Laserfiche WebLink
Commissioning Plan Page 7 <br /> D. Cx Process and Sequence <br /> 1. The following is an overview of the Cx process and defines the project phases in <br /> the terms used in this plan. <br /> Project Phase & Description Cx Sequence <br /> a) Construction Phase • CA submits Cx Plan. <br /> Phase of the project during which the • CA develops detailed equipment-specific <br /> facility is constructed and/or systems and checklist and Functional Performance Test <br /> equipment are installed and started. procedures and documentation. <br /> Contractor and subcontractors execute . CA, A/E, and contractors review FPTs. A/E <br /> installation start-up forms, and submit approves FPTs. <br /> O&M, and warranty information. . Contractors submit Training Plans for A/E <br /> Contractor/Vendors conduct equipment approval. <br /> specific training. • Contractors conduct installation inspections. <br /> Construction phase will conclude after CA reviews reports and attends periodic <br /> successful system and equipment progress meetings. <br /> startups. . Contractor executes and documents the <br /> start-up and checkout. CA invited to witness. <br /> Documentation is gathered throughout <br /> testing phases <br /> b) Construction Acceptance Phase: • CA directs/conducts Functional Performance <br /> The facility systems and equipment are Tests in which most parties are also <br /> inspected, tested, verified, etc. and is participants to some degree. <br /> when most of the formal training occurs. • CA documents testing and compiles <br /> This will occur after the construction phase information for A/E approval. <br /> is complete. A/E and contractor finalize . Contractors submit updated training plans <br /> "as built" or record documentation. and systems level training programs for A/E <br /> Approved Functional completion marks the approval. CA reviews. <br /> end of this phase. • Contractor updates and submits record <br /> drawings and specs. <br /> • CA, A/E, and Owner review and approve <br /> systems O&M manuals. <br /> St. Mary Magdalen ES <br /> tv Neudorfer Engineers, LLC. Everett, WA <br />