My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10521 19TH AVE SE EDWARD JONES 2025-10-27
>
Address Records
>
19TH AVE SE
>
10521
>
EDWARD JONES
>
10521 19TH AVE SE EDWARD JONES 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:17:17 AM
Creation date
12/12/2024 10:10:31 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10521
Tenant Name
EDWARD JONES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett, WA <br />August 21, 2024 <br />IMEG #24000280.11 <br />Page 4 of 4 <br />g. Page 13 and Duct insulation schedule on M4 — Please revise R-values. Duct insulation <br />requirements have increased in the 2021 code. Please reference table C403.10.1.1. <br />IMEG Response: Table C403.10.1.1 is for outdoor air only. Per response to comment 9e <br />above, the Ductwork Insulation Schedule has been revised to include outdoor air <br />ductwork shall be insulated with minimum R-7 insulation in accordance with Table <br />C403.10.1.1. Note that the outside air ductwork for this project is inside the conditioned <br />space and conveys less than 2800 CFM. Table C403.10.1.2 covers supply, return, <br />exhaust and relief air ductwork insulation. The ductwork for this project would fall within <br />the category of providing air that is less than 55OF or greater than 105°F, as there may be <br />times where the discharge air temperature from the fan coil units meets these values, <br />and therefore the required ductwork insulation would be R-3.3. The ductwork insulation <br />indicated for supply and return is R-6 which exceeds this requirement. <br />h. Page 14 of 25 — see 9d above. <br />IMEG Response: Refer to response for comment 9d above. <br />10. Energy code mechanical requirements Sheet M12 <br />IMEG Response: Note that with the addition of the commissioning specifications, this <br />sheet is now sheet M13. <br />a. Pages 24 and 25 — Commissioning is required. Please revise these pages indicating <br />where Commissioning requirements are called out on plans. <br />IMEG Response: Commissioning requirements have been added to the specifications. <br />Refer to revised drawings M7, M8 and M9. <br />Please call if you have any questions or comments. <br />Sincerely,, <br />1,111ZI <br />ABN/jac <br />\\filesWctive\Projects\2024\24000280.11\Correspondence\20240815 Permit Comments\20240815 Edward Jones_EverettWA_Permit Comments—IMEG Response.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.