Laserfiche WebLink
I � , <br /> I I I I I <br /> I I I I I <br /> --------------------------_1 88.0' 26.2' I I <br /> I <br /> 12,3' <br /> GENERAL CONSTRUCTION NOTES <br /> 1, The General Contractor shall provide building penetrations, roofing, and other REvlsloNs: <br /> construction needs for installation of system equipment, i i <br /> 2. The General Contractor shall be responsible for maintaining structural integrity and I O I <br /> provide required structural supports as required City of Everett. J <br /> 3. The General Contractor shall be responsible for other trades unless otherwise stated ------ i W <br /> by the conditions of the general contract with the project owner, M A 1 I <br /> EXHAUST SYSTEM NOTES I Q I 8 HV I I cation of structural supports <br /> 1. The exhaust/make-up air systems are to meet requirements of the International Mechanical Code, �-1 i EF-1 ; `- _ ____—_--__--_- <br /> -t - -- <br /> and NFPA-96. The Type I exhaust ductwork to be constructed of fully welded 16 gauge steel. -------------------------- > , 1 r alie air u�it <br /> Q 2. Exhaust must be a minimum of 10'-0' from any air intake, adjacent building, or adjoining property. I I 172,6' I 35.1' <br /> ^ 58.5' i I <br /> 3, Exhaust and make-up air systems must be electrically interconnected to be operated <br /> w simultaneously by a single on/off switch. <br /> w ELECTRICAL NOTES I Q I I I I <br /> 1, The electrical contractor shall provide and install interconnecting field wiring between the w I I I I <br /> zhood equipment control switches, and exhaust / make-up air system equipment contactors. I------------------------- I U <br /> 0 2. The electrical contractor shall Install exhaust fan and make-up air system motor relays I I I I I I J C) <br /> s and disconnect switches, <br /> N I I I I I I I z 3. The electrical contractor shall verify proper fan motor rotation. <br /> Q 00 <br /> I LU <br /> IMC 2018 SECTION 507.1.1 OPERATION. (PARTIAL) L__—_--__—__—__—__—__—__—__J L__—__—I__—__-1_—__—__------J ru Q <br /> 3 THE EXHAUST FAN SERVING A TYPE I HOOD SHALL HAVE AUTOMATIC CONTROLS THAT L--------------------------J :WILL ACTIVATE THE FAN WHEN ANY APPLIANCE THAT REQUIRES SUCH TYPE I HOOD <br /> P IS TURNED ON, OR A MEANS OF INTERLOCK SHALL BE PROVIDED THAT WILL PREVENT 114,2' ru \ <br /> z ❑PERATION OF SUCH APPLIANCES WHEN THE IS NOT TURNED ON.. o <br /> m L <br /> TYPE I EXHAUST AIR DUCTWORK TO BE MAKE-UP AIR DUCTWORK TO BE 3 7th STREET _ p Ln w <br /> FULLY WELDED 16 GAUGE STEEL FULLY SEALED 22 GAUGE STEEL <br /> o DUCTWORK TO BE CONTINUOUS INTERNAL MAKE—UP AIR DUCTWORK TO BE INSULATED <br /> r OR EXTERNAL LIQUID—TIGHT WELDED M <br /> SMOOTH, ACCESSIBLE FOR INSPECTION, <br /> AND WITHOUT GREASE TRAPS <br /> __ <br /> LOr--------------------------� r---- T--------� r--- <br /> I <br /> z <br /> o t <br /> z I I rn <br /> I <br /> FireMaster® FastWrap® XL __—__—__—__—__—__� I I <br /> w Grease and HVAC Duct Enclosure System I I I I I <br /> 1 or 2 Hour Shaft Alternative/Zero Clearance to Combustibles <br /> LEGEND TWO LAYER INSTALLATION(Grease Duct per ASTM E2336) <br /> 1 Two Layers of XL Insulation for ASTM E2336 and CAN/ULC 5144 Grease Ducl