Laserfiche WebLink
Johnson <br /> ))) <br /> Controls <br /> Scheduling <br /> Thank you for working with Johnson Controls on this project. We would like to take this opportunity to introduce you to the project team.JORDAN SMITH is the <br /> Project Manager assigned to this project to help with generic project information.ERIC BECK is the Project System Specialist to assist with drawings/design <br /> questions.YVONNE THOMPSON is available for scheduling technicians. <br /> Phone: 206-291-1400 <br /> In an effort to assist you in your installation we require you to arrange a Pre-Construction meeting with one of our Technicians. This meeting will allow your field <br /> foreman to ask any questions they may have in regard to the installation of your system. Based on the equipment quantities and current scope of work our <br /> Technician will need no less thaM15 business days to complete all necessary programming and commissioning from the time the below checklist is complete <br /> prior to any AHJ testing. Please make sure this time is allowed for in the General Construction CPM schedule as it cannot be compressed. Change orders, <br /> change of scope,etc.may require additional time allotment to field personnel. <br /> Installation Checklist <br /> Johnson Controls is committed to providing the highest quality service available. As part of this service we want to ensure that the installation results in a <br /> trouble-free system. Please review the Checklist below and ensure each item is complete prior to our site visit. <br /> A Technician will be dispatched only after the below checklist items have been completed. If these items are not completed prior to the visit by our technician, <br /> you may incur additional charges not covered by our quotation. Please feel free to contact our office if you have any questions. <br /> o Fire Alarm Panel(s)have been mounted and all wiring(power,MAPNET,signal,door-holders,etc.)pulled into panel(s). <br /> o All wiring pulled into panel(s)or junction boxes have been permanently marked with wire markers and can easily be identified by a Johnson Controls <br /> o System Power is supplied and on a dedicated circuit(Do Not Energize prior to Technician visit). <br /> o All peripheral devices have been mounted(Smoke Detectors still covered). <br /> o All end-of-line resistors have been installed. <br /> o All alarm initiating circuits(smoke detectors,pull stations,etc.)have been checked for shorts,opens and grounds. <br /> o All alarm notification circuits(speakers,horns,strobes,etc.)have been checked for shorts,opens and grounds. <br /> o All remaining wiring(door-holders,FACP 24VDC,etc.)has been checked. <br /> o Flows,Tampers,and Pressure Switches installed,properly wired and adjusted. <br /> o All devices are properly protected against construction dust and contamination. <br /> o Contact us immediately if there is no digital dialer or system monitoring provisions already in place. The dialer,phone lines and service will be <br /> required for system testing. <br /> o There are no missing parts or equipment. <br /> Fire,Security,Communications,Workforce Solutions,Sales Service <br /> Offices Representatives in Principle Cities throughout the World <br />