Laserfiche WebLink
LEGEND <br /> 21-9 3/8" 5'-6 3/8" O SLAB TYPE(SEE NOTES) <br /> CJ CONTROL JOINT <br /> 4'-6 1/4" 4'-61/4" PB PIPE BOLLARD <br /> —6"x30":8"0 TRANSITION[8 PLs] SPRINKLER N N COUPLING, <br /> (DUCT OUTLET IS IN METRIC) <br /> 645EVN3.0 GENERAL NOTES <br /> FLAMELESS VENT <br /> PLATFORM PACK NEW TWIN DUST COLLECTOR INSTALLATIONS <br /> FILTER W LADDER, <br /> ---- ACCESS PAINTS SAFETY <br /> $" 10":8":11' 11°:S":12" 14°:8":16" � COVERS YELLOW <br /> CONSTRUCTION NOTES <br /> LU 5'-6" 31-711 16" 1. INSTALLATION OF TWO NEW DUST COLLECTORS WILL <br /> ~ 145.62 T w/ROCEED ONCE DAPP ROUTERS BOEING NOTICE O PROCEED ARE INSTALLED,THEN <br /> � 16" I 30 88 <br /> P 15.00 <br /> N �146' 16° W/ACOVER 2. OFFSET DIMENSIONS ARE PROPOSED CENTER-TO- <br /> NRV 2"NPT GRIDLINES,AND CENTER-CENTER DIMENSIONS ARE <br /> COUPLING <br /> PER CMS(R)LAYOUT'ARES MK2 36/26 APC1 PX5 IT-EN <br /> - BL39'PROVISIONAL LAYOUT. <br /> 44 8'-21/8" <br /> I <br /> 1 V-71/2" 4W 1/2" 7.71 REFERENCE DRAWINGS <br /> EALED DRUM COVER SDK, 22.21 t27.2^ <br /> r, INCLUDES 55 GALLON RUn TRACUSTOM NSITION 140-053-1201-A6 WIRE SHOP EXPANSION PARTIAL <br /> NEW LAYOUT FIRST FLOOR PLAN <br /> CMS(R) LAYOUT'ARES MK2 36/26 APC1 PX5 IT-EN <br /> COLLECTOR LAYOUT SCHEMATIC BL39'PROVISIONAL LAYOUT <br /> SCALE: NTS SCALE: NTS <br /> 10. _ <br /> EXT'G DEDICATED 4" DEDICATED 4"; EXT'G <br /> 4"FIRE FIRE FIRE <br /> 4"FIRE <br /> EXISTING EXISTING <br /> HVAC DUCT HVAC DUCT <br /> F,F, (SEE PLAN) (SEE PLAN)_ 2"SPRINKLER <br /> TRAPEZE SUPPORT <br /> SPAR BEAM-BEAM <br /> FLIGHT�-N r ++^:e^er d•.e�+a <br /> 141 ^ zts• SB.u' SPRINKLER _ to.d• zf c' SB.O" ~ aea' <br /> LATERAL o J DUCT SUPPORT <br /> —+ AND DROP —' SPRINKLER DROPSS <br /> Z <br /> 21'-5" <br /> O <br /> w 15'-11° <br /> M~J 0 20'-10" 4 z w o r r e r a <br /> J 0 n <br /> � �o PRINKLER DROPS <br /> O�NTROL PANELS 4 b b �\ <br /> z NOT SHOWN <br /> TSHOWN q DUCT FLOOR SUPPORT <br /> o FD LOCATE FI LD LOCATE [ ] 6.5 7 7.5 8 8.5 9 9.5 10 10.5 11 <br /> ^6"x30":8'O TRANSITION 8PL5 <br /> F.F. - (DUCT OUT OUTLET IS IN METRIC) <br /> IMF 54.3' Sd.3" 88.0' 51.3' S6J' 66.0" I I <br /> 55.5" 1395' 55S" <br /> 1A10 1A11 1Al2 <br /> DUST COLLECTOR 2 DUST COLLECTOR 1 ROUTER 1 ROUTER 2 <br /> 1A13 1A14 i 1A15 <br /> ELEVATION LOOKING EAST ELEVATION LOOKING WEST <br /> SCALE: NTS SCALE: NTS 1A16 1A17 G <br /> 1A19 1A20 1A21 <br /> I I <br /> K <br /> LAYOUT& ELEVATIONS KEY <br /> SCALENONBLDG.4053 N <br /> SCALE: 118"=V-0" <br /> 13Anthae360 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DALE RcbeRA.Marmetluke PE DRAVm DATE SUBTmE CURRENT REVISION SYMBOL DATE <br /> ACCEPTABILITY RAM +� 3 LAYOUT AND ELEVATIONS <br /> TRlsoeslcNu,oloR CHECKED N19543149 05128124 � <br /> SPECIFICATION IS APPROVED CJR 121090 SRBET <br /> A567A <br /> APPROVED <br /> APPROVED BY DEPT. DATE ENGINEER TIRE DAPP Dust Collectors Installation <br /> BUILDING 40-053 <br /> APPROVED JOB N0. COMP W. <br /> WA PE CEI6775 APPROVED ARCHITECTURAL MASTER COL.H.25110.5 EVERETT,INA Dwc no. 40-053-A567A <br />