NEUDORFER <br /> ENGINEERS E B� <br /> AN C =I lCi COMDFN, CAD <br /> Fan Coil Unit - DX <br /> PROJECT: St. Mary Magdalen Elementary HVAC Project DATE: 8/15/2024 <br /> LOCATION: Everett,WA CONTA Kami Valentine <br /> PROJECT#: 2024-0871 AUTHO <br /> Electrical &Controls - FCU-02 <br /> Verification Response Notes By Date/Time <br /> 1 Controls wiring complete Pass KV 8/8/24 8:59 <br /> Ductwork - FCU-02 <br /> Verification Response Notes By Date/Time <br /> 1 Balancing dampers installed as per NA KV 8/8/24 8:59 <br /> drawings <br /> 2 Duct joint sealant properly installed NA KV 8/8/24 8:59 <br /> 3 Ducts cleaned as per specifications NA KV 8/8/24 8:59 <br /> 4 OSA intakes located away from NA KV 8/8/24 8:59 <br /> pollutant sources&exhaust outlets <br /> 5 Outside air capability to space NA KV 8/8/24 8:59 <br /> serviced by FCU installed <br /> 6 There no apparent severe duct NA KV 8/8/24 8:59 <br /> restrictions <br /> 7 Boot between duct and unit tight and Pass KV 8/8/24 8:59 <br /> in good condition <br /> Piping - Mechanical - FCU-02 <br /> Verification Response Notes By Date/Time <br /> 1 No leaking apparent around Pass KV 8/8/24 8:59 <br /> refrigerant fittings <br /> 2 Refrigerant piping in good condition Pass KV 8/8/24 8:59 <br /> 3 Refrigerant piping is properly <br /> insulated according to specification Pass KV 8/8/24 8:59 <br /> and thickness re uirements <br /> Piping - Plumbing - FCU-02 <br /> Verification Response Notes By Date/Time <br /> 1 lCondensate drain installed Pass KV 8/8/24 8:59 <br /> Electrical - FCU-02 <br /> Verification Response Notes By Date/Time <br /> 1 Safeties in place and operable NA KV 8/8/24 8:59 <br /> 2 Smoke detectors in place NA KV 8/8/24 8:59 <br /> 3 Power disconnects in place Pass KV 8/8/24 8:59 <br /> 4 Power disconnect labeled Pass KV 8/8/24 8:59 <br /> Controls -FCU-02 <br /> Verification Response Notes By Date/Time <br /> 1 Control system interlocks hooked up NA KV 8/8/24 8:59 <br /> and functional <br /> 2 Have specified sequences of <br /> operation and operating schedules Pass KV 8/8/24 8:59 <br /> been implemented with all variations <br /> 3 Performance Verification Testing Pass KV 8/8/24 8:59 <br /> Completed <br /> 4 JPoint-to-point Testing&Sensor Pass KV 8/8/24 8:59 <br /> Calibration Completed <br /> OPT - Electrical - FCU-02 <br /> Verification Response Notes By Date/Time <br />