Laserfiche WebLink
IVNEUDORFER •''"''� <br /> ENGINEERS E B� <br /> AN Cter-a COMDAN, <br /> Fan Coil Unit - DX <br /> PROJECT: St. Mary Magdalen Elementary HVAC Project DATE: 8/15/2024 <br /> LOCATION: Everett,WA CONTA Kami Valentine <br /> PROJECT#: 2024-0871 AUTHO <br /> SYSTEM/UNIT: FCU-01 <br /> Documentation - Mechanical -FCU-01 <br /> Verification Response Notes By Date/Time <br /> 1 Installation and startup Pass KV 8/8/24 8:59 <br /> documentation submitted <br /> 2 Manufacturer's cut sheets submitted Pass KV 8/8/24 8:59 <br /> 3 Performance data(fan curves,coil Pass KV 8/8/24 8:59 <br /> data,etc.)submitted <br /> Model Verification -Mechanical - FCU-01 <br /> Verification Response Notes By Date/Time <br /> 1 Manufacturer: Mitsubishi KV 8/15/24 9:50 <br /> 2 Model Number: PKY-P18NLMU-ETH KV 8/15/24 9:50 <br /> 3 Serial Number: 36MO2730 KV 8/15/24 9:50 <br /> 4 Electrical:HP,Volts,Phase,Amps Pass KV 8/8/24 8:59 <br /> General -Mechanical - FCU-01 <br /> Verification Response Notes By Date/Time <br /> 1 Access doors close tightly-no leaks Pass KV 8/8/24 8:59 <br /> 2 Casing condition good:no dents, Pass KV 8/8/24 8:59 <br /> leaks,door gaskets installed <br /> 3 Clean up of equipment completed Pass KV 8/8/24 8:59 <br /> per contract documents <br /> 4 Fan area clean Pass KV 8/8/24 8:59 <br /> 5 Maintenance access acceptable for Pass KV 8/8/24 8:59 <br /> unit and components <br /> 6 Unit is labeled NA KV 8/8/24 8:59 <br /> Installation -Mechanical - FCU-01 <br /> Verification Response Notes By Date/Time <br /> 1 Fan and motor alignment appear Pass KV 8/8/24 8:59 <br /> correct <br /> 2 Fan protective shrouds for belts in NA KV 8/8/24 8:59 <br /> place and secure <br /> 3 Filters clean;construction filters Pass KV 8/8/24 8:59 <br /> replaced with final filters <br /> 4 Instrumentation installed according <br /> to specification(thermometers, Pass KV 8/8/24 8:59 <br /> ressure aaaes.flow meters etc <br /> 5 Vibration isolation equipment <br /> installed&released from shipping Pass KV 8/8/24 8:59 <br /> locks <br /> Electrical &Controls - FCU-01 <br /> Verification Response Notes By Date/Time <br /> 1 lControls wiring complete Pass KV 8/8/24 8:59 <br />