Laserfiche WebLink
B. Commissionin work shall be a team effort to ensure that all HVAC equipment and <br />9qq <br />B. The ca reserves the right to question the appropriateness iand ualifications ofthe <br />A. Insulated Flexible Duct: UL 181 Class 1 aluminum laminate and ester film with <br />polyester <br />k. Weight and dimensions. <br />9 <br />Y P Y property Y 9 Y to <br />system have been completely and t system <br />installed function together shall <br />meet the design intent, and document system performance. Commissioning shall <br />-item ct equipment, s stem and/,,abet stem. <br />PersoY Y <br />noel relative Portion <br />Qualifcatlons of personnel shall Inclutle expert knowledge relative to the specific <br />pve su ceded r r-bannll wound s -steel wire'fibrous- lass <br />PP Y Y Prin9 9 <br />insulation; <br />msulation; polyethylene vapor -barrier film. <br />I. Control options. <br />coordinate system documentation, equipment start-up, and performance testing. <br />equipment involved and a willingness to work with the ca. Contractor shall provide <br />adequate documentation and tools to star) -up and test the equipment, system, antl/,, <br />1. Pressure Rating. 10-inch wg positive and 1.0-Inch wg negative. <br />C. Operating and Maintenance Data: <br />C. The commissioning agent (ca) shall have responsibility for coordinating and directing <br />sub -system. <br />1. Manufacturer's complete standard instruction for each unit of equipment and <br />each step of the commissioning process. <br />2. Maximum Air Velocity: 4000 fpm. <br />control panel. <br />D. Commissioning work of division 23 shall include, but not be limited to: <br />5,3 DEFICIENCY RESOLUTION <br />3. Temperature Range: Minus 20 to plus 210 deg F. <br />2. Custom -prepared system operation, troubleshooting, and maintenance <br />In some systems, maladjustments, misapplied equipment, antllor deficient performance under varying <br />4. Insulation R-value: R-6 minimum Installed performance (1-5/8 Inch minlmum <br />instructions and recommendations, <br />1. Testing and start-up of the equipment. <br />loads will result in additional Work being required to commission the systems. This work shall be <br />thickness). <br />2. Testing, adjusting and balancing of air and water systems. <br />completed p quipm <br />under the direction of the owner, with input from the contractor, equipment enrol and ca. <br />3. Identification of replaceable parts and local source of supply. <br />ou <br />Whereas all members shall have input and the opportunity to discuss, debate, and work out problems, <br />B. Flexible Dud Connectors: <br />D. VRF Piping Layout Drawings. <br />3. Cooperation with the ca. <br />the owner shall have final jurisdiction over any additional work done to achieve performance. <br />1. Clamps: Stainless -steel band with cadmium -plated hex screw to tighten band <br />4. Provitlin qualified I for Participation in commissioning tests. <br />g qua personnel pa p g <br />with a worm -gear action In sizes 3 through 18 inches, to Sall duct size. <br />1. VRF piping layout drawings a11/8"-1'0" minimum scale <br />following <br />A. Corrective work shall be completed in timely fashion to permit the completion of the <br />plate with the <br />complete with information: <br />S. Completion of ca witnessed functional testing. <br />i <br />ning process. p system pe y <br />commissioning Experimentation to demonstrates tam Performance may <br />2.15 GRILLES, REGISTERS AND DIFFUSERS <br />e. Actual tin fittin hen <br />pipe routing, fittings, gar and support types, accessories, etc. with <br />6. Provitlin t, materials, and labor as necessa to correct construction <br />9equ�P <br />be permitted. If the on deems the experimentation work to be ineffective or untimely <br />quiremen gri g <br />A. Refer to schedule