Laserfiche WebLink
NEUDORFER <br /> ENGINEERS NE BBintelrA <br /> R <br /> ERV/ HRV <br /> PROJECT: St. Mary Magdalen Elementary HVAC Project DATE: 8/15/2024 <br /> LOCATION: Everett, WA CONTACT: Kami Valentine <br /> PROJECT#: 2024-0871 AUTHOR: <br /> 1.0 Setpoints - ERV-01 Functional Performance <br /> Verification Response Notes By Date/Time <br /> 1 DAT Setpoint 60°F PASS KV 8/8/2024 8:48 <br /> 2 Operates based on occupance 6 AM to 6 PM VK 8/8/24 8:48 <br /> schedule <br /> 2.0 Heating Mode - ERV-01 Functional Performance <br /> Verification Response Notes By Date/Time <br /> 1 TEST PROCEDURE, Raise the DAT <br /> setpoint above DAT <br /> 2 OSA Damper is Open Pass KV 8/8/2024 8:48 <br /> 3 EA Damper is Open Pass KV 8/8/2024 8:48 <br /> 4 Supply Fan is ON Pass KV 8/8/2024 8:48 <br /> 5 JExhaust Fan is ON Pass KV 8/8/2024 8:48 <br /> 6 lHeater is ON Pass Heater was set to 75°F KV 8/8/2024 8:48 <br /> 3.0 Ventilation Mode - ERV-01 Functional Performance <br /> Verification Response Notes By Date/Time <br /> 1 TEST PROCEDURE, Lower the DAT <br /> setpoint below DAT <br /> 2 OSA Damper is Open Pass KV 8/8/2024 8:48 <br /> 3 EA Damper is Open Pass KV 8/8/2024 8:48 <br /> 4 Supply Fan is ON Pass KV 8/8/2024 8:48 <br /> 5 JExhaust Fan is ON Pass KV 8/8/2024 8:48 <br /> 6 lHeater is OFF Pass KV 8/8/2024 8:48 <br /> 4.0 OFF Mode - ERV-01 Functional Performance <br /> Verification Response Notes By Date/Time <br /> 1 TEST PROCEDURE,Set the unit to <br /> OFF <br /> 2 OSA Damper is Closed Pass KV 8/8/2024 8:48 <br /> 3 EA Damper is Closed Pass KV 8/8/2024 8:48 <br /> 4 Supply Fan is OFF Pass KV 8/8/2024 8:48 <br /> 5 JExhaust Fan is OFF Pass KV 8/8/2024 8:48 <br /> 6 lHeater is OFF Pass KV 8/8/2024 8:48 <br />