Laserfiche WebLink
5. Switch box accessible from side or bottom. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Verify that required electrical services have been installed and are in the proper <br />locations prior to starting installation. <br />B. Verify that condensate piping has been installed and is in the proper location prior to <br />starting installation. <br />C. Notify Arch itect if cond0ions for installation are unsatisfactory. <br />3.2 INSTALLATION <br />A. Install in accordance with manufacturers instructions. <br />S. Install refrigerent piping in accordance with equipment manufacturers instructions. <br />C. Perform wiring in accordance with NFPA 70, National Electric Cade (NEC). <br />D. Coordinate with installers of.y..m. and equipment connecting to this system. <br />3.3 SYSTEM STARTUP <br />A. Provide manufacturers field reproaamative to perform system startup. <br />B. Prepare and start equipment and system in accordance with manufacturers <br />instructions and recommendations. <br />C. Adjust equipment for proper operation within manufacturer's published tolerances. <br />3.4 CLEANING <br />A. Clean exposed components of dirt, finger marks, and other disfigurements. <br />3.5 CLOSEOUT ACTIVITIES <br />A. Demonstration: demonstrate op..ti.n of system to Owner's personnel. <br />1. Use operation and maintenance data as reference during demonstration. <br />2. Conduct walking tour of project. <br />I3. Briefly describe function, operation, and maintenance of each component. <br />S. Training: Train Owners personnel on operation an maintenance of system. <br />1. Use operation and maintenance manual as training reference, supplemented with <br />additional training materials as required. <br />2. Provide minimum of two hours of training. <br />3. Instructor: Manufacturers training personnel. <br />4. Location: Al project site. <br />3.6 PROTECTION <br />A. Protect installed componentsfrom subsequent construction operations. <br />B. Replace exposed components broken or otherwise damaged beyond repair. <br />END OF SECTION 23 8129 <br />�I,blc LAWRENCE <br />GROUP <br />St. Louis <br />319 Norlh 4th Street <br />Suite 1000 <br />St. Louis, Missouri 63102 <br />(314)231-5700 <br />csrvTo Be Determined <br />cws <br />.IMEG <br />MEG <br />7600 E Orchard Road, Suite 250-S <br />Greenwood Village, CO 80111 <br />Phone: 303.796.6000 <br />IMEG Project No: 24000280.07 <br />W <br />O <br />l <br />:fipS GI}T FE�V?� <br />ONA L' N <br />oe a1.a�ay <br />E.poo�• ro•�7e <br />W <br />W <br />00 <br />T <br />V I <br />O <br />70 <br />LL <br />U N <br />o 70 <br />�o <br />m W <br />o� <br />mOct <br />up.ro n, 'i1 <br />'i-blir N.pare aawitlg�orma y <br />aMng aM Mtaib on it are iM1e acts DroDery W Ne <br />may Ee used for Ixar specirc Droled only. <br />d a duced, h wMb or <br />r eny oNerpurypae,copierepro <br />or poledailMul Me <br />No. Descriptbn Data <br />il <br />MECHANICAL AND <br />PLUMBING <br />SPECIFICATIONS <br />pa,.dxaa�, <br />2024906.011 <br />s�aalxa�sa, <br />Dawn sr <br />MSK <br />Iwie one: <br />M 1 0 <br />MAARR CH 27. 2024 <br />