for requirement, for Iles, re islers and diffusers. <br />lengths and refrigerant charge noted. <br />antllor equipment found tlurin the Comm sionin <br />equipmen g g process, <br />as it relates to the commissioning process, the ce shall notify the owner, indicating <br />the nature of the problem, expected steps to be taken, and suggested deadlines) for <br />PART 3. EXECUTION <br />b. Include insulation thickness and f insulation. <br />type o <br />7. Providing training and demonstrations for the systems specified In this tllvislon of <br />correlation of activities. If the tleatlline(s) pass without resolution of the problem, the <br />the specifications. <br />a res es the right to obtain supplementary services and/or equipment to <br />esolve the problem. if any functional lest fails, any costs incurred for further retesting <br />3.1 DUCT INSTALLATION <br />A. Drawing plans, schematics, and diagrams indicate general location and arrangement <br />C. Room names and numbers, ceiling d ceiling height. <br />gtypes an g g <br />2. Submit VRF piping and equipment layout drawings. Verify clearance and <br />E. The work inclutletl in the commissioning process involves acemplele and thorough <br />shall bathe contractors responsibility, including the caslabor and travel expenses. <br />of tlucf system.lntlicafed duct locations, configurations, and arrangements were used <br />interferences with other trades prior to preparing drawings. IMEG will provide <br />valuation of the operation and performance of all components, systems, and sub- <br />to size ducts and calculate friction loss for air -handling equipment sizing and for other <br />electronic copies of piping drawings for contractors use If the contractor signs <br />systems. The following equipment and systems shall be included: <br />design considerations. Install duct systems as indicated unless deviations to layout <br />and returns an "Electronic File Transfer" waiver provided by IMEG. IMEG will not <br />END OF SECTION 230800 <br />are approved on Shop Drawings and Coordination Drawings. <br />consitlbar blatant reproductions of original file copies an acceptable alternative for <br />1. HVAC equipment <br />this submittal. <br />2. HVAC temperature controls <br />S TIO 23 Q�' C AN ACC SSD IES <br />B Install cis acco IO SMA A's'HVA Duct Cons ctlon Ste rds-Me <br />F. Timely and accurate documentation is essential for the commissioning process to be <br />5 taxi s in <br />E. Submit Electrical Power and Controls Diagrams: <br />effective. Documentation required ofthe commissioning process thatthe ca shall <br />PART 1 -GENERAL <br />3.2 DUCT SEALING <br />1. Power wiring diagrams for each component. <br />verify is in place and review (when connected to do so), includes the following: <br />1.1 SUMMARY <br />A. Seal duds for duct static - ,assure, seal class and leakage classes s ecified in <br />P 9 P <br />2. Wining diagrams and la outs for each control panel shown all termination <br />9Y Da 9 <br />1. Owners project requirements document <br />P 9 's <br />::Duct contained toeems <br />numbers. <br />2. Basis of design document. <br />A. Section Includes: <br />"HVAC Duct Construction an Section -Metal and Flexible," Joints and seams of <br />of <br />ductwork shall be sealed per Section 603.9 of the International Mechanical Code. <br />3. Schematic diagrams for all control, communication and Power wiring. Provide a <br />3. Shop drawing submittals. <br />1. Single -wall rectangular ducts and filings. <br />3 ER PPO TAIL <br />schematic drawing dthe central system installation. Show all interface wiring to <br />the control system. <br />4. Installation, operation and maintenance (O&M) manuals <br />2. Single -wall ,,antl ducts and flftings. <br />3. Sheet metal materials. <br />A. Comply with SMACNA's "HVAC Duct