My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8717 7TH AVE SE 2024-12-31
>
Address Records
>
7TH AVE SE
>
8717
>
8717 7TH AVE SE 2024-12-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 1:17:49 PM
Creation date
12/17/2024 10:40:30 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
8717
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEUDORFER <br /> ENGINEERS NE BBintelrA <br /> R <br /> ERV/ HRV <br /> PROJECT: St. Mary Magdalen Elementary HVAC Project DATE: 8/15/2024 <br /> LOCATION: Everett, WA CONTACT: Kami Valentine <br /> PROJECT#: 2024-0871 AUTHOR: <br /> 0.1 Functional Performance - ERV-02 Functional Performance <br /> Verification Response Notes By Date/Time <br /> 1 DAT Setpoint 60°F PASS KV 8/8/2024 8:48 <br /> 2 Operates based on occupance 6 AM to 6 PM KV 8/8/2024 8:48 <br /> schedule <br /> 2.0 Heating Mode - ERV-02 Functional Performance <br /> Verification Response Notes By Date/Time <br /> 1 TEST PROCEDURE, Raise the DAT <br /> setpoint above DAT <br /> 2 OSA Damper is Open Pass KV 8/8/2024 8:48 <br /> 3 EA Damper is Open Pass KV 8/8/2024 8:48 <br /> 4 Supply Fan is ON Pass KV 8/8/2024 8:48 <br /> 5 JExhaust Fan is ON Pass KV 8/8/2024 8:48 <br /> 6 lHeater is ON Pass Heater was set to 75°F KV 8/8/2024 8:48 <br /> 3.0 Ventilation Mode - ERV-02 Functional Performance <br /> Verification Response Notes By Date/Time <br /> 1 TEST PROCEDURE, Lower the DAT <br /> setpoint below DAT <br /> 2 OSA Damper is Open Pass KV 8/8/2024 8:48 <br /> 3 EA Damper is Open Pass KV 8/8/2024 8:48 <br /> 4 Supply Fan is ON Pass KV 8/8/2024 8:48 <br /> 5 JExhaust Fan is ON Pass KV 8/8/2024 8:48 <br /> 6 lHeater is OFF Pass KV 8/8/2024 8:48 <br /> 4.0 OFF Mode - ERV-02 Functional Performance <br /> Verification Response Notes By Date/Time <br /> 1 TEST PROCEDURE,Set the unit to <br /> OFF <br /> 2 OSA Damper is Closed Pass KV 8/8/2024 8:48 <br /> 3 EA Damper is Closed Pass KV 8/8/2024 8:48 <br /> 4 Supply Fan is OFF Pass KV 8/8/2024 8:48 <br /> 5 JExhaust Fan is OFF Pass KV 8/8/2024 8:48 <br /> 6 lHeater is OFF Pass KV 8/8/2024 8:48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.