Laserfiche WebLink
Permit#: M2406-019 <br /> Site Address: 3003 W Casino Rd Bldg 40-53 <br /> Owner: BOEING COMPANY <br /> App,Date: 6/7/2024 <br /> Description: Boeing Dust Collector System Bldg <br /> 40-53 <br /> ------------------------------------------------------------------------ <br /> Review Status: Approved by Building,C.Bearman <br /> BOEING 747 MOCKUP BUILDING I Review Date: 6/14/2024 <br /> Additional Permits Are Required <br /> For This Project To Include: <br /> ❑Plumbing <br /> ❑ Sprinkler <br /> BUILDING 40-053 ❑Mechanical <br /> ®Electrical <br /> ❑ Fire Alarm <br /> BOEING COMMERCIAL AIRPLANE GROUP <br /> THIS SET OF <br /> DRAWINGS SHALL BE <br /> ON JOB SITE AT ALL <br /> DAPP DustInstallation TIMES <br /> City of Everett Permit Review <br /> EVERETT Status:Reviewed for Permit <br /> 06/14/2024 2:07:39 PM <br /> BOEING EVERETT FACILITY APPROVED <br /> Once of Community,Planning 8 Economic Development <br /> 3003 WEST CASINO ROAD PLANNING DEPARTMENT <br /> NAME: Jessica Jarvi <br /> DATE: 06/14/2024 <br /> EVERETT, WASHINGTON 98203 <br /> VICINITY MAP PROJECT SUMMARY GENERAL NOTES <br /> DESCRIPTION OF WORK: EQUIPMENT SLAB ANCHORING,ELECTRICAL AND MECHANICAL WORK TO SUPPORT THE <br /> INSTALLATION OF TWIN DONALDSON-TORIT DUST COLLECTION SYSTEMS,FOR NEW 1. ALL WORK SHALL CONFORM TO APPLICABLE CODES AND REGULATIONS,AND TO BOEING SITE STANDARDS AND SECURITY CONSTRUCTION MATERIALS IN SUITABLE AREAS ACCEPTABLE TO OWNER OUTSIDE THE BUILDING.THE 40-053 BUILDING IS <br /> TWIN APES ROUTERS WITHIN THE 40-53 DAPP CELL.NO OTHER CHANGES TO BUILDING. ACCESS REQUIREMENTS.CRANE VENDOR AND SITE GENERAL CONTRACTOR SHALL COORDINATE WITH THE FACILITY AN OPERATING FACILITY,PLANS AND PROCEDURES FOR CONTAINING DUST AND DEBRIS MUST BE APPROVED. <br /> CONTRACTOR: TIED 40-053 BOEING SITE REPRESENTATIVE FOR CONSTRUCTION AREA AND SECURITY REGULATIONS. <br /> - 12. EXISTING EQUIPMENT IN AREAS ADJACENT TO CONSTRUCTION SHALL REMAIN IN PLACE DURING THE WORK AND SHALL <br /> 2. SITE GENERAL CONTRACTOR SHALL PROVIDE ALL WORK SHOWN AND IOR NOTED ON THESE DRAWINGS,INCLUDING ALL BE PROTECTED BY THE CONTRACTOR.COORDINATE PROTECTION,MATERIALS AND SCHEME,WITH OWNER'S SITE <br /> LABOR,MATERIALS,AND SERVICES REQUIRED FOR THE SATISFACTORY COMPLETION OF WORK SHOWN ON THESE REPRESENTATIVE FOR APPROVAL.SAWCUTTINGIFOUNDATION POUR ADJACENT TO ONGOING OPERATIONS MAY HAVE TO <br /> SITE ADDRESS: 3003 WEST CASINO ROAD DRAWING. BE DEFERRED OR CONTINUED AT NIGHT IN ORDER TO COMPLETE THE WORK WITHOUT DISRUPTING BOEING OPERATIONS. <br /> EVERETT,WASHINGTON 98203 <br /> 3. SITE GENERAL CONTRACTOR SHALL PROVIDE COMPLETE INSTALLATION,INCLUDING SAWCUTTING AND DEMOLITION 13. COORDINATE CONSTRUCTION ACTIVITIES WITH OWNER INCLUDING,BUT NOT LIMITED TO,MATERIAL STORAGE,RECYCLE <br /> Cp�t� PROJECT OWNER BOEING COMMERCIAL <br /> W-AIRPLANE,SEATTLE DISTRICT REMOVAL,FOUNDATION,INSTRUCTIONS FOR INSTALLLAIPMENT INSTALLATION AND TION OF NEW EQUIPMENT WITH ELECCAL TRICAL AND NSTRING TO UMENT CONTROLS. TEMPORARY