Enclosures u, ' o y <br /> 3 2 One Layer of XL Insulation for 2-Hour Air Ventilation Dud Enclosures Red Rock Subs ® � <br /> 6 " sana.ncn•;© NORTH V <br /> a 2 Steel banding minimum 1/2"(13)wide by 0.015"(0.4)thick. (�Here Rentals The Dog Spot O <br /> 3 Tight butt joints(no overlap)at perimeter and longitudinal joints,both layers for grease ducts Q SITE PLAN �; � f=7 co <br /> N1 4 Min.3"(75)overlap on perimeter and between adjacent blankets Q Q �, l <br /> 5 Optional 6"XL collar ® Brown Bear Car Wash n , rt U N <br /> t 6 Hangers-size dependent weight of assembly(see datasheet Section G) Z Sport Automotive Scale 1 =25-0 3: to <br /> �11 7 Trapeze Supports-size dependent on weight of assembly(see dafaCn <br /> sheet Section G) - Z O <br /> 8 Steel Rectangular or Round Duct(size,gage and construction dependent per Lis[ed Design) 361h 5t 361h St <br /> 6th 51 <br /> Lube o CID tv2^(3a) 3 Q ❑Umnaa T_orfar +.� 1CJ <br /> �ti6n o Work'n More-Everett <br /> 10111 A Q 0 <br /> y is P ` 1 ` 1 ` l 1 > co • Northwest 9 U CQ p <br /> Stadium Flowers o n Zoological Supply ^„„,. ¢ cc 4 <br /> 11� Butt Joint Typical 3 Inte rative Foot&Ankle "on. X " Panel Number D04;%i8 7901000 0 ~ P. <br /> Q g petty 3621 BROADWAYAVE,EVERETT:WA 98201 <br /> 7 Centers of Washington Y <br /> 8 ONE HOUR FIRE371n51 3 Brake v �Coi <br /> 37th St 37th St ell General Information <br /> r mn DNNen -- DRAWN BY: DOUG WALTER <br /> RATED DUCT WRAP Scale <br /> mane Supply North Everett Gospel Mission EVERETT DIY E PLAT OF BLK 879 D 00-LOTS 10-16 TGW SINES J 5 ACRE TRACTS BLK 009—TH <br /> Not to Scale IHOP Cummins sales TNWOFALLEYDAF:BEGSECORLOT9 BLK 879PLATOFEVERETTDIVE THE TOWBDYOF <br /> AEnjoy Dearer a v UPDATE: 04/11/2024 <br /> at,N�Tway n and Service 3 Evergreen Movf Description ALLEY TH NALG SAID W BDYI2.SOFT TH W PLW 5 LN SD LOT 9 TO E BDY SD LOT TH S ALG SD E <br /> " Systems,IncBOY TO POR ALSO TGW SINES J S ACRE TRACTS BLK 009-N SOFT OF S 175FT BLK 9 W OF ALLEY <br /> Concentra Urgent Care $ AND <br /> TGW SBMS J SACRE TRACTS BLK 009-THN 75FTOF S 125FTBLK 9 W OF ALLEY TGW SINES <br /> Additional Permits Are Required 0 Q S ACRE TRACTS BLK 009-S SOFT OF THAT PARTBL.K 9 W OF ALLEY <br /> q THIS SET OF Ken Griff Jr1st O C-90dy and and Improvements TITLE: <br /> eY r Ewing Outdoor Supply $tIIn,s Active,Host OtherPmperty,LacallyAssesaal,Pending Yalue C6aoge <br /> For This Project To Include: DRAWINGS SHALL BE Professional Home Run Lanaacap:gbappMnorc COMMERCIAL KITCHEN <br /> ON JOB SITE AT ALL 38mst 0 T_CodaAma iOD010 EXHAUST SYSTEM <br /> Plumbing TIMES VICINITY MAP NORTH <br /> Sprinkler APPROVED <br /> ❑ Mechanical ❑ Fire Alarm L City of Everett Permit Review Offic"fc—m-Ity,Planning&Economic Development SHEET INDEX <br /> PLANNING DEPARTMENT SHEET I VICINITY MAP, SITE PLAN, LEGAL INFORMATION & NOTES SHEET: <br /> ® Electrical EVEREir Status:Reviewed for Permit NAME: essicalarvi Not t0 Scale SHEET 2 PLAN VIEW, EQUIPMENT SCHEDULE, SECTION, ELEVATION <br /> �� Status: <br /> Reviewed <br /> DATE: 0ssicaJ024 SHEET 3 CAPTIVE AIRE EQUIPMENT INFORMATION M 1 <br /> SHEET 4 CAPTIVE AIRE EQUIPMENT INFORMATION <br /> SHEETS 5-10 S-1 TO S-6 STRUCTURAL CALCULATIONS <br />