Laserfiche WebLink
TBLOCK <br />TBLOCK-ec <br />PTN. OF SW 1/4, SE 1/4 OF SEC 14, TWP 28 N, R4E W.M. <br />aeu■■■■■■ <br />i <br />Y <br />0 <br />3 <br />LEGEND <br />ABBREVIATIONS <br />CITY OF EVERETT STANDARD PLAN NOTES <br />EXISTING <br />PROPOSED <br />AC ASPHALT CONCRETE PAVEMENT EOP EDGE OF PAVEMENT PL PLACE <br />TESC <br />ROADWAY CENTERLINE <br />- <br />- <br />AP ANGLE POINT ESC EROSION AND SEDIMENT CONTROL PT POINT OF TANGENCY <br />A7B ASPHALT TREATED BASE ESD ENTERING SIGHT DISTANCE PVI POINT OF VERTICAL INTERSECTION <br />1. <br />APPROVAL OF THIS EROSIONISEDIMENTA71ON CONTROL (ESC) PLAN DOES NOT CONSTITUTE APPROVAL OF <br />PROJECT BOUNDARY LINE <br />- - <br />- - <br />AVE AVENUE ESMT. EASEMENT PUE PUBLIC UTILITY EASEMENT <br />PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, <br />BCR BEGIN CURB RETURN EVA EMERGENCY VEHICLE ACCESS PWS PUBLIC WORKS STANDARDS <br />CHANNELS, RETENTION FACILITIES, U71LI71ES). <br />PROPERTY BOUNDARY LINE <br />BOC BACK OF CURB EXIST. EXISTING REQD. REQUIRED <br />2. <br />THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND <br />RIGHT-OF-WAY LINE <br />- - <br />- - <br />BOW BOTTOM OF WALL FL FLOW LINE ROW RIGHT-OF-WAY <br />UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL <br />EASEMENT LINE <br />- - - - - - - - <br />CASP CRITICAL AREA SI7E PLAN FL. FLANGE RT RIGHT <br />IF CENTERLINE FOC FACE OF CURB S SOUTH <br />CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. <br />CB CATCH BASIN HORIZ HORIZONTAL SO STORM DRAIN <br />3. <br />THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE <br />EDGE OF PAVEMENT LINE <br />CDF CONTROLLED DENSITY FILL IE INVERT ELEVATION SP SPACE <br />FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE <br />10' CONTOUR LINE - <br />- 290- <br />- <br />CMP CORRUGATED METAL PIPE INT INTERSECTION SS SANITARY SEWER <br />FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE <br />COE CITY OF EVERETT LCPE LINED CORRUGATED POLYETHYLENE So STOPPING SIGHT DISTANCE <br />APPLICANT/CONTRACTOR FOR THE DURA71ON OF CONSTRUCTION. <br />2' CONTOUR LINE <br />CONC. CONCRETE PIPE STA STATION <br />4. <br />THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING <br />SS <br />CONN. CONNECTION LF LINEAL FEET TESC TEMPORARY EROSION AND <br />AND GRADING ACTIVITIES, AND IN SUCH MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN <br />SANITARY SEWER MAIN <br />SS SS <br />CONT. CONTINUOUS LT LEFT SEDIMENT CONTROL <br />WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY <br />WATER LINE <br />W <br />CPP CORRUGATED POLYETHYLENE PIPE LUI LAND USE INSPECTOR TOC TOP OF CURB <br />MAX. MAXIMUM <br />5. <br />STANDARDS. <br />THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE <br />FIRE SUPPLY <br />F <br />- F - F - F - F - F - F - F - <br />(W/SMOOTH INTERIOR WALLS TIP. TYPICAL <br />CR ) <br />CSBC USHED SURFACING BASE COURSE MSE MECHANICALLY STABILIZED EARTH 7BW TOP BACK OF WALK <br />CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED <br />STORM PIPE <br />SD <br />CSTC CRUSHED SURFACING TOP COURSE MH MANHOLE TOW TOP OF WALL <br />FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT -LADEN WATER DO NOT <br />GAS LINE <br />GAS <br />GAS <br />VER