My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8717 7TH AVE SE 2024-12-31
>
Address Records
>
7TH AVE SE
>
8717
>
8717 7TH AVE SE 2024-12-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 1:17:49 PM
Creation date
12/17/2024 10:40:30 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
8717
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IVNEUDORFER �+ <br /> ENGINEERS p E B� <br /> •N Cter-a COMDAN, C.6 <br /> Fan Coil Unit - DX <br /> PROJECT: St. Mary Magdalen Elementary HVAC Project DATE: 8/15/2024 <br /> LOCATION: Everett,WA CONTA Kami Valentine <br /> PROJECT#: 2024-0871 AUTHO <br /> Ductwork- FCU-01 <br /> Verification Response Notes By Date/Time <br /> 1 Balancing dampers installed as per NA KV 8/8/24 8:59 <br /> drawings <br /> 2 Duct joint sealant properly installed NA KV 8/8/24 8:59 <br /> 3 Ducts cleaned as per specifications NA KV 8/8/24 8:59 <br /> 4 OSA intakes located away from NA KV 8/8/24 8:59 <br /> pollutant sources&exhaust outlets <br /> 5 Outside air capability to space NA KV 8/8/24 8:59 <br /> serviced by FCU installed <br /> 6 There no apparent severe duct NA KV 8/8/24 8:59 <br /> restrictions <br /> 7 Boot between duct and unit tight and Pass KV 8/8/24 8:59 <br /> in good condition <br /> Piping - Mechanical -FCU-01 <br /> Verification Response Notes By Date/Time <br /> 1 No leaking apparent around Pass KV 8/8/24 8:59 <br /> refrigerant fittings <br /> 2 Refrigerant piping in good condition Pass KV 8/8/24 8:59 <br /> 3 Refrigerant piping is properly Pass KV 8/8/24 8:59 <br /> insulated according to specification <br /> and thickness re uirements <br /> Piping - Plumbing -FCU-01 <br /> Verification Response Notes By Date/Time <br /> 1 lCondensate drain installed Pass KV 8/8/24 8:59 <br /> Electrical - FCU-01 <br /> Verification Response Notes By Date/Time <br /> 1 Safeties in place and operable NA KV 8/8/24 8:59 <br /> 2 Smoke detectors in place NA KV 8/8/24 8:59 <br /> 3 Power disconnects in place Pass KV 8/8/24 8:59 <br /> 4 Power disconnect labeled Pass KV 8/8/24 8:59 <br /> Controls -FCU-01 <br /> Verification Response Notes By Date/Time <br /> 1 Control system interlocks hooked up NA KV 8/8/24 8:59 <br /> and functional <br /> 2 Have specified sequences of <br /> operation and operating schedules Pass KV 8/8/24 8:59 <br /> been implemented with all variations <br /> 3 Performance Verification Testing Pass KV 8/8/24 8:59 <br /> Completed <br /> 4 JPoint-to-point Testing&Sensor Pass KV 8/8/24 8:59 <br /> Calibration Completed <br /> OPT - Electrical - FCU-01 <br /> Verification Response Notes By Date/Time <br /> 1 Disconnect switch properly operates Pass KV 8/8/24 8:59 <br /> 2 Electrical connections complete,unit Pass KV 8/8/24 8:59 <br /> energized <br />
The URL can be used to link to this page
Your browser does not support the video tag.