Laserfiche WebLink
SHEET INDEX <br /> DWG NO. REV. NO. SHEET NO. SHEET NAME <br /> TITLE <br /> T1.01 0 1 ITITLE SHEET <br /> GENERAL <br /> G1.01 2 2 2 SHEET INDEX <br /> 31.02 0 3 GENERAL SYMBOLS <br /> 31.03 0 4 GENERAL ABBREVIATIONS <br /> 31.04 0 5 OVERALL SITE PLAN <br /> 31.05 0 6 PROJECT PHASING PLAN <br /> SITE PREP/GEOTECHNICAL <br /> D1.01 0 7 EXISTING CONDITIONS AND DEMOLITION PLAN - WEST <br /> D1.02 0 8 EXISTING CONDITIONS AND DEMOLITION PLAN - EAST <br /> D1.03 0 9 EXISTING CONDITIONS AND DEMOLITION PLAN - NORTH <br /> D1.04 2 1 10 TEMPORARY EROSION AND SEDIMENT CONTROL <br /> D1.05 A 1 11 SURCHARGE PLAN AND PROFILE <br /> CIVIL <br /> C1.01 0 12 SITE PLAN - WEST <br /> C1.02 0 13 SITE PLAN - EAST <br /> C1.03 0 14 SITE PLAN - NORTH <br /> C1.04 0 15 CIVIL DETAILS <br /> MECHANICAL <br /> MO.01 0 16 MECHANICAL LEGEND, DRAWING INDEX, AND ABBREVIATIONS <br /> M1.01 0 17 MARINA FUEL SYSTEMS SITE PLAN - WEST <br /> M1.02 0 18 MARINA FUEL SYSTEMS SITE PLAN - EAST <br /> 3 M1.03 0 19 MARINA FUEL SYSTEMS SITE PLAN - FUEL DOCK <br /> M1.04 0 20 MARINA GASOLINE FUEL SYSTEM CONTROLS <br /> 0 <br /> M1.05 0 21 MARINA DIESEL FUEL SYSTEM CONTROLS <br /> o M1.06 0 22 FUEL STORAGE TANK DETAILS <br /> I <br /> N M1.07 0 23 FUEL STORAGE TANK DETAILS <br /> 0 <br /> M1.08 0 24 FUEL STORAGE TANK DETAILS <br /> a M1.09 0 25 MECHANICAL DETAILS <br /> M1.10 0 26 MECHANICAL SCHEDULES <br /> N <br /> o ELECTRICAL <br /> > EO.00 0 27 PROJECT NOTES, LEGEND, AND ABBREVIATIONS <br /> w <br /> E1.00 0 28 SINGLE LINE WIRING DIAGRAM & SCHEDULE <br /> E2.01 0 29 ELECTRICAL SITE PLAN - WEST <br /> a E2.02 0 30 ELECTRICAL SITE PLAN - EAST <br /> E3.00 0 31 ELECTRICAL DETAILS & SPECIFICATIONS <br /> w <br /> n <br /> ca <br /> z <br /> 0 <br /> w <br /> w <br /> z <br /> z <br /> z <br /> w <br /> 0 <br /> z <br /> O <br /> F <br /> U <br /> O <br /> J <br /> W <br /> K <br /> z <br /> Z <br /> Q <br /> H <br /> J <br /> DIGITAL SIGNATURE: <br /> 0 <br /> THIS DRAWING SET WAS CREATED AS AN ELECTRONIC <br /> w DOCUMENT. IF THE ELECTRONIC DOCUMENT DOES NOT <br /> o INCLUDE A VERIFIABLE DIGITAL SIGNATURE IN THE BOX <br /> ABOVE, PLEASE CONTACT THE ENGINEER OF RECORD ` City of Everett <br /> FOR THE ORIGINAL CERTIFIED ELECTRONIC DOCUMENT. <br /> EVERETT Reviewed for Permit 09/27/2022 <br /> N IF THIS DRAWING IS NOT 22"x34" SCALE ACCORDINGLY. <br /> PROJECT ENGINEER: SCALE: PORT OF EVERETT DWG. N0. <br /> PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY 6RUc J. KEISER NOTED G1.U1 <br /> Port 1?/ <br /> PROGRAMS,METHODS OR PROCEDURES OF OPERATION, OR THE cwnsx��F <br /> Z a ■i 1131 F,-A--S.S,rreA CONSTRUCTION THE DESIGN OWNGONNT ESE DRAWINGS. ��� D SIGNED BY: MAY 2022 WATERFRONT E R F R 0 N T PLACE CENTRAL CIP N0. <br /> o s ® ® �'m 2-o-oss-o1 <br /> EVER TT s�de,W� °°98134 8/4/22 JBK REV 1 - PERMIT REVISIONS THE sPEGIFIDATIDNs SHALL CONFORM TO STANDARDS OF 9 MARINA FUEL TANK REPLACEMENT <br /> P:206.624.1387 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY W DRAWN BY: CHECKED BY: <br /> a N ENGINEERS,INC. www.p°dengiaeess.com 01 6/21/22 JBK ADDENDUM 2 AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN �`�qF°35789p0 �2 G. DEAN C. CASTONA PROJECT <br /> APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED S G MCR-CM-2022-01 <br /> �z P.O.BOX 538 NO. <br /> E� APPROVED BY: NO. <br /> a EVERETT,WA 98206 5/31/22 JBK ISSUED FOR BID IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT <br /> (425)259-3164 DIRECTLY OR INDIRECTLY TO PND. <br /> N°. DATE BY REVISION s/� SHEET INDEX SHEEP N0. 2 OF 31 <br />