Laserfiche WebLink
Page 10 <br /> Table 10-Load adjustment factors for Carbon Steel 1/2-in.diameter KB-TZ2 in uncracked concrete''2 <br /> Edge distance in shear <br /> 1/2-in.K13-TZ2 Spacing factor in Edge distance Spacing factor in L I Concrete thickness <br /> uncracked tension factor in tension shear' factor in shear4 <br /> concrete { {{ Toward edge To edge <br /> fAN /PM JAV fRy �� 1HV <br /> Effective in. 1-1/2 2 2-1/2 3-1/4 1-1/2 2 2-1/2 3-1/4 1-1/2 2 2-1/2 3-1/4 1-1/2 2 2-1/2 3-1/4 1-1/2 2 2-1/2 3-1/4 1-1/2 2 2-1/2 3-1/4 <br /> Embedment (mm) (38) (51) (64) (83) (38) (51) (64) (83) (38) (51) (64) (83) (38) (51) (64) (83) (38) (51) (64) (83) (38) (51) (64) (83) <br /> h� <br /> Nominal In. 2 2-1/2 3 3-3/4 2 2-1/2 3 3-3/4 2 2-1/2 3 3-3/4 2 2-1/2 3 3-3/4 2 2-1/2 3 3-3/4 2 2-1/2 3 3-3/4 <br /> Embedment <br /> h (mm) (51) (64) (76) (95) (51) (64) (76) (95) (51) (64) (76) (95) (51) (64) (76) (95) (51) (64) (76) (95) (51) (64) (76) (95) <br /> 2 (51) n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0.53 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a <br /> 2-1/4 (57) n/a n/a n/a n/a n/a n/a n/a n/a n/a 0.54 n/a n/a n/a n/a n/a n/a 21 n/a n/a n/a n/a <br /> 2-3/4 (70) n/a n/a n/a n/a .33 n/a n/a n/a 0.55 n/a .35 0.23 0.1 n/a 0.29 n/a n/a n/a n/a <br /> _ 3 (76) n/a n/a 5 n/a 0.47 0.3 n/a n/a 0.55 n/a 0.40 026 0.16 n/a .55 0.47 0.33 n/a n/a n/a n/a <br /> \E / ( ) / / / / / / / / / / <br /> v E 3-1 4 83 n a n a 0.67 n a .59 0.50 0. n a n a - :57 0.5 n a 0.45 0.30 0.19 n a C59 0.50 0.37 0.52 n a n a n a <br /> 3-1/2 (89) n/a 0... n/a .64 0.53. n/a '0.58 0.58 n/a 0.51 0.33 0 _ n/a -64 0 .0.38 0.54 n/a n/a n/a <br /> 4 (102) n/a 0.77 n/a - 0. n/a 0.62 0.59 0.5 n/a 0.62 0.40 n/a _73 42 0.58 0.70 n/a. n/a <br /> 4-3/4 (121) n/a 0 0.82 n/a 0 0.48 n/a 0.64 0.61 -A n/a 0.80 0.52 0.33 n/a .86 0.48 0.63 0.76 n/a n/a <br /> Wm 5 (127) n/a 210.83 n/a 0. 0.50 n/a 0.65 0.6 n/a �0.87 0.58 0.35 n/a .91 0.50 0.65 0.78 0.67 n/a <br /> w 5-1/4 (133) n/s 4 0.85 0.77 n/a 0 0.53 n/a SO 0. 0.59 n/a rO.93 0.61 0.38 n/a .95 Od 0.53 0.66 0.80 0.69 n/a <br /> 5-1/2 (140) n/a 0.96 0.87 0.78 n/a 0 0.55 n/a 0.67 0.. 0.59 n/a 0.65 0.41 n/a .00 0.810.55 0.68 0.82 0.71 0.61 <br /> am 6 (152) n/a 1.00 '90 0.81 n/a 0 0:. 0.60 n/a 0.68 0.60 n/a - 0.46 n/a .000 0.60 0.71 0.85 0.74 0.63 <br /> 'W8 (203) n/a 0.91 1.00 1.00 1.00 0.80 n/a 0.74 0.63 1.001.00 10.72 1.00 .00 1.00 0.80 0.82 0.98 0.85 0.73 <br /> m U 9-3/4 (248) n/a 1.00 1.00 0.98 n/a 0.80 0.72 0.66 0.96 0.98 0.90 1.00 0.94 0.81 <br /> 10 (254) n/a 1.00 1.00 n/a 0.80 0.73 0.67 too too 1.00 1.00 0.91 0.95 0.82 <br /> 12 (305) 1.00 0.75 0.86 0.77 0.70 1.00 1.00 0.89 <br /> 24 (610) 1.00 1.00 1.00 0.90 1.00 <br /> >30 (762) 1.00 <br /> Ft=2.6 kips and Fv=0.07 kips from baseplate analysis with Q=2.0. The NRV baseplate is <br /> oriented so that the nearest anchor is 12 '/2" from edge of concrete (trench thickened slab), and <br /> spacing=7.5". Select '/z"D x 3-3/4" embedment. The edge distance factor is 1.00 and the <br /> spacing factor is 0.89 for tension. The edge distance for shear is 1.00, the spacing factor is 0.62 <br /> and the (8") concrete shear factor is 0.73. <br /> Fta= 5,005 lbs *1.00 * 0.89 =4.45 kips and Fva= 10,785 lbs * 1.00 * 0.62 * 0.73 =4.88 kips <br /> F.S. = [(2.6/4.45)^2+ (0.07/4.88)n2]^0.5 =0.58 < 1.00 PASS [NOTE: about the same as the <br /> baseplate spreadsheet] <br /> ► USE 1/2"D Hilti KB-TZ2 x 6"to allow for 1" leveling grout. <br /> Evaluation Report Donaldson-Torit Dust Collection System for Boeing Everett 40-53 DAPP Project <br />