UNLESS NOTED OTHERWISE <br />DIA. DIAMETER MIN. MINIMUM UNOVERTICAL <br />DI DUCTILE IRON MJ MECHANICAL JOINT VERT. <br />6. <br />LEAVE THE SITE. <br />THE ESC FACIL171ES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT CONTRACTOR <br />FENCE LINE <br />X <br />DW DRIVEWAY N NORTH WSDOT WASHINGTON DEPT. OF <br />TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. <br />E EAST NIC NOT IN CONTRACT TRANSPORTATION <br />7. <br />THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A <br />POWER LINE <br />OP <br />ECR END CURB RETURN O.C. ON CENTER / <br />OC <br />MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. <br />EDDS ENGINEERING DESIGN AND POINT OF CURVATURE ywjJ WESTNTH <br />8. <br />AT NO 71ME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED <br />BURIED POWER LINE <br />B P <br />DEVELOPMENT STANDARDS PE PLAIN END WS WATER SERVICE <br />CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE <br />UTILITY EASEMENT <br />EL. ELEVATION PI POINT OF INTERSECTION <br />CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />9. <br />STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND <br />TELEPHONE LINE <br />T <br />FOR THE DURA71ON OF THE T. ADDITIONAL MEASURES MAY E REQUIRED TO ENSURE <br />MAINGENERAL <br />PROJECT NOTES <br />THATTALLED <br />THE <br />PA D AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br />BURIED TELEPHONE LINE <br />BT <br />10. <br />THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED <br />SWALE <br />1. ALL WORKMANSHIP, METHODS AND MATERIALS FOR THIS PROJECT SHALL CONFORM TO THE LATEST EDITION OF THE STANDARD <br />OFF THE SITE. CONTRACTOR SHALL KEEP CITY STREETS CLEAR OF DIRT AND DEBRIS AT ALL 71MES <br />SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION AS PRODUCED BY WSDOT AND THE WASHINGTON STATE CHAPTER OF <br />DURING CONSTRUCTION. DUST SUPPRESSION AND STREET CLEANING MUST OCCUR AS DIRECTED BY THE <br />SILT FENCE <br />-X-X-X-X-X- <br />THE APWA; CITY OF EVERETT DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS FOR DEVELOPMENT AND ANY SPECIAL <br />PUBLIC WORKS INSPECTOR. <br />TEMP. CONSTRUCTION FENCING <br />0 0 0 <br />PROVISIONS PROVIDED BY THESE PLANS OR OTHER CONTRACT DOCUMENTS FOR THE PROJECT. <br />11. <br />APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF <br />2. EXISTING UTILITIES ARE SHOWN IN THESE PLANS PER THE LATEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL VERIFY THE <br />THE PROPOSED BMPS FAIL. <br />CLEARING LIMIT <br />LOCATIONS OF ALL UTILITIES AND RELATED SURFACE FEATURES WITHIN THE PROJECT AREA AND NOTIFY THE ENGINEER OF ANY <br />12. <br />BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 <br />DISCREPANCIES WITH THE PLAN INFORMATION PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL, AT MINIMUM, CONTACT THE <br />DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH <br />SANITARY SEWER CLEAN OUT <br />o <br />UNDERGROUND UTILITIES LOCATE CENTER (811) TO HAVE UTILITIES VERIFIED ON THE GROUND PRIOR TO CONSTRUCTION. <br />SEPTEMBER 30. <br />SANITARY SEWER MANHOLE <br />O <br />3. THE TEMPORARY EROSION AND SEDIMENTATION CONTROL (TESC) MEASURES SHOWN IN THESE PLANS SHALL BE CONSIDERED A MINIMUM. <br />13. <br />NOTIFY THE CITY