Laserfiche WebLink
SECTION 4 & 5, TOWNSHIP 29 NORTH, RANGE 5 EAST, W.M. <br />ATTACH IN A MANNER THAT <br />ASSURES FABRIC IS FIRMLY <br />HELD BY THE BACKUP <br />SUPPORT IN A WAY THAT <br />REDUCES THE POTENTIAL <br />FOR FABRIC TEARING <br />BACKUP SUPPORT <br />BACKFILLED & <br />COMPACTED <br />NATIVE SOIL <br />BURY GEOTEXTILE <br />IN TRENCH <br />LE <br />DRAINAGE <br />GRATE FRP <br />SEDIMENT <br />AND DEBR <br />DRAINAGE GRATE <br />BELOW INLET GRATE <br />DEVICE <br />SECTION VIEW <br />ISOMETRIC VIEW <br />POST SEE WSDOT STANDARD <br />SPECIFICATIONS 8-01.3(9)A <br />FASTEN GEOTEXTILE TO <br />POST EVERY 6" IN O.C. <br />o cz <br />N G <br />SELF-LOCKING TIE-NYLONE <br />�i 6/6 (MIN GRADE) <br />120# MIN TENSILE STRENGTH, <br />/ UV STABILIZED <br />INSTALL BACKUP SUPPORT FOR <br />THE GEOTEXTILE SEE STANDARD <br />SPECIFICATION SECTION 8.01.3(9)A <br />)W BYPASS <br />V LET GRATE <br />WATER <br />ZETRIEVAL SYSTEM <br />TYPICAL <br />OVERFLOW BYPASS <br />TYPICAL <br />GEOTEXTILE FOR SILT FENCE <br />SEE STANDARD SPECIFICATION <br />SECTION 9-33.2 (1), TABLE 6 - <br />oil <br />j IIIIIII{�+�;�y <br />IIIIII,II <br />III <br />III l l i l l l l l I l j l l l"l j l l" <br />IIIIIIIIIIIIIIQIIII <br />II"IIIIIIIIIIII <br />Ijlllll <br />111 TYPICAL SILT FENCE <br />W WITH BACKUP SUPPORT <br />NOTES <br />1. CATCH BASIN INSERTS SHALL BE REMOVED AT THE <br />END OF THE PROJECT. <br />2. CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN <br />DRAINAGE DEVICES PER THE MANUFACTURES'S <br />RECOMMENDATIONS. CATCH BASIN INLET INSERTS <br />SHALL BE INSTALLED IN CURB INLETS. <br />3. CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO <br />CLEARING AND GRADING ACTIVITY, OR UPON <br />PLACEMENT OF A NEW CATCH BASIN. <br />4. SEDIMENT SHALL BE REMOVED FROM THE UNIT <br />WHEN IT BECOMES ONE THIRD FULL OR IN <br />ACCORDANCE WITH THE MANUFACTURES' <br />INSTRUCTIONS. <br />5. SEDIMENT REMOVAL SHALL BE ACCOMPLISHED BY <br />REMOVING THE INLET INSERTS, EMPTYING, AND <br />RE -INSTALLING IT INTO THE CATCH BASIN. DO NOT <br />WASH SEDIMENT INTO STORM DRAINS WHILE <br />CLEANING. <br />6. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE <br />STORM WATER STRUCTURE IT WILL SERVICE. <br />7. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF <br />SYSTEM (OVERFLOW BYPASS). <br />8. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF <br />THE BIGD WITHOUT SPILLING THE COLLECTED <br />MATERIAL. <br />9. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />STANDARD SPECIFICATION 8-01.3(15). <br />WSDOT STD PLAN 1-40.20-00 ACCEPTABLE SUBSTITUTE IF <br />MAINTENANCE MEETS NOTES 1-5 <br />CITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />STORM DRAIN INLET <br />PROTECTION 210 <br />NnTFS <br />1. INSTALL THE ENDS OF THE SILT FENCE TO POINT <br />SLIGHTLY UPSLOPE TO PREVENT SEDIMENT FROM <br />FLOWING AROUND THE ENDS OF THE FENCE. <br />2. