Commissioning Plan Page 13 <br /> c) Investigate the dynamic interactions between components in the building <br /> system. Evaluate the scheduling, the interaction between heating and <br /> cooling, and the effectiveness of the HVAC system in meeting the comfort <br /> requirements. <br /> 9. In some systems, deficient performance will result in additional work being <br /> required to commission the systems. This work will be completed under the <br /> direction of the Owner's Representative and the Engineer, with input from the <br /> Contractor and equipment supplier. Whereas all members will have input and <br /> the opportunity to discuss the work and resolve problems, the Engineer will have <br /> final jurisdiction on the work needed to achieve performance. Corrective work <br /> shall be completed in a timely fashion to permit timely completion of the <br /> commissioning process. <br /> 10. A functional performance test shall be aborted if any system deficiency prevents <br /> the successful completion of the test. The responsible subcontractor shall correct <br /> all deficiencies in accordance with the applicable contract requirements. The item <br /> shall then be retested until it has been completed with no errors. Installing <br /> Contractor is responsible for retesting costs. <br /> St. Mary Magdalen ES <br /> Neudorfer Engineers, LLC. Everett, WA <br />