE REMEDY. ALL CONSTRUCTION
<br />ACTIVITIES, WITH THE EXCEPTION OF EROSION AND SILTATION CONTROL MEASURES, SHALL
<br />CEASE UNTIL SUCH TIME AS THE WATER QUALITY IS BROUGHT INTO COMPLIANCE WITH D.O.E.
<br />AND CITY OF EVERETT REQUIREMENTS.
<br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS AND
<br />ANTICIPATING STORM ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES IN
<br />ANTICIPATION OF THE WEATHER.
<br />5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPs SHALL BE STORED ON
<br />SITE AND SHALL BE IMMEDIATELY AVAILABLE FOR USE. SUCH SUPPLIES AND MATERIALS
<br />SHALL INCLUDE, BUT NOT BE LIMITED TO, STRAW BALES OR OTHER MULCHING MATERIAL,
<br />SILT FENCING AND STAKES, FILTER FABRIC, ETC.
<br />6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, THE CONTRACTOR SHALL
<br />MONITOR ALL EROSION CONTROL MEASURES AND SHALL PRIORITIZE IMPLEMENTATION AND
<br />MAINTENANCE OF EROSION AND SILTATION CONTROL MEASURES ABOVE ALL OTHERS.
<br />z
<br />O
<br />F_
<br />U
<br />M
<br />2
<br />F-
<br />U)
<br />z
<br />O
<br />U
<br />2
<br />O
<br />LL
<br />0
<br />W
<br />M
<br />U)
<br />U)
<br />>
<br />W
<br />2
<br />M
<br />N
<br />v
<br />a)
<br />rn
<br />a
<br />REVISIONS
<br />CO) cm
<br />O C9
<br />L.f_ LL n N 01
<br />W 0�vo
<br />W n d7 W
<br />Z W
<br />0�00
<br />> cm cv)
<br />O O IG
<br />IIr
<br />W r�r^ lai
<br />VJ
<br />Z�
<br />W�
<br />W
<br />7
<br />N
<br />I-
<br />W
<br />W
<br />I= N
<br />H �
<br />N N
<br />co
<br />z �
<br />� La
<br />N
<br />Woo
<br />m m
<br />U) O Z
<br />cm
<br />r d
<br />EN
<br />TON ty'
<br />0 �
<br />o � a
<br />0000
<br />9Qs t�'♦
<br />!?RO�I\N�ti'7
<br />J
<br />J
<br />r
<br />WW C
<br />Z cm co J
<br />H aLu
<br />a
<br />Lu 0
<br />d co IL
<br />N ILO W a
<br />a M Lu
<br />> N
<br />Q W
<br />CZ
<br />G
<br />DATE:
<br />9/14/23
<br />JOB #:
<br />21-162
<br />•
<br />Know wbafs below.
<br />Call before you dig.
<br />C2m2
<br />UNPUBLISHED WORK COPYRIGHT© 2023 BY HARMSEN &ASSOCIATES INC.
<br />
|