Construction Standards- Metal and Flexible,' <br />4. Schematic diagrams for all field sensors and controllers. <br />5. Training materials, agenda and training schedules for owner's operating <br />Chapter 5, "Hangers and Supports.' <br />personnel. <br />4. Dud liner. <br />5. A schematic diagram for each controlled system, the schemafics shall have all <br />6. As -built documentation. <br />5. Sealants and gaskets. <br />3.4 DUCT SCHEDULE <br />A. Supply Ducts: <br />control points labeled. The schematics shall graphically show the location of all <br />controlm elements in the system. <br />7. Warranties for equipment, systems and project. <br />6. Hangers and supports. <br />1. Duds Connected to Fan Coil Units, Furnaces, Heat Pumps, and Terninal Units: <br />6. A schemafic wining diagram for each controlled system. Each schematic shall <br />8. Test and balance reports. <br />7. Manual volume dampers. <br />a Pressure Class: Positive 2-inch cog. <br />have all lements beled. Label all terminals. <br />ela <br />9. Results of factory tests specifietl in division 23 sections of this specification for <br />B. Fire dampen. <br />7. All installation details and any other details required to demonstrate that the <br />construction. <br />9. Combination fire and smoke dampers. <br />b. Minimum SMACNA Seal Class: A. <br />system will funcfion properly, <br />10. Results of tests specified in division 23 sections of this specification for <br />10. Cortitlor Dampers <br />c. SMACNA Leakage Class for Reciangulan 12. <br />8. All interface requirements with other systems. <br />construction. <br />tl. SMACNA Leakage Class for Round: 12. <br />1.6 <br />QUALITY ASSURANCE <br />11. Commissioned systems resource manual. <br />12. Flange connectors. <br />3.5 ACCESSORY INSTALLATION <br />A. Installer Qualifications: Trained and approved by manufacturer of equipment. <br />G. Detailed testing shall be performed on all installed equipment and systems to ensure <br />12. Taming vanes. <br />A. Install duct accessories a co.rdin to applicable details in SMACNA's"HVAC Dud <br />9 PP ice <br />1.7 <br />DELIVERY, STORAGE AND HANDLING <br />that operation and performance conform to contract documents. The following testing <br />13. Duct -mounted access door. <br />Construction Standards - Metal and Flexible" for metal ducts and in NAIMA AH116, <br />is required as part of the commissioning process: <br />14. Flexible connectors, <br />"Fibrous Glass Duct Construction Standards," for fibrous -glass ducts. <br />A. Deliver, store and handle equipment and refrigerant piping accoding to <br />manufacturars recommendations. <br />1. Functional performance tests (FPT) shall determine if the HVAC system is <br />15. Flexible ducts. <br />3.6 GRILLES, REGISTERS AND DIFFUSER INSTALLATION <br />operating in accordance with the design Intent This Includes all operating modes, <br />16. Grilles, registers and diffusers. <br />A. Install In accordance with manufacturer's Instructions. <br />1.8 <br />WARRANTY <br />interlocks, control responses, antl specific responses to abnormal or emergency <br />"contractor <br />A. See Secton 07 7800 - Closeout Submltlals, for additional warranty requirements. <br />conditions. FPT shall be done by contractor as directed" testing and <br />then tested again during ca witnessed testing. <br />PART 2 - PRODUCTS <br />2.1 SINGLE -WALL RECTANGULAR DUCTS AND FITTINGS <br />B. Check location of outlets and Inlets and make necessary adjustments In position to <br />conform with architectural features, symmetry, and lighting arrangement. <br />B. Compressors: Provle manufacturers warranty for six (6) yeare from dale of <br />installation. During the stated period, should any part fail due to dialects in material <br />H. Comprehensive training of 08M personnel shall be performed by the HVAC