FACILITIEAND TRASH BINS, S, <br /> ACCESS,NOISE,WORK AREAS AND HOURS,DISPOSITION OF REMOVED MATERIALS,AND <br /> P.O. OX 37707,M S 1 <br /> 8 O AREA SEATTLE,WA.98124-2207 <br /> 4. SITE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ARCHITECTURAL,STRUCTURAL, 14. CONTRACTOR SHALL VERIFY EXACT SIZE AND QUANTITY TAKE-OFFS,CONNECTION SIZE,LOCATION AND QUANTITY <br /> OWNER CONTACT: LYNNE HARDY MECHANICAL&ELECTRICAL WORK.ARCHITECTURAL,STRUCTURAL,MECHANICAL&ELECTRICAL DRAWINGS SHALL BE OWNER FURNISHED FOR EQUIPMENT,FIXTURES AND FURNISHINGS PRIOR TO INSTALLATION.CONTRACTOR SHALL BE <br /> 4253425851 REFERRED TO IN DETAIL FOR COORDINATION OF SPECIFIC REQUIREMENTS. RESPONSIBLE FOR PROTECTION OF ALL IMMEDIATELY-ADJACENT BOEING EQUIPMENT. <br /> TAX PARCEL NO: 28041100200100 5. THE SITE GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION AND ORDERING 15. MANLIFT EQUIPMENT USED TO REMOVE OR INSTALL OVERHEAD ELECTRICALAND MECHANICAL EQUIPMENT SHALL <br /> a jl ZONING LI(LIGHT INDUSTRIAL) MATERIALS AND SHALL BE RESPONSIBLE FOR THE COORDINATING THEIR WORK WITH BOEING SITE REPRESENTATIVE.. COMPLY WITH WISHA AND ASME SAFETY REGULATIONS. <br /> IIilllll a s BOEING ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES BEFORE COMMENCING ANY WORK. <br /> 1 ''r ARCHIENGR.CONTACT: ANTHAE360 LLC atln: 16. "NIC"MEANS"NOT WITHIN THE WORK SCOPE OF THE PROJECT."UON"MEANS"PROVIDE AS TYPICAL,UNLESS OTHERWISE <br /> 6. ALL EXISTING CONDITIONS AND DESIGNATIONS SHOWN IN THESE CONSTRUCTION DOCUMENTS,THOUGH BELIEVED TO BE NOTED". <br /> ROBE RT A.MARMADUKE,PE,PEng ACCURATE,SHOULD BE CONSIDERED APPROXIMATE.IT IS SITE GENERAL CONTRACTOR'S RESPONSIBILITY TO FIELD <br /> 360447-8753.com VERIFY CONDITIONS BEFORE STARTING WORK.WHERE EXISTING CONDITIONS FOUND DIFFER FROM THAT REPRESENTED 17. UNLESS OTHERWISE NOTED ALL DIMENSIONS ARE TO FACE OF CONCRETE,FACE OF STUDS OR CENTERLINE OF <br /> 360-047-8753 ON CONTRACT DOCUMENTS,NOTIFY BOEING ENGINEER IN A WRITTEN REQUEST FOR CLARIFICATION.DO NOT PERFORM COLUMNS UNLESS OTHERWISE NOTED. <br /> AFFECTED WORK UNTIL CLARIFICATION IS OBTAINED. <br /> — � llll I it 18. CONTRACTOR SHALL REVIEW DESIGNS,INCLUDING SPECIFIC PRODUCT DATA FOR MECHANICAL,ELECTRICAL, <br /> CODE SUMMARY 7. BOEING ENGINEER SHALL HAVE ACCESS TO THE WORK AT ALL TIMES FOR THE PURPOSE OF OBSERVING CONSTRUCTION. STRUCTURAL,PIPING,FIRE PROTECTION SYSTEMS AND SHALL PROVIDE CONCEALED ELEMENTS INCLUDING,BUT NOT <br /> 8. CONTRACTOR SHALL INSTALL ALL TEMPORARY BARRIERS AND EXCAVATION SHORING TO INSURE THE SAFETY OF THE LIMITED TO,BLOCKING,ANCHORAGE,OPENINGS,SLEEVES. <br /> ..., =iij II== I I WORK UNTIL IT IS IN ITS COMPLETED FORM AND ACCEPTED BY BOEING ENGINEER. 