My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8717 7TH AVE SE 2024-12-31
>
Address Records
>
7TH AVE SE
>
8717
>
8717 7TH AVE SE 2024-12-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 1:17:49 PM
Creation date
12/17/2024 10:40:30 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
8717
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEUDORFER A <br /> ENGINEERS NE BB <br /> intelrA <br /> ERV/ HRV <br /> PROJECT: St. Mary Magdalen Elementary HVAC Project DATE: 8/15/2024 <br /> LOCATION: Everett, WA CONTACT: Kami Valentine <br /> PROJECT#: 2024-0871 AUTHOR: <br /> SYSTEM/UNIT: ERV-03 <br /> Documentation - Mechanical - ERV-03 <br /> Verification Response Notes By Date/Time <br /> 1 Installation and startup KV 8/8/24 8:48 <br /> documentation submitted Pass <br /> 2 Manufacturer's cut sheets submitted Pass KV 8/8/24 8:48 <br /> Model Verification - Mechanical - ERV-03 <br /> Verification Response Notes By Date/Time <br /> 1 Performance data(fan curves, coil 8/15/24 9:55 <br /> data,etc.)submitted Mitsubishi KV <br /> 2 Model Number: LGH-F1200RVX2-E KV 8/15/24 9:55 <br /> 3 Serial Number: N/A KV 8/15/24 9:55 <br /> 7771 <br /> 4 Unit Capacity 1200 KV 8/15/24 9:55 <br /> General - Mechanical - ERV-03 <br /> Verification Response Notes By Date/Time <br /> 1 Access doors close tightly-no leaks Pass KV 8/8/24 8:48 <br /> 2 Casing condition good: no dents, Pass KV 8/8/24 8:48 <br /> leaks,door gaskets installed <br /> 3 Clean up of equipment completed KV 8/8/24 8:48 <br /> per contract documents Pass <br /> 4 Maintenance access acceptable for Pass KV 8/8/24 8:48 <br /> unit and components <br /> 5 Unit Labeled Pass KV 8/8/24 8:48 <br /> Installation - Mechanical - ERV-03 <br /> Verification Response Notes By Date/Time <br /> 1 Construction filters removed,new Pass KV 8/8/24 8:48 <br /> filters installed <br /> 2 Filter type and efficiency permanently Pass KV 8/8/24 8:48 <br /> affixed to housing <br /> 3 Field instruments installed according KV 8/8/24 8:48 <br /> to specification and drawings(gages, NA <br /> flow meters,etc <br /> 4 Vibration isolation equipment KV 8/8/24 8:48 <br /> installed&released from shipping Pass <br /> locks <br /> Installation -Controls - ERV-03 <br /> Verification Response Notes By Date/Time <br /> 1 Temperature, pressure,flow gages Pass KV 8/8/24 8:48 <br /> and sensors installed per spec& <br /> 1drawing <br /> Electrical &Controls - ERV-03 <br /> Verification Response Notes By Date/Time <br /> 1 All control devices and wiring Pass KV 8/8/24 8:48 <br /> complete <br />
The URL can be used to link to this page
Your browser does not support the video tag.