sub- <br />A. General Fabrication Requirements: Comply SMACNA's'HVAC Duct <br />C. Ceiling -Mounted Outlets and Inlets: Drawings indicate general arrangement of duds, <br />and workmanship, it shall be repaired or replaced at the discretion of Carrier <br />contractor, and where appropriate, by other sub -contractors, and vendors prior to <br />with <br />pressure c <br />ConsWction Standards -Metal and Flexible' based on indicated static- lass <br />fittings, and accessones. Air outlet and inlet locations have been indicated to achieve <br />tlesign requirements for air volume, noise criteria, airflow pattern, throw, and pressure <br />Corp bad according to Carter's tents and conditions. All warranty service work <br />shall be performed bye Carrier factory trained service professional. <br />turnover d building to the owner. The training shall include classroom instruction, <br />along with hands-on instruction on the installed equipment and systems. <br />unless otherwise indicated. <br />drop. Make final locations where indicated, as much as practical. For units installed in <br />2.2 SINGLE -WALL ROUND DUCTS AND FITTINGS <br />lay -in ceiling panels, locate units in the center of panel. Coordinate exact location with <br />PART 2- PRODUCTS <br />3.3 COMMISSIONING TEAM <br />Architectural reflected ceiling plan. Where architectural features or other items conflict <br />A. General Fabrication Requirements: Comply with SMACNA's'HVAC Duct <br />with installation, notify Architect for a determination of final location. <br />2.1 <br />MANUFACTURERS <br />This section defines the members of the commissioning team (CXT) and outlines the responsibilities of <br />Construction Standards - Metal and Flexible." Chapter 3, "Round, Oval, and Flexible <br />A. Basis of Design: the system design indicated in contract documents is based on <br />each member of the CXT. All CXT members work together to fulfll their centracted responsibilities and <br />meet the objectives of the contract documents. <br />Duct," based on Indicated static -pressure class unless otherwise Indicated. <br />D. Install diffusers to ductwork with air tight connection. <br />equipment and system designed by Cartier, <br />2.3 SHEET METAL MATERIALS <br />E. Provide balancing dampens on duct take-eff to diffusers, antl grilles antl registers, <br />S. Systems manufactured by other manufacturers will not be considered unless <br />A. Members of the commissioning team, at a minimum, to include: <br />"HVAC <br />despite whether dampers are specified as part of the diffuser, or grille and register <br />approved and responsibility accepted for by the landlord. <br />1. Owner's representative. <br />A. General Material Requirements: Comply with SMACNA's Duct Construction <br />Standards- Metal and Flexible" for acceptable materials, material thicknesses, and <br />assembly. <br />2.2 <br />HVAC SYSTEM DESIGN <br />2. Owner operations staff representative. <br />duct construction methotls unless otherwise indicated. Sheet metal materials shall be <br />F. Install diffusers, registers, and grilles with airtight connections to duct s and to allow <br />free of pitting, seam marks, roller marks, stains, discebidders, and other <br />service and maintenance of dampers, air extractors, and fire dampers. <br />A. System Operation: Heating and cooling, simultaneously. <br />3. Architect/ engineer (ale), <br />Imperfections. <br />1. Zoning: Provide capability for temperature control for each Individual <br />4. General contractor. <br />24 DUCT LINER <br />Refer to Division <br />airoutletsman and inlets recommendations. <br />G. Painlalland supir port all <br />9.Insfall and support all GRDs per manufacturers recommendations. <br />indoor/evaporator unit independently of all other units. <br />5. Mechanical sub -contractor. <br />A. Fibrous -Glass Duct Liner: Comply with ASTM C 1071, NFPA 90A, or NFPA 90B; and <br />1. GRDs welghing less than 20 pounds shall be positively attached to telling <br />2. Zoning: Provide heating/cooling selection for each individual indoor/evaporator <br />6. Plumbing sub -contractor. <br />with NA MA AH124, "Fibrous Glass Duct Liner Standard" <br />us Pension main runners or to cross runners with the same carrying capacity as <br />unit independently of all other units. <br />the main runners, <br />3. Provide a complete functional system that achieves the specified performance <br />7. Major HVAC, Plumbing t suppliers <br />1 equipment pp <br />2.5 HANGERS AND SUPPORTS <br />based on the specified design condillons and that is designed and constructed <br />t <br />8. Eleciricel sub -contractor. <br />A. Hanger Rods for Noncorrosive Environments: Cadmium -plated steel rods and nuts. <br />2. GRDs weighting greater than 20 Me No.. but not more than 56 pounds, in <br />addition to the above, shall have two No. 12 gauge hangers connecletl from the <br />according to the equipment manufacturers requirements. <br />9. Lighting controls equipment supplier, <br />B. Strap and Rod Si- Comply with SMACNA's "HVAC Duct Construction Standards - <br />terminal or service to the ceiling hangers or to the structure above. These wires <br />4. Conditioned spaces are indicated on drawings. <br />10. Major electricals systems suppliers. <br />1 Ys PP <br />Metal and Flexible" Table 6sf, "Rectangular Duct Hangers Minimum Size," and Table <br />5-2, "Minimum Hanger Sizes for Round Duct." <br />a be slack. <br />may <br />Y <br />5. Intloorlevaporator unit locations are indicated on drawings. <br />it. Test and balance sub -contractor. <br />C. Steel Cables for GalvenizedSts el Ducts: Galvanized steel complying with ASTM A <br />3. GROs weighing greater than 56 Pounds shall be supported directly from the <br />structure above by approved hangers. <br />6. Branch selector unit locations are not indicated on tlrawings. <br />12. Commissioning agent. <br />603. <br />7. Required equipment unit capacities are indicated on drawings. <br />3.4 ROLES AND RESPONSIBILITIES <br />2.6 MANUAL VOLUME DAMPERS <br />H. Forward GRIDAk factors to Testing, Adjusting and Balancing Contractor. <br />END OF SECTION 23 3000 <br />8. Refrigerant piping sizes are not indicated on drawings. <br />ALL CXi MEMBERS: <br />A. Standard, Steel, Manual Volume Dampers as detailed or noted: <br />9. Connect equipment to condensate piping Provided by others; condensate piping <br />1. Follow Me commissioning plan. <br />27 FIRE DAMPERS <br />SECTION 23 8129 - VARIABLE REFRIGERANT <br />Is Indicate ondrawings. <br />2. Attend commissioning meetings as necessary. <br />A. Type: Dynamic; rated and labeled according to UL 555 by an NRTL. <br />FLOW HVAC SYSTEMS <br />S. Controls: Provide the following control interfaces: <br />3. Cooperate with all CXT members to carry out commissioning process. <br />B. Closing rating in ducts up to 4-Inch wg stable pressure class and minimum 2001 <br />1. For each indoor/evaporator unit: One wall -mounted wired "/,cal" controller, with <br />velocity. <br />PART 1 - GENERAL <br />temperature sensor; located where indicated. <br />4. Include the price of commissioning responsibilities tasks in each CXT members <br />proposal. <br />C. Fire Rating: 1-1/2 hours. <br />1.1 SECTION INCLUDES <br />C. Local Controllers: Wall -mounted wired, containing temperature sensor. <br />PART 4- PRODUCTS <br />2.8 COMBINATION FIRE AND SMOKE DAMPERS <br />A. Variable Refrigerant Volume HVAC System Includes: <br />2.3 <br />EQUIPMENT <br />4.1 TEST EQUIPMENT <br />A. Type: Dynamic; rated and labeled according to UL 555 and UL 5555 by an NRTL. <br />1. Indoor/Evaporator Units. <br />A. All Units: Factory assembled, wined, and Piped and