NEUDORFER A <br /> ENGINEERS NE BB <br /> intelrA <br /> ERV/ HRV <br /> PROJECT: St. Mary Magdalen Elementary HVAC Project DATE: 8/15/2024 <br /> LOCATION: Everett, WA CONTACT: Kami Valentine <br /> PROJECT#: 2024-0871 AUTHOR: <br /> SYSTEM/UNIT: ERV-02 <br /> Documentation - Mechanical - ERV-02 <br /> Verification Response Notes By Date/Time <br /> 1 Installation and startup Pass KV 8/8/24 8:48 <br /> documentation submitted <br /> 2 Manufacturer's cut sheets submitted Pass KV 8/8/24 8:48 <br /> Model Verification - Mechanical - ERV-02 <br /> Verification Response Notes By Date/Time <br /> 1 Performance data(fan curves,coil Mitsubishi KV 8/15/24 9:55 <br /> data,etc.)submitted <br /> 2 Model Number: LGH-F1200RVX2-E KV 8/15/24 9:55 <br /> 3 Serial Number: N/A KV 8/15/24 9:55 <br /> 7-71 <br /> 4 Unit Capacity 1200 KV 8/15/24 9:55 <br /> General - Mechanical.- ERV-02 <br /> Verification Response Notes By Date/Time <br /> 1 Access doors close tightly-no leaks Pass KV 8/8/24 8:48 <br /> 2 Casing condition good: no dents, Pass KV 8/8/24 8:48 <br /> leaks,door gaskets installed <br /> 3 Clean up of equipment completed KV 8/8/24 8:48 <br /> per contract documents Pass <br /> 4 Maintenance access acceptable for Pass KV 8/8/24 8:48 <br /> unit and components <br /> 5 Unit Labeled Pass KV 8/8/24 8:48 <br /> Installation - Mechanical - ERV-02 <br /> Verification Response Notes By Date/Time <br /> 1 Construction filters removed, new Pass KV 8/8/24 8:48 <br /> filters installed <br /> 2 Filter type and efficiency permanently Pass KV 8/8/24 8:48 <br /> affixed to housing <br /> 3 Field instruments installed according KV 8/8/24 8:48 <br /> to specification and drawings(gages, NA <br /> flow meters,etc <br /> 4 Vibration isolation equipment KV 8/8/24 8:48 <br /> installed&released from shipping Pass <br /> locks <br /> Installation -Controls - ERV-02 <br /> Verification Response Notes By Date/Time <br /> 1 Temperature,pressure,flow gages KV 8/8/24 8:48 <br /> and sensors installed per spec& Pass <br /> ldrawing <br /> Electrical &Controls - ERV-02 <br /> Verification Response Notes By Date/Time <br /> 1 All control devices and wiring Pass KV 8/8/24 8:48 <br /> complete <br />