Laserfiche WebLink
The comments below were generated from this project's City of Everett Civil Reviewers. All questions shall be routed through this project's Public Works <br />Reviewer Thad Newport with City of Everett Permit Services (TNewportpeverettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />1 <br />Site Plan <br />— <br />Include a TESC Plan similar to City of Everett Standard Drawing <br />103 showing how the 13 elements of erosion control will be <br />managed and where they will be located on the site. <br />2 <br />Site Plan <br />0 Update the Site Plan to include sewer stub location and <br />drainage connection per approved subdivision civil plans. <br />• Add note to plan that all roof drainage and driveway drainage <br />to be directed to the combined detention/wetvault per <br />approved subdivision civil plans. <br />3 <br />Drainage <br />0 Provide Drainage Narrative that explains what stormwater <br />Narrative <br />minimum requirements are triggered based on hard surface <br />and <br />quantities and how those were managed as part of Civil Plans <br />Declaration <br />for Subdivision. Include Note that all disturbed areas to be <br />amended per BM T5.13. <br />of Covenant <br />• Provide signed draft of Declaration of Covenant for <br />Stormwater BMPs for review. This document must be <br />recorded with the County prior to final inspection/Certificate of <br />Occupancy. <br />Page 2 of 2 <br />