factory tested for function and <br />safety. <br />All industry standard test equipment, special tools, ladder/lifts, two way radios and equipment required <br />B. Closing rating in ducts up to flinch wg static pressure class and minimum 2000-fpm <br />2. Refrigerant Pipin% <br />for performing the specified tests shall be provided by the contractor and shall be approved by the ca, <br />velocity. <br />1. Performance certification: AHRI cerfifed; W W W,AHRINET.ORG, <br />The owner shall furnish necessary utilities for the commissioning process. <br />C. Fire Rating: 1-1/2 hours. <br />3. Control Panels. <br />2. Safely certification: Tested to Uek-ETL, L 1995 by UL or Intertlisted in ITS (DIR), <br />A. Any portable or hantl-held setup/calibration devices required to initialize the control <br />4. Control Wiring. <br />and bearing the certKcaflon label. <br />ys provi y system su quipmen <br />s lem shall be provided b the controls t b-contractor and equipment <br />D. Frame: Hal -shaped, 0.094-inch-thick, galvanized sheet steel, with welled, <br />1.2 RELATED DOCUMENTS <br />3. Provide units capable of serving the zones indicated. <br />supplier for testing. <br />interlocking, gusseted or mechanically attached comers and mounting flange. <br />A. Section 221005 -Plumbing Piping: Condensate Drain Piping. <br />4. Energy Efficiency: Report EER and COP based on tests conducted at "Full Load" <br />B. The instrumentation used in the commissioning process shall meet the following <br />E. Heat- Responsive Device: Electric reseltable device and switch package, factory <br />in accordance with AHRI 2101240 or alternate test method approved by U.S. <br />standards: <br />installad, rated. <br />1.3 REFERENCE STANDARDS <br />Department of Energy. <br />F. Blades: Roll -formed, horizontal, interlocking, 0.063-inch-thick, g.1-need sheet steel. <br />A. AHRI 2101240- Standard for Performance Rating of Unitary Air -Conditioning and At, <br />1. Be sufficient quality and accuracy to lest antllor measure system performance <br />Source Heal Pump Equipment; 2008, Including all Addenda. <br />B. Electrical Characteristics: <br />within the tolerances required. <br />G. Leakage' Class 11, <br />B. ASHRAE STD 90.1 I-P - Energy Standard for Buildings Except Law -Rise Residential <br />1. Power- Indoor Units: 208 to 230 Volts, Single Phase, 60 HZ <br />2. Be calibrated althe manufacturers recemmended intervals with calibration tags <br />2.9 CORRIDOR DAMPERS <br />Buildings; Most recent edition adopted by Authority Having Jurisdiction, Including all <br />2. 208-230 Voltage Range: 187 to 253 Volts. <br />permanently affixed to the Instrument <br />A T D <br />Type: Dynamic; rated and labeled according to UL 555 and UL 555C by an NRTL <br />applicable amendments and supplements. <br />3. Be maintained in good repair and operating cond%ion throughout the duration of <br />C. Refrigerant Piping: <br />use on this project. <br />B. Closing rating in ducts up to flinch wg static pressure class and minimum 2000-fpm <br />C. ITS (DIR)- Directory of Listed Products; current edition. <br />1. Insulate each refrigerant line individually between the condensing and indoor <br />velocity. <br />D. NFPA 70- National Electrical Code; most recent edition adopted by the Authority, <br />units. <br />4. Be Immediately recllibrated or repaired V dropped and/or damaged In anyway <br />duringthis t. <br />use on project. <br />C. Fire Rating: 1-1/2 hours. <br />Having Jurisdiction, including all applicable amendments and supplements. <br />2.4 <br />INDOORIEVAPORATOR UNITS <br />D. Frame: Hat -shaped, 0.094-inch-thick, galvanized sheet steel, with welded, <br />E. UL 1995 -Heating and Cooling Equipment; current edition, including all revisions. <br />PART 5 - EXECUTION <br />interlocking, gusseled or mechanically attached