Laserfiche WebLink
1. Lift Location: Use architects plan when available 4. Latch Cable Guides: Install the latch cable conduit <br /> to locate lift. Fig. 1 a,Fig. 1b,Fig. 1 c,Fig. 1d,shows guide brackets to column extensions with (1) 1/4"-20NC x <br /> dimensions of a typical bay layout. 1" HHCS and 1/4"-20NC Flanged Locknuts,Fig.2b. HHCS <br /> should go through hole nearest the edge as shown,Fig.2b. <br /> 2. Lift Height: See Fig.3 for overall lift height of each <br /> specific lift model. Add 1" min.to overall height to lowest 5. Overhead Mounting Bracket: Install Mounting <br /> obstruction. Brackets to column extensions as shown,Fig.3. <br /> A WARNING 6. Lift Setting: Position columns in bay using dimensions <br /> DO NOT install this lift in a pit or shown in Fig. la &Fig. lb. Place column with power unit <br /> depression due to fire or explosion risks. mounting bracket on vehicle passenger side of lift. Both <br /> column base plate backs must be square on center line <br /> 3. Column Extensions: Before standing columns upright, of lift. Notches are cut into each base plate to indicate <br /> install the column extensions using (12)3/8"-16NC x 3/4" center line of lift. Use appropriate equipment to raise <br /> Carriage HHCS and Flanged Locknuts, Fig.3,Fig.2a,2c, carriage to first latch position. Be sure locking latch is <br /> and 2d. securely engaged. <br /> Fig.3 Overhead Assembly • <br /> Mounting —El <br /> Bracket — _-.3) <br /> \\ f 3-- 6o3810mm) <br /> Top of Cylinder <br /> a 0 `—' 71"rise lifts <br /> 11' 8"(3556mm) ' �—e <br /> ---- 6 Q Q <br /> Top of Overhead ��� <br /> 1f 12' 0"(3658mm) <br /> Assembly(std.) / <br /> Top of Cylinder <br /> 11' 4"(3454mm) 3/8"-16NC x 3/4"HHCS O 0 68"rise lifts <br /> Top of Overhead &Flanged Locknut <br /> e Assbl m <br /> Y 00 <br /> (Low Ceiling) <br /> • <br /> PI <br /> Use(4)3/8"-16NC x 3/4" <br /> Carriage Bolts and ,.. <br /> • Flanged Locknuts in ° <br /> front and(2)in the back <br /> •tea.,.I <br /> \ '1 /12 <br />