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />WSDOT STANDARD SPECIFICATIONS 8-01.3(9)A <br />AND 8-01.3(15). <br />3. SPLICES SHALL NEVER BE PLACED IN LOW SPOTS <br />OR SUMP LOCATIONS. IF SPLICES ARE LOCATED IN <br />LOW OR SUMP AREAS, THE FENCE MAY NEED TO <br />BE REINSTALLED UNLESS OTHERWISE APPROVED. <br />4. INSTALL SILT FENCING PARALLELTO MAPPED <br />CONTOUR LINES. <br />5. DURING EXCAVATION, MINIMIZE DISTURBING <br />THE GROUND AROUND TRENCH AS MUCH AS IS <br />FEASIBLE, AND SMOOTH SURFACE FOLLOWING <br />EXCAVATION TO AVOID CONCENTRATING FLOWS. <br />COMPACTION MUST BE ADEQUATE TO PREVENT <br />UNDERCUTTING FLOWS. <br />STEEL POE <br />(TYPICAL) <br />FABRIC <br />(GEOTEXTI <br />(TYPICAL) <br />SUPPORT <br />L) <br />SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER <br />TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE <br />FENCE AT THE OVERLAP. <br />SPI ICE DETAII <br />WSDOT STD PLAN 1-30.10-02 ACCEPTABLE SUBSTITUTE <br />EXCEPT STEEL POST REQUIRED <br />CITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />msu Hsu ,", T. D.. <br />TEMPORARY SILT FENCE 1 214 <br />LENGTH AS REQUIRED 100' h <br />MAY BE REDUCED TO 50' MII <br />SITES WITH LESS THAN ONE <br />OF EXPOSED SOIL OR APPRO <br />PLACE CONSTRUCTION GE01 <br />STABILIZATION FROM THE El <br />ROADWAYTO THE CONSTRU <br />RIP OC nIRF(TFn RV THE FN( <br />ISOMETRIC VIEW <br />CONSTRUCTION ENTRANCE <br />T.E.S.C. GENERAL NOTES <br />THE NOTES AND DETAILS PROVIDED ON THIS SHEET ILLUSTRATE SOME OF THE MOST <br />COMMON TEMPORARY EROSION/SILTATION CONTROL BEST MANAGEMENT PRACTICES <br />(BMPs). ALTHOUGH SOME MEASURES SHOWN HERE MAY NOT BE SPECIFIED IN THE T.E.S.C. <br />PLAN FOR THIS PROJECT, THE DETAILS ARE PROVIDED FOR FUTURE REFERENCE SHOULD <br />SITE CONDITIONS REQUIRE ADDITIONAL MEASURES BEYOND THOSE SPECIFIED. <br />APPROPRIATE RESPONSES TO UNANTICIPATED SITE CONDITIONS MAY INCLUDE, BUT ARE <br />NOT LIMITED TO, THE FOLLOWING ADDITIONAL BMPs: <br />• STRAW MULCH <br />• TEMPORARY DITCHES, SWALES, DIKES OR BASINS <br />• JUTE OR SYNTHETIC MATTING, EITHER GENERIC OR PROPRIETARY <br />• SLOPE SCARIFICATION OR TERRACING <br />• ANCHORED PLASTIC SHEETING <br />• MULCH, BRUSH OR GRAVEL FILTER BERMS <br />• DUST CONTROL <br />• TIRE WASH STATIONS <br />• SODDING <br />• ROCK CHECK DAMS <br />SUCH MEASURES SHALL BE SELECTED BY THE CONTRACTOR IN CONSULTATION WITH THE <br />CITY INSPECTOR AND THE CESCL, AND SHALL BE INSTALLED PER MANUFACTURER'S <br />SPECIFICATIONS, ENGINEER'S DESIGN OR STANDARD CONSTRUCTION INDUSTRY <br />PRACTICE AS THE SITUATION DICTATES. <br />1. THE TEMPORARY EROSION/SEDIMENTATION CONTROL FACILITIES SHALL BE <br />CONSTRUCTED PRIOR TO ANY GRADING OR LAND CLEARING IN ACCORDANCE WITH <br />THE APPROVED TEMPORARY EROSION/SEDIMENTATION CONTROL PLAN. THESE <br />FACILITIES MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION AND <br />LANDSCAPING IS COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. <br />2. NONCOMPLIANCE WITH THE EROSION CONTROL REQUIREMENTS, WATER QUALITY <br />REQUIREMENTS, AND/OR CLEARING LIMITS MAY RESULT IN REVOCATION OF PROJECT <br />PERMITS OR PLAN APPROVAL, FINES AND BOND FORECLOSURES. <br />3. THE T.E.S.C. FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br />ANTICIPATED SITE CONDITIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />PROVIDING IMPROVED OR MODIFIED FACILITIES AS NECESSARY TO MAINTAIN RUNOFF <br />WATER QUALITY DURING AND AFTER SIGNIFICANT