19. VERIFY THAT WITHIN AREA OF PROJECT WORK,EXISTING EQUIPMENT THAT REQUIRES ACCESS SHALL CONTINUE TO BE <br /> ACCESSIBLE AFTER PROJECT COMPLETION.FIELD VERIFY AND INFORM ARCHITECT OF ANYAPPARENT EQUIPMENT <br /> ALL WORK SHALL CONFORM TO APPLICABLE BUILDING CODES AND AUTHORITIES INCLUDING 9. THE CONTRACTOR SHALL REPAIR TO AS-NEW CONDITION ALL AREAS DAMAGED BY DEMOLITION OR CONSTRUCTION AND ACCESS CONCERNS,NO DAMPERS OR OTHER COMPONENTS REQUIRING ACCESS SHALL BE INSTALLED ABOVE HARD <br /> -- BUT NOT LIMITED TO THE FOLLOWING AS ADOPTED BY THE CITY OF EVERETT,WA SHALL FINISH TO MATCH ADJOINING SURFACES. CEILING UNLESS AN EQUIPMENT ACCESS DOOR IS PROVIDED.COORDINATE EXACT LOCATION OF PIPING AND CONDUIT TO <br /> I INTERNATIONAL BUILDING CODE 2018-2021 MAINTAIN NECESSARY CLEARANCE ABOVE.LIGHT FIXTURES AND TO ALLOW ACCESS FOR MAINTENANCE OF EQUIPMENT. <br /> O ASCE7-16 ALLOWABLE BUILDING LOADS 10. TWO SETS OF 24N36"PRINTS WILL BE PROVIDED AND SHALL BE MAINTAINED IN GOOD ORDER AT THE SITE,ALL <br /> • UNIFORM MECHANICAL CODE WAC 51-52 <br /> PROJECT NATIO NAL ELECTRICAL CODE NFPA 70 AS ADOPTED BY WAC 296d6B <br /> DIFFERENCES BETWEEN THE LOCATIONS OR ARRANGEMENTS INDICATED ON THESE DRAWINGS AND THOSE OF THE 20. 40-53 RECORD FOUNDATION DESIGN SLAB I SOIL PROFILE IS:REINFORCED SLAB 8 ar 12 +i6 COARSE CRUSHED ROCK <br /> ACTUAL INSTALLATION SHALL BE RECORDED ON THE DRAWINGS SET.AT THE END OF THE PROJECT AND PRIOR TO FINAL COMPACTED STRUCTURAL FILL PLACED ON UNDISTURBED GLACIAL TILL OF GREATER THAN 10,000 PSF CAPACITY. <br /> O . INTERNATIONAL FIRE CODE PAYMENT,THE CONTRACTOR SHALL SIGN AND DATE EACH"FINAL RECORD"DRAWING AS BEING A CORRECT AND DAMES&MOORE(BUILDING)SOILS REPORT ALLOWS 3,000 PSF.BOEING SLAB DEMOLITION FOR ROUTERS SHOWS 10" <br /> a I IT BUILDING ORIGINAL PERMIT: 1967 UNIFORM BUILDING CODE(UBC)AS AMENDED BY THE STATE OF WASHINGTON ACCURATE REPRESENTATION OF THE WORK,AND SHALL SUBMIT THE COMPLETE PACKAGE TO THE BOEING ENGINEER. SELECT BACKFILL ON TILL.NO FOUNDATION IS REQUIRED FOR DUST COLLECTOR OR BACKPRESSURE CHECK VALVE. <br /> ICI OCCUPANCY: SPECIAL INDUSTRIAL 11. SITE CONTRACTORS SHALL MAINTAIN AREAS UNDER CONSTRUCTION CLEAR OF DIRT AND DEBRIS,AND SHALL STORE <br /> o CONSTRUCTION TYPE: IIB <br /> ALLOWABLE AREA: NO CHANGE S H E ET I N D EX <br /> ALLOWABLE STORIES: NO CHANGE <br /> �I ALLOWABLE HEIGHT: NO CHANGE 40-053 Twin ARES Routers DAPP Cell Foundations Project <br /> // ` 1[Illl[I WASHINGTON ENERGY NO CHANGE IN THERMAL ENVELOPE <br /> f f �Ir CODE COMPLIANCE: GOb-COVER SHEET S562-GENERAL STRUCTURAL NOTES <br /> ITTDEFERRED SUBMITTALS: MECHANICAL AND ELECTRICAL A567-GENERAL ARRANGEMENT PLAN 1 S562-1 -STRUCTURAL SUPPORTS AND ANCHORS <br /> A567A-LAYOUT AND ELEVATIONS 1 S562-2-ELEVATION RENDERINGS <br /> SCALE:NONE <br /> N <br /> 13 Anthae360 <br /> SYM REVISION BY APPROVED DATE SYM RENSION BY APPROVED DALE RcbeRA.Marmetluke PE DaAVm DATE SUBTTLE CURRENT REVISION SYMBOL DATE E <br /> ACCEPTABILITY RAH 1� 3 COVER SHEET W9543149 05)28)24 <br /> THIS DESIGN uloioR CHECKED <br /> SPECIFICATION IS APPROVED CJR 1210903 SHEET <br /> ENGINEER TmE GOb <br /> DAPP Dust Collector Installation <br /> APPROVED BY DEPT, DATE CHECI�D <br /> APPROVED BUILDING 40-053 JOB NO. COMP W. <br /> WA PE CEM775 APPROVED ARCHITECTURAL MASTER COL.H.25/10.5 EVERETT,WA DWG no. 40-053-1301D <br />