comers and mounting flange. <br />A. All IndoodEvaporator Units: Factory assembled and tested DX fi it units, with <br />5.1 GENERAL <br />E. Heat- Responsive Device: Electric mainitable device and switch package, factory <br />1.4 ADMINISTRATIVE REQUIREMENTS <br />electronic proportional expansion valve, control circuit board, factory wiring and <br />piping, self -diagnostics, au -start function, 3-minute fused time delay, and test run <br />A. The contractor shall complete all of work so the systems can be earned, <br />installed rated. <br />A. meeting one week poor to the start <br />on Meeting: Conduct a plendance <br />switch. <br />phases <br />tested, balanced, and commissioning procedures undertaken. This includes the <br />of work <br />f the work of this section; require attendance by all affected Installers. <br />by <br />plate installation dart equipment, materials, fixtures, pipe, valves, wire, <br />F. Blades: Roll -formed, horizontal, interlocking, 0.063-inch-thick, galven¢ed sheet steel. <br />g' <br />1.5 SUBMITTALS <br />1. Refrigerant: Refrigerant circuits factory -charged with dehydrated air, for field <br />insulation, controls, etc., per the contract documents and related direcfives, <br />G. Leakage' Class 11, <br />- <br />charging, <br />clarifications, and change orders. <br />2.10 FLANGE CONNECTORS <br />A. See Section 01 3000 -Administrative Requirements for submittal procedures. <br />computerized <br />2. Temperature Control Mechanics: Return airtfsuper <br />B. Product Data: Submit manufacturers standard data sheets showingthe followin for <br />g <br />hand <br />propoNonal-integralEemative (PID) control of super heat. <br />B. A commissionin Ian shall be developed b the ca. The contractor shall assist the ca <br />9 P Pe Y <br />in preparing the commissioning plan by Providing all necessary information pertaining <br />A. Description: Add -on or roll -formed, factory -fabricated slidebn transverse flange <br />connectors, gaskets, and components. <br />each item of equipment. Marked to correlate to equipment item markings indicated in <br />contract documents: <br />3. Coils: Direct expansion type constructed from copper tubes expanded into <br />to the actual equipment and Installation. If contractor Initiated system changes have <br />been made that alter the commissioning process, the ca shall notify the owner. <br />B. Material: Galvanized steel. <br />1. Indoor/Evaporator Units: <br />aluminum fins to forma mechanical bond; waffle louver fin and high heat <br />exchange, rifled bore Who tlesign; factory tested <br />C. Acceptance procedures are normally intended to begin prior to completion of a <br />C. Gage and Shape: Match connecting ductwork. <br />a. Cooling Capacity: BTU/H (W). <br />a. Provide thermistor on liquid and gas lines. <br />system antllor sub -systems, and shall be coordinated with the division 23 <br />2.11 TURNING VANES <br />b. Heating Capacity: BTU/H (W). <br />4. Fans: Dlred-drive, with statically and dynamically balanced Impellers; high and <br />clor. <br />s bconiraStart of acceptance procedures before system completion does not <br />relieve the contractor from completing those systems as per the schedule. <br />A. Manufactured Tuning Vanes for Metal Ducts: Curved blades of galvanized sheet <br />a Cooling Input Power: BTU/H(KW). <br />low speeds unless otherwise indicated; motor thermally protected. <br />steel; support with bars perpendicular to blades set; set into vane runners suitable for <br />d. Heating Input Power: BTU/H (KW). <br />5. Return Air Filter. Washable long -life net filter with mildew proof resin, unless <br />5.2 PARTICIPATION IN COMMISSIONING <br />duct mounting. <br />otherwise intlicatetl. <br />The contractor shall provide skilled personnel to start-up and debug all systems within division 23. <br />2.12 