STORM EVENTS AND TO ADDRESS <br />THE ACTUAL SITE AND SOILS CONDITIONS ENCOUNTERED. <br />4. CONTRACTOR SHALL MAINTAIN ON SITE AT ALL TIMES SUFFICIENT QUANTITIES OF <br />EROSION CONTROL MATERIALS TO COVER ALL EXPOSED SOIL IN THE EVENT OF <br />UNANTICIPATED WEATHER CONDITIONS. CONTRACTOR MAY CONSIDER PHASING <br />GRADING ON LARGE SITES TO MINIMIZE BARE SOIL EXPOSURE. <br />5. THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION, <br />MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE T.E.S.C. FACILITIES IS THE <br />RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS <br />APPROVED. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED FOR NO <br />MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 <br />DAYS FROM MAY 1 THROUGH SEPTEMBER 30. STABILIZE WITH APPROVED T.E.S.C. <br />METHODS (E.G. SEEDING, MULCHING, NETTING, EROSION BLANKETS, PLASTIC <br />COVERING, ETC.). SOIL STOCKPILES SHALL BE STABILIZED WITHIN 24 HOURS. <br />6. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE <br />APPLIED AT A MINIMUM THICKNESS OF TWO INCHES. <br />7. 7. ANY AREA NEEDING T.E.S.C. MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, <br />SHALL BE ADDRESSED WITHIN FIFTEEN (15) DAYS. <br />NOTES <br />1. STABILIZED CONSTRUCTION ENTRANCE SHALL <br />MEETTHE REQUIREMENTS OF WSDOT STANDARD <br />SPECIFICATION SECTION 8-01.3(7). <br />INSTALL DRIVEWAY CULVERT <br />IF THERE IS A ROADSIDE DITCH <br />PRESENT <br />30' MIN TYPICAL <br />PERMEABLE BALLAST TYPICAL SEE <br />STANDARD SPECIFICATION <br />SECTION 9-03.9(2) <br />PROVIDE FULL WIDTH OF <br />INGRESS/EGRESS AREA <br />15' MIN <br />WSDOT STD PLAN 1-80.10-02 ACCEPTABLE SUBSTITUTE <br />4k7rCITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />CONSTRUCTION ACCESS 201 <br />8. THE T.E.S.C. FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A <br />MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A STORM EVENT. <br />9. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED <br />WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE <br />TEMPORARY BMPs ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED <br />OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL SHALL BE <br />PERMANENTLY STABILIZED. <br />10. CONTRACTOR SHALL USE INDUSTRY BEST MANAGEMENT PRACTICES TO PREVENT <br />PETROLEUM PRODUCTS, FERTILIZERS, CONCRETE BY-PRODUCTS AND OTHER <br />POLLUTANTS FROM ENTERING OFF -SITE DRAINAGE COURSES. SLASH PILES AND <br />OTHER SOLID WASTE SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE <br />LOCAL REGULATIONS. <br />11. WASTEWATER FROM PROJECT ACTIVITIES AND DE -WATERING SHALL BE ROUTED TO <br />AN UPLAND AREA FOR REMOVAL OF FINE SEDIMENTS AND OTHER CONTAMINANTS. <br />ONLY CLEAN, UNPOLLUTED WATER SHALL LEAVE THE SITE. <br />12. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. <br />WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR CITY OF <br />EVERETT APPROVAL. <br />CONTRACTOR RESPONSIBILITY FOR <br />EROSION/SILTATION CONTROL <br />IT IS THE INTENT OF THIS TEMPORARY EROSION AND SILTATION CONTROL PLAN THAT STORM <br />WATER RUNOFF BE CONTROLLED AT ALL TIMES TO PREVENT SOIL EROSION AND TO MAINTAIN <br />WATER QUALITY. ANY AND ALL MEASURES NECESSARY TO DO SO SHALL BE EMPLOYED BY THE <br />CONTRACTOR. <br />1. REGARDLESS OF SITE, WEATHER, SOIL OR OTHER CONDITIONS, THE CONTRACTOR SHALL BE <br />FULLY RESPONSIBLE FOR ENSURING THAT EROSION DOES NOT OCCUR ON THE SITE AND <br />THAT POLLUTED OR SILT -LADEN RUNOFF DOES NOT LEAVE THE SITE OR ENTER INTO ANY <br />CREEK, STREAM, WETLAND OR WATER BODY ON OR OFF THE SITE. <br />2. BEYOND THE MINIMUM REQUIREMENTS SHOWN ON THIS PLAN, THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR SELECTING AND IMPLEMENTING APPROPRIATE METHODS, "BEST <br />MANAGEMENT PRACTICES" (BMPs), FOR STORM WATER TREATMENT AND CONTROL THAT <br />MEET THE REQUIREMENTS OF BOTH THE WASHINGTON STATE DEPARTMENT OF ECOLOGY <br />AND CITY OF EVERETT. <br />3. THE CONTRACTOR SHALL REPORT ALL WATER QUALITY CONCERNS AND ACTIVITIES TO THE <br />CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (C.E.S.C.L.) AND TO CITY OF EVERETT. IN <br />THE EVENT THAT THE INSTALLED WATER QUALITY CONTROL MEASURES ARE INEFFECTIVE AT <br />CONTROLLING EROSION AND SILTATION, THE CONTRACTOR SHALL IMMEDIATELY REPORT TO <br />AND CONSULT WITH THE C.E.S.C.L. TO FIND AN APPROPRIATE REMEDY. ALL CONSTRUCTION <br />ACTIVITIES, WITH THE EXCEPTION OF EROSION AND SILTATION CONTROL MEASURES, SHALL <br />CEASE UNTIL SUCH TIME AS THE WATER QUALITY IS BROUGHT INTO COMPLIANCE WITH D.O.E. <br />AND CITY OF EVERETT REQUIREMENTS. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING WEATHER FORECASTS AND <br />ANTICIPATING STORM ACTIVITY AND SHALL SCHEDULE ALL PROJECT ACTIVITIES IN <br />ANTICIPATION OF THE WEATHER. <br />5. ALL SUPPLIES AND MATERIALS NECESSARY FOR IMPLEMENTING BMPs SHALL BE STORED ON <br />SITE AND SHALL BE IMMEDIATELY AVAILABLE FOR USE. SUCH SUPPLIES AND MATERIALS <br />SHALL INCLUDE, BUT NOT BE LIMITED TO, STRAW BALES OR OTHER MULCHING MATERIAL, <br />SILT FENCING AND STAKES, FILTER FABRIC, ETC. <br />6. DURING AND AFTER RUNOFF PRODUCING STORM EVENTS, THE CONTRACTOR SHALL <br />MONITOR ALL EROSION CONTROL MEASURES AND SHALL PRIORITIZE IMPLEMENTATION AND <br />MAINTENANCE OF EROSION AND SILTATION CONTROL MEASURES ABOVE ALL OTHERS. <br />z <br />O <br />F_ <br />U <br />M <br />2 <br />F- <br />U) <br />z <br />O <br />U <br />2 <br />O <br />LL <br />0 <br />W <br />M <br />U) <br />U) <br />> <br />W <br />2 <br />M <br />N <br />v <br />a) <br />rn <br />a <br />REVISIONS <br />CO) cm <br />O C9 <br />L.f_ LL n N 01 <br />W 0�vo <br />W n d7 W <br />Z W <br />0�00 <br />> cm cv) <br />O O IG <br />IIr <br />W r�r^ lai <br />VJ <br />Z� <br />W� <br />W <br />7 <br />N <br />I- <br />W <br />W <br />I= N <br />H � <br />N N <br />co <br />z � <br />� La <br />N <br />Woo <br />m m <br />U) O Z <br />cm <br />r d <br />EN <br />TON ty' <br />0 � <br />o � a <br />0000 <br />9Qs t�'♦ <br />!?RO�I\N�ti'7 <br />J <br />J <br />r <br />WW C <br />Z cm co J <br />H aLu <br />a <br />Lu 0 <br />d co IL <br />N ILO W a <br />a M Lu <br />> N <br />Q W <br />CZ <br />G <br />DATE: <br />9/14/23 <br />JOB #: <br />21-162 <br />• <br />Know wbafs below. <br />Call before you dig. <br />C2m2 <br />UNPUBLISHED WORK COPYRIGHT© 2023 BY HARMSEN &ASSOCIATES INC. <br />