PUBLIC WORKS INSPECTOR AT LEAST 24 HOURS PRIOR TO DEWATERING ACTIVITIES. <br />STORM DRAIN CATCH BASIN - TYPE 1 <br />❑ <br />' <br />THE CONTRACTOR SHALL PROVIDE ANY REASONABLE ADDITIONAL MEASURES AS MAY BE REQUIRED TO FACILITATE ACTUAL SI7E RUNOFF <br />HANDLE HIGHLY TURBID OR OTHERWISE CONTAMINATED DEWATERING WATER SEPARATELY FROM <br />CONDITIONS AT THE 77ME OF CONSTRUCTION. ALL NECESSARY EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN -PLACE <br />STORMWATER. <br />STORM DRAIN CATCH BASIN - TYPE 11 <br />O❑ <br />f% <br />PRIOR TO ANY DEMOLITION OR CONSTRUCTION ACTIVITIES. <br />14. <br />THE APPROVED PROJECT PUBLIC WORKS PERMIT AND SWPPP SHALL BE RETAINED ON SITE OR READILY <br />4. ALL NEW PAVEMENT, SIDEWALKS, AND CURB AND GUTTER INSTALLED BY THIS PROJECT SHALL BEAR ON SUITABLE, COMPACT <br />AVAILABLE TO THE CONTRACTOR THROUGHOUT THE DURATION OF THE CONSTRUCTION PROJECT. <br />STORM DRAIN INLET (NO CATCH) <br />0 <br />FOUNDA7ION SOILS IN ACCORDANCE WITH THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS AND PROJECT CONTRACT DOCUMENTS. <br />15. <br />DESIGN, INSTALL, IMPLEMENT, AND MAINTAIN EFFECTIVE POLLUTION PREVENTION MEASURES TO MINIMIZE <br />STORM DRAIN CULVERT <br />SIMILAR EXISTING FACIL177ES TO REMAIN, WHICH ARE DISTURBED OR DAMAGED DURING CONSTRUCTION, SHALL BE REPLACED IN -KIND TO <br />THE DISCHARGE OF POLLUTANTS. <br />THE SAME STANDARDS OF NEW FACILITIES. <br />16. <br />PROTECT ALL LID BMPS FROM SEDIMENTATION THROUGH INSTALLATION AND MAINTENANCE OF EROSION <br />WATER CAP/PLUG <br />] <br />5. ALL PAVEMENT MARKINGS SHALL CONFORM TO THE WSDOT STANDARD PLANS AND SPECIFICATIONS AS AMENDED OR SUPPLEMENTED BY <br />AND SEDIMENT CONTROL BMPS ON PORTIONS OF THE SITE THAT DRAIN INTO THE LID BMPS. <br />AS PROVIDED IN THEC> <br />THE PROJECT PLANS, DETAILS,WATER °A <br />COUPLING <br /># <br />6. ALL EX S77NG ON -SITE WELLS ORNSEPTICCTANKS SHALL BE PROPERLY ABANDONEDIFICA71ONS <br />BLICENSED CONTRACTOR, CERTIFIED TO PERFORM <br />STORM DRAINAGE <br />GUARD POST <br />0 <br />• <br />SUCH WORK, AND WRITTEN VERIFICA7ION OF ABANDONMENT SHALL BE PROVIDED TO THE OWNER, WASHINGTON STATE DEPARTMENT OF <br />ECOLOGY, AND SNOHOMISH COUNTY HEALTH DEPARTMENT IN ACCORDANCE WITH APPLICABLE AGENCY REGULATIONS. <br />1. <br />NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED OR PUT INTO USE UNTIL IT HAS <br />REDUCER <br />> <br />► <br />7. THE MATERIALS AND METHODS OF INSTALLATION FOR ALL WATER AND SANITARY SEWER FACILITIES SHALL BE IN ACCORDANCE WITH THE <br />BEEN INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT. <br />THRUST BLOCK <br />a <br />LATEST CITY OF EVERETT STANDARDS. <br />8. AT LEAST TWO COPIES OF THESE PLANS SHALL BE ON THE JOB SI7E WHEN CONSTRUCTION IS IN PROGRESS. THE CONTRACTOR SHALL <br />2. <br />AL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION <br />WATER METER <br />® <br />ALSO HAVE COPIESOF THE APPLICABLE GENCYHALLBE STANDAARDSVAI L B AT HE JOB USING HE RELATED <br />STANDARDS AND STANDARD SPECIFICATIONS AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, <br />AL APPLICABLEREGULAPERTOROE <br />CONSTRUCTION S BTINED ANY UC ON TY. NE COMPLETE SET <br />BIRGDE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION). <br />2 NOZZLE FIRE HYDRANT <br />IQ <br />OF PROJECT PLANS WITH RECORDS OF AS -BUILT INFORMATION SHALL BE PROVIDED TO THE PROJECT ENGINEER AT THE END OF THE <br />3 NOZZLE FIRE HYDRANT <br />-6- <br /># <br />PROJECT. <br />3. <br />APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND <br />9. THE CONTRACTOR SHALL COORDINATE ACTIVITIES OF ALL UTILITY PURVEYORS IMPACTED BY WORK FOR THIS PROJECT AND SHALL <br />ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF <br />FLANGE/BOND FL JOINT <br />II <br />CONTACT THEM PRIOR TO CONSTRUCTION TO SCHEDULE WORK FOR PROVISIONS FOR AND BE RESPONSIBLE TO SUPPORT, MAINTAIN, OR <br />LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING <br />MECHANICAL JOINT <br />C <br />E <br />OTHERWISE PR07ECT AND KEEP IN SERVICE ALL EXISTING UTIL171ES WHETHER SHOWN OR NOT SHOWN ON THESE PLANS DURING <br />U71LI71ES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR <br />CONSTRUCTION. <br />AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF <br />PUSH-ON/HUB JOINT <br />C <br />C <br />10. UTILITIES, OR INTERFERING PORTIONS OF UTILITIES, THAT ARE ABANDONED IN PLACE SHALL BE REMOVED BY THE CONTRACTOR TO THE <br />RELATED CONSTRUCTION ON THE PROJECT. <br />EXTENT NECESSARY TO COMPLETE THE PROPOSED WORK. THE CONTRACTOR SHALL PLUG THE REMAINING EXPOSED ENDS OF ABANDONED <br />THREAD JOINT <br />UTILITIES. CUTTING AND PLUGGING OF LINES TO BE ABANDONED SHALL BE CONSIDERED INCIDENTAL TO OTHER WORK PERFORMED. <br />4. <br />ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY <br />AIR RELIEF VALVE' <br />11. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL PROVISIONS OF THE SOILS REPORT FOR THE SITE BE <br />FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. <br />OBSERVED AND COMPLIED WITH DURING ALL PHASES OF SITE PREPARATION, GRADING OPERATIONS, FOUNDATION, SLAB AND PAVING <br />BLOW -OFF VALVE <br />P <br />T <br />CONSTRUCTION. THE CONTRACTOR SHALL N071FY THE PROJECT ENGINEER IMMEDIATELY OF ANY PROVISION OF THE SOIL REPORT WHICH <br />5. <br />ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED 'DUMP NO WASTE, DRAINS TO STREAM, LAKE, <br />BUTTERFLY VALVE <br />�y <br />CONFLICT WITH INFORMATION SHOWN ELSEWHERE ON THESE DRAWINGS, OR WHICH REQUIRES FURTHER CLARIFICATION. <br />RIVER, PUGET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE PROJECT. <br />12. THE OWNER SHALL OBTAIN THE SERVICES OF A QUALIFIED SOILS ENGINEER AND/OR TESTING AGENCY TO PERFORM SUBGRADE/BACKFILL <br />6. <br />SHALL COMPLY WITH EVERETT MUNICIPAL CODE (EMC), CITY ADOPTED STORMWATER MANAGEMENT MANUAL, <br />EM ), CITY A <br />CHECK VALVE <br />T <br />DENSITY TESTS OR TO DIRECT THE REMOVAL AND REPLACEMENT OF ANY UNSUITABLE MATERIALS DURING CONSTRUCTION. A <br />REPRESENTATIVE OF THE SOILS ENGINEER AND OR 7ES71NG AGENCY SHALL BE AVAILABLE TO OBSERVE AND TO VERIFY FIELD <br />POLICIES AND CRITERIA SET FORTH IN THE CITY DESIGN AND CONSTRUCTION STANDARDS & <br />GATE/GENERAL VALVE <br />m <br />N <br />CONDITIONS AS WORK PROCEEDS. THE SOILS ENGINEER SHALL SUBMIT FIELD REPORTS AS REQUIRED TO CERTIFY THE METHODS AND <br />SPECIFICATIONS. <br />PLUG VALVE <br />ATIILS ARE IN WITH PROJECT SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE THE APPROPRIATE SOILS <br />MATERIALS <br />WATER <br />INSPECTIONS AND TESTING. <br />GAS METER <br />o <br />13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE TRAFFIC CONTROL DURING CONSTRUCTION ADJACENT TO OR WITHIN <br />GAS VALVE <br />ALL PUBLIC ROADWAYS. TRAFFIC CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY CONSTRUCTION ACTIVITY. THE CONTRACTOR <br />A. <br />NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS OF AN APPROVED <br />SHALL MAINTAIN ACCESS TO ALL PRIVATE PROPERTY DRIVEWAYS DURING CONSTRUCTION. <br />BACKFLOW PREVENTION DEVICE PRIOR TO SATISFACTORY FLUSHING, TESTING, DISINFECTION, AND RECEIPT <br />PAD MOUNTED TRANSFORMER <br />❑o <br />Q <br />OF SATISFACTORY BACTERIOLOGICAL TEST RESULTS <br />POWER VAULT <br />© <br />© <br />CLEARING AND GRADING NOTES <br />B. <br />CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE CITY U71LI71ES DEPARTMENT AT <br />TRANSMISSION TOWER (SCALEABLE) <br />THE DEVELOPERS EXPENSE. THE CITY UTILITIES DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS <br />UTILITY POLE <br />A. ALL ENVIRONMENTALLY SENSITIVE AREAS AND THEIR BUFFERS SHALL BE FLAGGED FOR EASY IDENTIFICATION BEFORE CLEARING TAKES <br />DAYS NOTICE FOR EACH CONNECTION. THE CITY U71LI71ES DEPARTMENT SHALL THEREAFTER DETERMINE THE <br />PLACE. AFTER THESE AREAS ARE FLAGGED AND CLEARING LIMITS ARE APPROVED, AN AREA WIDE ENOUGH TO INSTALL A SILT FENCE <br />DATE AND 71ME AT WHICH THE CONNECTION SHALL BE MADE. <br />POWER POLE <br />AT THE CLEARING LIMITS, BY HAND OR BY MECHANICAL METHODS, MAY BE CLEARED. THE TOP OF THE SILT FENCE SHALL BE <br />REFLAGGED AFTER INSTALLATION. IF A SILT FENCE IS NOT REQUIRED, THE AREA SHALL BE DELINEATED USING AN ORANGE BARRIER. <br />C. <br />AL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT STANDARDS. <br />UTILITY POLE ANCHOR <br />TELEPHONE RISER <br />o <br />■ <br />B. ALL PERIMETER EROSION AND SEDIMENT CONTROL SHALL BE CONSTRUCTED, OPERATIONAL, AND INSPECTED BY THE PUBLIC WORKS <br />D. <br />A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF CONSTRUCTION. <br />INSPECTOR PRIOR TO INITIATION OF CLEARING AND GRUBBING OPERATIONS. <br />THE CITY OF EVERETT ENGINEERING DEPARTMENT CONSTRUCTION DIVISION MUST BE NOTIFIED AT LEAST 24 <br />TELEPHONE VAULT <br />O <br />TD <br />HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION. <br />BUS STOP <br />aus <br />eus <br />C. DANGER TREES SHALL BE IDENTIFIED THROUGH A JOINT INSPECTION INVOLVING B07H THE DEVELOPER AND PUBLIC WORKS INSPECTOR. <br />NO TREES SHALL BE REMOVED UN71L PERMISSION IS OBTAINED FROM THE APPROPRIATE PARTIES. <br />E <br />THE DEVELOPER OR THE DEVELOPERS AUTHORIZED AGENT SHALL NOTIFY THE CITY OF UTIL171ES <br />MAIL BOX <br />- <br />DEPARTMENT OF A PERSON WHO CAN BE CONTACTED REGARDING PROBLEMS DURING CONSTRUCTION ON A <br />RIP RAP <br />D. WHERE POSSIBLE, NATURAL VEGETATION SHALL BE MAINTAINED FOR EROSION AND SEDIMENT CONTROL <br />24 HOUR BASIS. <br />ROCKERY <br />E. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE EROSION CONTROL FACILITIES SHALL BE MAINTAINED <br />F. <br />MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL SEPARATION BETWEEN POTABLE <br />AND/OR ALTERED AS REQUIRED TO ENSURE CONTINUING EROSION/SEDIMENT CONTROL. <br />AND NON -POTABLE CONVEYANCE SYSTEMS. <br />SHRUB <br />GENERAL SIGN <br />F. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UN71L SUCH 71ME THAT <br />G. <br />ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY CITY UTILITIES DEPARTMENT PERSONNEL ONLY. ALL <br />CLEARING AND/OR CONSTRUCTION IS COMPLETED, PERMANENT DRAINAGE FACILITIES ARE OPERATIONAL, AND THE POTEN71AL FOR <br />VALVES, NEW AND EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES. <br />REGULATORY SIGN <br />EROSION HAS PASSED. <br />TREE (CONIFER) <br />G. AT A MINIMUM, EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE MAINTAINED MONTHLY, OR FOLLOWING EACH RUNOFF -PRODUCING <br />TREE (DECIDUOUS) <br />0 <br />STORM, TO ENSURE PROPER OPERATION OF ALL EROSION AND SEDIMENT CONTROL FACILITIES. <br />YARD LIGHT <br />l( <br />H. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, SIZE, NOR LOCATION OF PERMANENT PIPES, RES7RICTORS, <br />BRIDGE/TUNNEL <br />OR DETENTION FACILITIES, BUT IS AN APPROVAL OF EROSION AND SEDIMENT CONTROL BMPS ONLY. <br />ASPHALT PAVEMENT <br />1. THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN. TRACKING OF MUD AND DEBRIS FROM THE SI7E WILL NOT BE ALLOWED. FAILURE TO <br />CONCRETE <br />COMPLY WITH THIS CONDITION WILL RESULT IN ALL WORK ON THE SITE BEING STOPPED. <br />J. THE WASHINGTON STATE CLEAN AIR ACT REQUIRES THE USE OF ALL KNOWN, AVAILABLE, AND REASONABLE MEANS OF CONTROLLING <br />AIR POLLUTION, INCLUDING DUST. DUST CAN BE CONTROLLED BY WETTING EXPOSED SOILS, WASHING TRUCK WHEELS BEFORE THEY <br />LEAVE THE SITE, AND INSTALLING AND MAINTAINING ROCK CONSTRUCTION ENTRANCES. CONSTRUCTION VEHICLE 7RACKOUT IS A MAJOR <br />SOURCE OF DUST AND ANY EVIDENCE OF TRACK -OUT CAN TRIGGER FINES FROM THE DEPARTMENT OF ECOLOGY OR THE PUGET SOUND <br />AIR POLLUTION CONTROL AGENCY. <br />K. EVERY EFFORT SHALL BE MADE TO CLOSE UTILITY LINES BY THE END OF THE DAY AND MATERIAL EXCAVATED DURING UNDERGROUND <br />UTILITY CONSTRUCTION SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES (WHERE CONSISTENT WITH SAFETY AND SPACE <br />CONSIDERATIONS). <br />Copyright ® 2024 CPH Consultants, LLC. All Rights <br />fun, � I <br />Ci <br />z <br />S <br />THE AS -BUILT INFORMATION <br />SHOWN ON THIS PLAN IS PER <br />A FIELD SURVEY PERFORMED <br />BY PACIFIC COAST SURVEYS, <br />INC. AND/OR RECORD DATA <br />PROVIDED BY THE <br />CONTRACTOR. <br />W <br />Z) a <br />'a^ Y <br />V J <br />Z � <br />0 c, <br />J <br />z � <br />LU a <br />00 <br />CLIENT <br />z <br />0 <br />z <br />z_ <br />x <br />3 <br />zz <br />0 <br />U <br />x <br />2 <br />0 <br />x <br />0 <br />z <br />U) <br />w <br />Ld <br />w <br />ILL <br />PACIFIC RIDGE HOMES <br />17921 BOTHELL-EVERETT HWY <br />SUITE 100 <br />BOTHELL, WA 98012 <br />PHONE: (425)438-8444 <br />C P H <br />CONSULTANTS <br />Site Planning , Civil Engineering <br />Landscape Architecture - Land Use Consulting <br />11321-B NE 1201h Street <br />Krkland, WA 98034 - )425) 285-2390 <br />101 South Wenatchee Avenue, Suite C3 <br />Wenatchee, WA 98801 - (509) 293-7731 <br />www.cphconsuItants.com <br />PROJECT NO. <br />0132-21-026 <br />DRAWING <br />CO"01 <br />SHEET 2 OF 30 <br />