DUCT -MOUNTED ACCESS DOORS <br />a Operating temperature range, cooling and heating. <br />6. Condensate Drainage: Built-in contlensate drain pan with PVC drain connection. <br />These same personnel shall be made available to assist the ll in completing the commissioning <br />program. Work schedules, time required etc,, shall be requested by the cal and coordinated <br />A. Duct Access Doore: Fa access panels according to SMACNA's <br />I. Air Flow: Cubic feet pr minute (cubic meters per second). <br />a. Units with Built -In Condensate Pumps: Provide condensate safely shutoff <br />Contractor ensure that the qualified personnel are available and present during <br />the contractor. that the q <br />"HVACOu t <br />rds - <br />HVAC Ducf Construction Standards- Metal and Flexible", Figures 7-2, "Duct Access <br />,"Duct <br />g. Fan curves. <br />and alarm. <br />upoor. <br />the agreed upon schedules and of suffcienl duration to complete the necessary tests, adjustments, <br />the <br />Doors and Panels," and 7-3, "Access Doors -Rountl Duct" <br />h. External Static Pressure (ESP): Inches W G (PA). <br />and/or problem resolutions. <br />2.13 DUCT ACCESS PANEL ASSEMBLIES <br />I. Sound Pressure Level: DB(A). <br />7. Cabinet Insulation: Sound absorbing foamed polystyrene and Polyethylene <br />insulation. <br />A. System performance problems and discrepancies may require additional personnel <br />A. Labeled according to UL 1978 by an NRTL. <br />J. Electrical Data: <br />B. Concealed -In -Ceiling Units: Ducted horizontal discharge and relum; galvanized steel <br />time, ca time, reconstruction of systems, and/or replacement of system components. <br />The additional contractor Personnel time shall be made available for subsequent <br />B. Panel and Frae: mMinimum thickness 0.0428-inch stainless steel. <br />1) Maximum Circuit (MCA). <br />cabinet. <br />ning periods until the required system performance is obtained at no <br />adaitionsi <br />C. Fasteners: Stainless steel. Panel fasteners shall not penetrate duct wall. <br />2) Maximum Fuse Amps (MFA). <br />1. Return Air Filter. manufacturers standard. <br />at to the owner. <br />D. Gasket: Comply with NFPA 96; grease -fight, high -temperature ceramic fiber, rated for <br />3) Maximum Starting Current MSC). <br />2. Sound Pressure: 29 DBA,measured at low speed at 5 feet (1.5 M) below unit. <br />minimum 2000 deg F. <br />4) Full Lead Amps (FLA). <br />3. Provide eternal static tch adjustable for high efficient filter <br />pressure scat 1 g y <br />E. Minimum Pressure Rating: 10-Inch cog, positive or negative. <br />5) Total Over Current Amps(TOCA) <br />operation. <br />2.14 FLEXIBLE DUCTS <br />fi) Fan Motor: HP (W). <br />4. Condensate Pump: Built -In, with lift of 9lnches (229 ram), minimum. <br />�I,blc LAWRENCE <br />GROUP <br />St. Louis <br />319 Norlh 4th Street <br />Suite 1000 <br />St. Louis, Missouri 63102 <br />(314)231-5700 <br />csxTo Be Determined <br />PROUESSICeAL ENGINEER. <br />086, <br />4(11 <br />.IMEG <br />IMEG <br />7600 E Orchard Road, Suite 250-S <br />Greenwood Village, CO 80111 <br />Phone: 303.796.6000 <br />IMEG Project No: 24000280.07 <br />W <br />C <br />l <br />:trpS GI}T FE�V?� <br />ONAL'EN <br />oe.al.a�ay <br />Eye Ol • t0"i-07d <br />W <br />wT <br />V I <br />O <br />7 <br />do <br />U D, <br />N <br />� <br />� t <br />O <br />I I0 <br />m W <br />O � <br />co VJ <br />in-o e�iuh <br />imnvmrs�or, pare aawitlp orma r <br />eMn�g aMytlHaivaeEnforl. specirxpropery W Ne <br />mpieE a reproEuceE n carob or <br />caPinrmen conmmomnvarcoae or probe, Arrow the <br />No. Description Data <br />5 MECH REVIEW 08/21/2024 <br />MECHANICAL AND <br />PLUMBING <br />SPECIFICATIONS <br />p�4wxarea,. s�aana�ea,. <br />2024906.011 <br />ore., at ■ <br />MSK w, <br />Irse one: �I <br />MARCH 27. 2024 <br />