Laserfiche WebLink
• <br /> A. Owner Responsibilities <br /> The owner or the design professional in responsible charge acting as the owner's agent,shall fund special inspection <br /> services.The owner is responsible for seeing that these requirements are met. <br /> I have read and understand my responsibilities regarding special inspections. <br /> Owner/Agent: RAG Everett LLC By:Brian Fisher Date: 6/19/2024 <br /> B. Registered Design Professional Responsibilities <br /> 1. The registered design professional in responsible charge(engineer, or architect),shall include special inspection <br /> requirements and specifications on the plans. <br /> 2. Provide structural observation where required per IBC Section 1704.6. <br /> 3. Prepare the Statement of Special Inspections in accordance with IBC section 1704.3 and identify Structural Testing <br /> for Seismic Resistance per IBC section 1704.3.2(When required).The statement of special inspections shall <br /> identify items fabricated on the premises of an approved fabricator where special inspections are not required by <br /> section 1704.2.5. <br /> 4. Review the special inspection reports and provide corrective action for work that may not conform to the <br /> approved plans. <br /> I have read and understand my responsibilities regarding special inspections. <br /> Registered Design <br /> Professional <br /> in <br /> Resp.Charge: Quantum Consulting Engineers By: John H Riley Date: 6/6/2024 <br /> Structural <br /> Engineer <br /> of Record: Quantum Consulting Engineers By:John H Riley Date: 6/6/2024 <br /> C. Contractor's Responsibilities <br /> 1. Notify the agency: <br /> The contractor is responsible for notifying the inspection agency in sufficient time for scheduling personnel to <br /> perform required inspections. <br /> 2. Written statement of responsibility: <br /> Contractor shall complete this form to satisfy IBC 1704.4 Contractor responsibility for construction of designated <br /> main-wind or seismic force resisting system.Additional information shall be provided where requested by the <br /> jurisdiction. <br /> 3. Provide access to Jurisdiction approved plans: <br /> The approved plans shall be readily accessible at the job site. <br /> 4. Provide access to work: <br /> The contractor shall provide reasonable access to all work requiring special inspection. <br /> 5. Retaining special inspection reports at the job site: <br /> The contractor is also responsible for retaining at the job site all special inspection records submitted by the <br /> special inspector and providing these records for review by the Building Department's inspector upon request. <br /> 6. Notify Jurisdiction of special inspections prior to scheduled inspection time. <br /> 7. Provide a copy of special inspector's credentials when requested by the jurisdiction. <br /> I have read and understand my responsibilities regarding special inspections. <br /> Contractor: Vehicle Equipment Solutions By: Mike Kenny Date: 6/19/24 <br /> GENERAL INFORMATION: <br /> •Obtain a building permit before starting construction. Page 6 of 8 <br /> •This construction bulletin is intended to provide guidelines and a checklist of some special inspections that may be required per 2021 IBC. <br />