Laserfiche WebLink
CIVIL SYMBOLS STRUCTURAL SYMBOLS <br /> SURVEY UTILITY SURFACE & LANDSCAPING GENERAL CONCRETE <br /> II 1 <br /> SYMBOL DESCRIPTION (ABBR) SYMBOL DESCRIPTION (ABBR SYMBOL DESCRIPTION GRD LNE MARKER FOOTING TYPE AND <br /> ) SYMBOL DESCRIPTION (ABBR) BOTTOM ELEVATION <br /> THEOR./ FOUND/ EXIST. PROP. PROP. PROP. EXIST. P�ROyP. GRID LINE (440'-0") <br /> EXIST. PROP. 7 7 CAP/PLUG NA EMBANKMENT <br /> --X-X <br /> p o o GUARD POST FIRE RIP RAP � O � SSOIL SUBGRADE NA STUD CONCRETE OVER STEEL <br /> ANGLE POINT <br /> BENCH MARK �' G REDUCER ' / FLOOR DECK—LONGITUDINAL <br /> REBAR/IRON PIPE THRUST BLOCK HEDGE GRAVEL <br /> ® ® WATER METER —E°—Ea— 4" FIRE LINE X—X CONCRETE OVER STEEL <br /> ® ® MONUMENT IN CASE —Es—Es— 6" FIRE LINE LD—HEDGE FLOOR DECK—TRANSVERSE <br /> ( ) q •( FIRE HYDRANT WWF <br /> ® ® MONUMENT (SURFACE) ' �° AIR RELIEF FDC FIRE DEPARTMENT CONNECTION Q SHRUB CURB/ <br /> OPENING IN FLOOR OR WALL <br /> 0 0 FIRE HOSE CONNECTION LD—SHRUB PARTIAL THEIGHT WALL <br /> TAX LOT / PARCEL # TREE (Conifer) <br /> ti ti OWNERSHIP TIE x x BLOW—OFF O FIRE EXTINGUISHER & LD—TR—C(L,M OR S) XX.XX MATCHLINE <br /> oa oa GATE VALVE (X=UTILITY) LIFE RING CABINETS MATCHLINE CONCRETE WALL <br /> x ELEV x ELEV SPOT ELEVATION P.R.V. TREE (Deciduous) — — REFERENCE LINE, EXISTING OR <br /> WATER LD—TR—D(L,M OR S) ARCHITECTURAL ELEMENTS CONCRETE WALL <br /> XX.XX MATCHLINE PAD MOUNTED �————— BELOW THIS LEVEL <br /> MATCHLINE TRANSFORMER —w—w— WATER MAIN YARD OR STREET LIGHT A <br /> SECTION DATA: UTILITY VAULT ® WATER PEDESTAL 0 LT—YDLIT - DIMENSION PER ARCHITECT � EDGE OF CONCRETE <br /> SEE BORING SOIL BORING CONCRETE COLUMN <br /> SECTION CENTER ® ® TRANSMISSION H VALVE 10 PLAN SF—BORNG M/E DIMENSION PER MECHANICAL <br /> 01 TOWER rt FIRE HYDRANT OR ELECTRICAL <br /> SECTION CORNER r__1 CONCRETE COLUMN <br /> 0 o UTILITY POLE SEWER CHANNELIZATION EL 43'-6" TOP OF STRUCTURE ELEVATION LJ BELOW THIS LEVEL <br /> coo cow QUARTER CORNER -6- UTILITY POLE W/RISER T/ (TOP OF ELEMENT INDICATED) CHANGE OF SLAB <br /> E— E— UTILITY POLE ANCHOR s s SEWER LINE SYMBOL DESCRIPTION THICKNESS <br /> ® ® SIXTEENTH CORNER UTILITY POLE SIDEWALK 0° DUMP STATION EXIST. PROP. —14j"] ELEVATION POINT <br /> CLOSING CORNER ANCHOR O SEWER PUMP (TOP OF ELEMENT INDICATED) RAISED SLAB <br /> STREET LIGHT ASSEMBLY O SEWER HOSE RACK ( DISABLED SYMBOL W PC-1 PILE CAP IDENTIFICATION <br /> P <br /> MC MC MEANDER CORNER ,fq �g TELEPHONE RISER ♦ SEWER CONNECTION SP—HANDY WORKPOINT <br /> 0 o SAN. SEWER CLEAN OUT STORM Flll�l7 �111�IJ STOP LEGEND DIRECTION OF SPAN <br /> NORTH SD MANHOLE TYPE 1 —SD—SD— STORM DRAIN CCJIu a CC11u a SP—STOP <br /> �D �D LIMIT OF SPAN <br /> SD MANHOLE TYPE 2 11 EXISTING CATCH BASIN <br /> SH—DATUM <br /> ® ® CATCHBASIN 0 PROPOSED CATCH BASIN SLOPE <br /> SCALE IN FEET @ 0 CATCHBASIN TYPE 2 )— OUTFALL <br /> OO SURFACE — SLOPE UP <br /> STORM DRAIN INLET <br /> 20 0 20 40 STORM DRAIN CULVERT TRENCH DRAIN TYPE 1 <br /> CW_ —CW— COLD WATER LINE ® TRENCH DRAIN TYPE 2 SURFACE — SLOPE DOWN <br /> S <br /> —F —F FIRE LINE <br /> o FM FM FORCE MAIN e TRENCH DRAIN TYPE 3 ilTrlr SURFACE — SLOPE TWO WAYS <br /> o _SS_ —SS— SANITARY SEWER LINE <br /> 5 —SD— —SO— STORM DRAIN LINE OTHER ��rd SURFACE — STEPPED <br /> o COI • SANITARY SEWER CLEANOUT .17777 <br /> V\ <br /> UTILITY STATION(CONSISTS <br /> FIRE DEPARTMENT CONNECTION ® OF ONE WATER PEDESTAL & <br /> o DS SURFACE — STEPPED & SLOPED <br /> o DOWNSPOUT ONE ELECTRICAL PEDESTAL) <br /> a p ELECTRICAL X— FENCE <br /> PEDESTAL <br /> i <br /> m � PROJECT LIMITS <br /> —R/W— RIGHT—OF—WAY <br /> 0 <br /> o •••••••• LIMITS OF FILL <br /> rn <br /> TITLES TEXT STEEL FASTENERS <br /> a <br /> SECTION/ELEVATION LETTER PLAN SECTION <br /> w PLAN TITLE OR DETAIL/VIEW NUMBER--\,,, SHEET NUMBER WHERE DRAWN & ANDSE, DIAMETER BEAM/GIRDER <br /> SCALE: 1 8' = 1'-0" + t CONCRETE ANCHOR BOLT <br /> 3 / SEE 1/S21 FOR INDICATES DIRECTION FEET, MINUTES <br /> z .. 1� STEEL IN CROSS SECTION <br /> w ADDITIONAL INFO OF CUTTING PLANE INCHES, SECONDS + t DRILLED IN CONCRETE ANCHOR <br /> i TEXT NOTATION LETTER INDICATES DEGREE <br /> o A SECTION/ELEVATION TITLE SECTION OR ELEVATION ° AT + $ BOLT <br /> F CENTERLINE <br /> SCALE: 3/4" = 1'-0" S <br /> o \ S3.2 R NUMTBER + T NAIL <br /> Y / 1 SHEET NUMBER WHERE % PERCENT <br /> Z 1 DETAIL/VIEW TITLE <br /> SCALE: 3/4" = 1'-0" SECTION SECTION Is sFowN <br /> S2.1 E <br /> 52.1 NUMBER INDICATES <br /> 2 DETAIL OR VIEW <br /> 52.2 <br /> ELEVATION SHEET NUMBER WHERE <br /> s SECTION/ELEVATION/DETAIL/VIEW LABELS DETAIL DETAIL/FLFVATON IS SHOWN <br /> N <br /> SECTION/ELEVATION/DETAIL/VIEW IDENTIFIERS ` City of Everett <br /> EVERETT Reviewed for Permit 09/27/2022 <br /> a IF THIS DRAWING IS NOT 22"x34" SCALE ACCORDINGLY. <br /> N <br /> PROJECT ENGINEER: SCALE: PORT OF EVERETT DWG. NO. <br /> BIND ENGINEERS,INC. IS NOT RESPONSIBLE FOR SAFETY J. KEISER NOTED G1.�2 <br /> ^ PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE gyp,oBRUCF <br /> /j CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS. i DESIGNED BY: DATE <br /> w v at O✓ 1736 Fo hAvenue 5.Svne A WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED DDT, �`�ry sH, �s� C. WEST MAY 2022 WATERFRONT PLACE CENTRAL CIP N0. <br /> ® Seattle,W.hingwn 98134 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF ' 2-0-069-01 <br /> d E ERETT P:206.624.1387 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY <br /> v RAWN BY CHECKED BY: MARINA FUEL TANK REPLACEMENT <br /> N^ ENGINEERS,INC. —pndengi—.com AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN PF 32789 00 ��' G. DEAN C. CASTONA PROJECT <br /> �o P.O.BOX 538 APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED 6S, IT" G� GENERAL SYMBOLS NO. MCR-CM-2022-01 <br /> M j EVERETT,53 98206 QO 5/31/22 JBK ISSUED FOR BID IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT S/ONAL 0� APPROVED BY: <br /> (425)259-3164 DIRECTLY OR INDIRECTLY TO BIND. 5�3i�� <br /> No. DATE BY REVISIONSHEET NO. 3 OF 31 <br />