Laserfiche WebLink
SHEET NOTES - PLUMBING: <br />A. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES IN EXISTING CONDITIONS. <br />B. ALL FIRE PROTECTION WORK SHALL BE DONE IN ACCORDANCE WITH NFPA 13 AND LOCAL <br />CODES. <br />C. RELOCATE EXISTING FIRE SPRINKLER HEADS INTO CEILING GRID AS PERMITTED BY NFPA 13 <br />6.2.1.1. FIRE SPRINKLER HEADS ARE PERMITTED TO BE RELOCATED IF THEY ARE ATTACHED <br />TO THEIR ORIGINAL FITTING OR WELDED OUTLET; THIS INCLUDES FLEXIBLE HOSES. FIRE <br />PROTECTION CONTRACTOR TO PROVIDE PIPING, FITTINGS, AND NEW SPRINKLER HEADS AS <br />NECESSARY. EQUIPMENT TO MATCH EXISTING BUILDING STANDARD. FIRE PROTECTION <br />CONTRACTOR TO VERIFY FIRE SPRINKLER HEAD LOCATION WITH ARCHITECT, FURNITURE, <br />LIGHTING AND HVAC EQUIPMENT. FIRE SPRINKLER HEADS GENERALLY TO BE LOCATED IN <br />CENTER OF CEILING TILE. <br />D. ALL SPRINKLER HEADS SHALL MATCH EXISTING BUILDING STANDARD. <br />KEYNOTES <br />1 CONNECT NEW 3/4" CW PIPING TO EXISTING CW PIPING OF EQUAL OR LARGER SIZE. PROVIDE <br />ISOLATION VALVE AT POINT OF CONNECTION. CONTRACTOR SHALL FIELD VERIFY EXACT POINT OF <br />CONNECTION. <br />2 PROVIDE 1/2" CW PIPING DOWN IN WALL TO NEW OUTLET BOX, OB-#, FOR CONNECTION TO <br />REFRIGERATOR. COORDINATE OUTLET BOX ELEVATION AND FINAL PIPING FROM OUTLET BOX TO <br />APPLIANCE WITH ARCHITECT. REFER TO PLUMBING FIXTURE AND EQUIPMENT SCHEDULE FOR <br />MORE INFORMATION. <br />3 PROVIDE NEW SUSPENDED ELECTRIC WATER HEATER, EWH-#. REFER TO WATER HEATER DETAIL <br />AND SCHEDULE FOR MORE INFORMATION. <br />4 PROVIDE 1/2" HW PIPING DOWN IN WALL TO OUTLET BOX, OB-#, FOR CONNECTION TO DISHWASHER. <br />ROUTE DRAIN FROM DISHWASHER TO DISHWASHER DRAIN CONNECTION AT GARBAGE DISPOSAL. <br />COORDINATE OUTLET BOX ELEVATION WITH ARCHITECT. REFER TO DISHWASHER/GARBAGE <br />DISPOSAL CONNECTION DETAIL AND PLUMBING FIXTURE AND EQUIPMENT SCHEDULE FOR MORE <br />INFORMATION. <br />5 PROVIDE OUTLET BOX, OB-#, FOR WATER HEATER DRAIN AND CONDENSATE DRAINS FROM FAN <br />COIL UNITS. REFER TO PLUMBING FIXTURE AND EQUIPMENT SCHEDULE FOR MORE INFORMATION. <br />6 ROUTE 1/2" CW AND HW PIPING DOWN IN WALL TO SERVE SINK, SK-#. INSTALL GARBAGE DISPOSAL, <br />GD-#, IN CONJUNCTION WITH SINK. REFER TO MIXING VALVE DETAIL AND PLUMBING FIXTURE AND <br />EQUIPMENT SCHEDULE FOR MORE INFORMATION. <br />7 PROVIDE 3/4" CONDENSATE DRAIN PIPING FROM FAN COIL UNIT IN ACCORDANCE WITH <br />MANUFACTURER'S INSTRUCTIONS. TYPICAL. <br />B ROUTE COMBINED 1" CONDENSATE DRAIN PIPING TO OUTLET BOX OB-2 IN BREAK ROOM. <br />TERMINATE WITH MINIMUM 1" AIR GAP FITTING. <br />9 ROUTE 3/4" CONDENSATE DRAIN PIPING FROM BRANCH CONTROLLER AS INDICATED. CONNECT TO <br />BRANCH CONTROLLER IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. <br />10 CONTRACTOR SHALL PROVIDE SUBMETER FOR CW PIPING SERVING SUITE. COORDINATE WITH <br />LANDLORD REGARDING SPECIFICATION FOR SUBMETER. <br />�� PLUMBING PLAN <br />114" = V-0" <br />NC Rj � <br />�I,blc LAWRENCE <br />GROUP <br />St. Louis <br />319 North 4th Street <br />Suite 1000 <br />St. Louis, Missouri 63102 <br />(314)231-5700 <br />cErvT. Be Date-ined <br />PROHESSIONAL �`cwe <br />.IMEG <br />MEG <br />7600 E Orchard Road, Suite 250-S <br />Greenwood Village, CO 80111 <br />Phone: 303.796.6000 <br />IMEG Project No: 24000280.07 <br />C I <br />e <br />:apS GI}T FE�V?� <br />ONAL' N <br />oe.al.a�ay <br />h44Ol• 10•l-0%d <br />LU <br />W <br />00 <br />O <br />� <br />LL <br />U N <br />mW <br />m o� <br />mle�l�aa <br />Imnvmrs�on pare aawitlg�orma Y <br />liaMng aM Miaib on it are iM1e sde DroDery W Ne <br />may Ee=d-L Ixb apecifc Droted only. <br />mpied a reproducetl, In wMb or <br />rent oNerpuryaae or poledwHMul Me <br />N, Deacripibn Data <br />1 Revision 1 Date 1 <br />2 FOR CONSTRUCTION 07/11/2024 <br />3 1 MECH PERMIT 07/24/2024 <br />PLUMBING PLAN <br />Pged NaeEx'. abp11- <br />2024906.011 <br />0rewn ar <br />MSK <br />Iwie one: <br />MARCH 27. 2024 pill <br />