City of Everett, WA <br />August 21, 2024 <br />IMEG #24000280.11 <br />Page 4 of 4 <br />g. Page 13 and Duct insulation schedule on M4 — Please revise R-values. Duct insulation <br />requirements have increased in the 2021 code. Please reference table C403.10.1.1. <br />IMEG Response: Table C403.10.1.1 is for outdoor air only. Per response to comment 9e <br />above, the Ductwork Insulation Schedule has been revised to include outdoor air <br />ductwork shall be insulated with minimum R-7 insulation in accordance with Table <br />C403.10.1.1. Note that the outside air ductwork for this project is inside the conditioned <br />space and conveys less than 2800 CFM. Table C403.10.1.2 covers supply, return, <br />exhaust and relief air ductwork insulation. The ductwork for this project would fall within <br />the category of providing air that is less than 55OF or greater than 105°F, as there may be <br />times where the discharge air temperature from the fan coil units meets these values, <br />and therefore the required ductwork insulation would be R-3.3. The ductwork insulation <br />indicated for supply and return is R-6 which exceeds this requirement. <br />h. Page 14 of 25 — see 9d above. <br />IMEG Response: Refer to response for comment 9d above. <br />10. Energy code mechanical requirements Sheet M12 <br />IMEG Response: Note that with the addition of the commissioning specifications, this <br />sheet is now sheet M13. <br />a. Pages 24 and 25 — Commissioning is required. Please revise these pages indicating <br />where Commissioning requirements are called out on plans. <br />IMEG Response: Commissioning requirements have been added to the specifications. <br />Refer to revised drawings M7, M8 and M9. <br />Please call if you have any questions or comments. <br />Sincerely,, <br />1,111ZI <br />ABN/jac <br />\\filesWctive\Projects\2024\24000280.11\Correspondence\20240815 Permit Comments\20240815 Edward Jones_EverettWA_Permit Comments—IMEG Response.docx <br />