HVAC LEGEND HVAC DRAWING LIST <br /> EXHIBIT B GENERAL VALVES & GAUGES CONTROLS GLUMAC <br /> C ♦TETRA TECH COMPANY <br /> SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION engineers for a sustain able future <br /> MECHANICAL NEW WORK BALL VALVE © TEMPERATURE SENSOR b <br /> 1601 FiM1M1 Ave.,SURe 2210 <br /> O S�,attle.WA 98101 <br /> DRAWINGS () EXISTING WORK TO REMAIN SOLENOID CONTROL VALVE TQ THERMOSTAT OR THERMOMETER SHEET gumac-17 <br /> T.zas.zsz.1 gm <br /> N P"jmt Manager DeNayne Glenn <br /> —-----————(D) EXISTING WORK TO BE REMOVED PRESSURE AND TEMP.RELIEF VALVE ® CARBON DIOXIDE SENSOR NUMBER SHEET NAME H Job.No.:NUS00135 <br /> T <br /> ---------------(F) FUTURE WORK �r� BUTTERFLY VALVE Jw 0 OCCUPANCY SENSOR MO.0 MECHANICAL LEGEND AND ABBREVIATIONS X <br /> �� do MO.1 SCHEDULES&DIAGRAMS X <br /> (/ ER) EXISTING RELOCATED ��� MOTORIZED BUTTERFLY VALVE Jow 0 HUMIDITY SENSOR OR HUMIDISTAT M2.1 LEVELI-HVAC PLAN X <br /> a <br /> 'z M3.1 ENLARGED PLANS X <br /> CENTER LINE GATE VALVE 3:o ® STATIC PRESSURE SENSOR <br /> POINT OF CONNECTION OR W BALANCING VALVE 0 REFRIGERANT SENSOR <br /> POINT OF DISCONNECTION <br /> 1 � ANGLE GATE VALVE ® CARBON MONOXIDE SENSOR <br /> M-1 DETAIL 1,DRAWING M-1 <br /> �..i GLOBE VALVE 0 HYDROGENSENSOR <br /> ANGLE GLOBE VALVE DSD DUCT SMOKE DETECTOR <br /> M-1 SECTION A,DRAWING M-1 CHECKVALVE TS TEMPERATURE SENSOR GENERAL NOTES Client <br /> �T! 2-WAY CONTROL VALVE SP STATIC PRESSURE SENSOR <br /> 4� A. CONTRACT DOCUMENT DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED <br /> IjSJ 3-WAY CONTROL VALVE PS PRESSURE SENSOR OR SWITCH TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.DO NOT SCALE <br /> FOR MATERIAL QUANTITIES. <br /> w <br /> B. CONTRACTOR SHALL VISIT SITE AND VERIFY ALL EXISTING CONDITIONS AND <br /> NON-SLAM WAFER CHECK VALVE o DPS DIFFERENTIAL PRESSURE SENSOR CONNECTIONS TO EXISTING WORK PRIOR TO BIDDING AND CONSTRUCTION. <br /> HP EQUIPMENT IDENTIFICATION w THE CONTRACTOR SHALL PAY FOR AND REPAIR ALL DAMAGES CAUSED BY <br /> 1 HEAT PUMP UNIT#1 �P' PRESSURE REDUCING VALVE(PRV) z FMS AIR FLOW MEASURING STATION FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL SERVICES W S I P C <br /> UNLESS OTHERWISE INDICATED. Inspired by education. <br /> o C. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED FEES,PERMITS <br /> DIAPHRAGM VALVE HS HUMIDITY SENSOR AND INSPECTIONS.OBTAIN ALL FIELD APPROVALS ON WORK FROM Empowered by technology." <br /> w REGULATING AGENCIES WHERE REQUIRED. <br /> ® KEYED NOTE LOCK SHIELD VALVE } FS FLOW SENSOR OR SWITCH D. PROTECTION OF PUBLIC:THE CONTRACTOR SHALL PROTECT THE PUBLIC <br /> FROM INJURY DURING THE WORK BY POSTING WARNING SIGNS,GUARD <br /> NEEDLE VALVE FM FLOW METER LIGHTS AND BARRICADES. <br /> w E. CONTRALCTOR TO PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM <br /> 78°F 78 DEGREES FAHRENHEIT ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERATIONAL <br /> QUICK OPENING VALVE c- CS CURRENT SENSOR MECHANIC AL SYSTEMS,EQUIPMENT AND APPURTENACES IN THE <br /> cy cy ACCORDANCE WITH MANUFACTURERS'RECOMMENDATIONS,CONTRACT <br /> VENTURI FLOW METER Lu ❑M MOTOR DOCUMENTS,SPECIFICATIONS,APPLICABLE CODES AND REGULATIONS. <br /> F. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR <br /> PRESSURE GAUGE �A ACTUATOR PIPING INSULATION IS APPLIED. <br /> G. LOCATE ALL TEMPERATURE,PRESSURE,AND FLOW MEASURING DEVICES IN <br /> ACCESSIBLE LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP-AND Project <br /> PRESS.GAUGE WITH COCK AND SNUBBER HM HYDROGEN MONITOR DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR GOOD <br /> Q ACCURACY. <br /> THERMOMETER RM REFRIGERANT MONITOR H. TESTING,ADJUSTING,AND BALANCING AGENCY SHALL BE A MEMBER OF THE <br /> ASSOCIATED AIR BALANCE COUNCIL(AABC)OR THE NATIONAL <br /> Al ANALOG INPUT ENVIRONMENTAL WSIPC Cooling <br /> HYDRONIC BALANCING BUREAU .TESTING,ADJUSTING,ANDBALANCINGSHALL <br /> AO ANALOG OUTPUT Tower Re lacement <br /> BE PERFORMED IN ACCORDANCE WITH THE AABC STANDARDS. P <br /> DI DIGITAL INPUT J. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE 2121 W.Casino Road, <br /> DO DIGITAL OUTPUT REQUIRED,THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR <br /> PIPING SYMBOL DESCRIPTION CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY Everette,WA <br /> BAS BUILDING AUTOMATION SYSTEM DIMENSIONS ARE APPROXIMATE ONLY.THE EXACT LOCATIONS NECESSARY <br /> CHWS CHILLED WATER SUPPLY PI PULSING INPUT TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY <br /> SYMBOL DESCRIPTION THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE <br /> CHWR CHILLED WATER RETURN ENGINEER BEFORE BEING INSTALLED.DO NOT SCALE DRAWINGS. <br /> DIRECTION OF SLOPE K. ALL EQUIPMENT,PIPING,DUCTWORK,ETC.,SHALL BE SUPPORTED AS <br /> HWS HEATING WATER SUPPLY DETAILED,SPECIFIED,AND REQUIRED TO PROVIDE A VIBRATION FREE <br /> DIRECTION OF FLOW INSTALLATION. <br /> HWR HEATING WATER RETURN L. CONTRACTOR DEMOLITION SHALL NOT DISRUPT OR STOP OWNER OR <br /> NEIGHBORING SERVICES. <br /> PIPE UP(OR UP&DOWN WITH NOTATION) M. THE CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS AND DIMENSIONS, <br /> CWS CONDENSER WATER SUPPLY AND VERIFY EXACT LOCATIONS AND ELEVATIONS OF POINTS OF <br /> PIPE DOWN CONNECTION BY MEANS OF PHYSICAL EXCAVATION AND SELECTIVE <br /> CWR CONDENSER WATER RETURN DEMOLITION BEFORE STARTING WORK.SHOULD A DISCREPANCY APPEAR IN <br /> PIPE DROPIPIPE RISE THE CONTRACT DOCUMENTS,OR BETWEEN THE CONTRACT DOCUMENTS <br /> C COLD WATER AND EXISTING CONDITIONS,NOTIFY THE ENGINEER OF RECORD AT ONCE <br /> FOR INSTRUCTION ON HOW TO PROCEED. <br /> TOP CONNECTION-BRANCH LINE N. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURATE PLACEMENT <br /> OF ALL NEW CONSTRUCTION ON THE SITE. <br /> BOTTOM CONNECTION-BRANCH LINE O. COMMISSIONING OF EQUIPMENT SHALL CONFORM WITH THE 2018 WSEC <br /> T SECTIONC408 COMMISSIONING. �*L W. <br /> P. ALL PIPING INSULATION SHALL CONFORM TO THE 2018 WSEC SECTIONS <br /> jE PIPE ANCHOR Q. CAP ALL PIPE OPENINGS DURING CONSTRUCTION. <br /> TEE UP R. ALL SEISMIC ATTACHEMENT DESIGN&CONSTRUCTION IS DIFFERED TO <br /> THE CONTRACTOR.HIRE A STRUCTURAL ENGINEER,PERMIT THE DESIGN a/>� <br /> TEE DOWN &SECURE NEW EQUIPMENT TO EXISTING STRUCTURE AS REQUIRED. <br /> is <br /> toxA1 <br /> STRAINER <br /> STRAINER WITH BLOW OFF <br /> INLINE PUMP <br /> C 014-GLUMAC ALL RIGHTS RESERVED <br /> THESE DRAWINGS ARE THE PROPERTY OF <br /> GLUMAC ARE NOT TO BE <br /> BASE MOUNTED PUMP USED OR REPRODUCED IN ANY MANNER, <br /> T TEST TAP(PETE'S PLUG) WITHOUT PRIOR WRITTEN PERMISSION <br /> MANUAL AIR VENT Revisions <br /> 4 AUTOMATIC AIR VENT # Description Date <br /> Q VACUUM BREAKER <br /> VENT THRUROOF MECHANICAL- BASIS OF DESIGN <br /> SHEET TITLE. <br /> PIPE GUIDE MECHANICAL <br /> A. THIS PROJECT CONSISTS OF A COOLING TOWER REPLACEMENT FOR AN EXISTING FACILITY LOCATED AT 2121 W CASINO RD,IN EVERETT WASHINGTON.THE TOWER SERVES A WATER <br /> EXPANSION JOINT SOURCE HEAT PUMP SYSTEM IN THE BUILDING AND IS AT END OF LIFE. LEGEND AND <br /> FLEXIBLE CONNECTOR B. THE DESIGN INCLUDES THE FOLLOWING NOTABLE FEATURES,BUT IS NOT LIMITED TO THIS SCOPE. ABBREVIATIONS <br /> 1. THE REPLACEMENT OF AN EXISTING 1890 MBH COOLING TOWER AND ASSOCIATED VALVES,PUMPS,VFD,CONTROL PANEL AND ACCESSORIES FOR LIKE-FOR-LIKE REPLACEMENTS. <br /> UNION 2. CONTROLS:EXISTING DIRECT DIGITAL BUILDING AUTOMATION SYSTEM(BAS)TO OPERATE ALL SYSTEM FUNCTIONS AND SCHEDULES. <br /> l T. CAPPED OR PLUGGED TEE C. CODES AND STANDARDS <br /> 1. THE COMPLETE INSTALLATION SHALL CONFORM TO ALL APPLICABLE FEDERAL,STATE,AND LOCAL CODES,ORDINANCES,UTILITY COMPANY REQUIREMENTS AND REGULATIONS <br /> BLIND FLANGE,CAP INCLUDING NECESSARY PERMITS AND INSPECTIONS REQUIRED BY THE GOVERNING AUTHORITIES. DRAWN BY:Author <br /> 2. WASHINGTON BUILDING CODES ENFORCED BY THE AUTHORITY HAVING JURISDICTION(AHJ): <br /> CONCENTRIC REDUCER a. 2018 INTERNATIONAL BUILDING CODE(IBC)WITH STATE AND LOCAL AMENDMENTS. CHECKED BY:Checker <br /> b. 2018 INTERNATIONAL MECHANICAL CODE(IMC)WITH STATE AND LOCAL AMENDMENTS. <br /> EXPANSION LOOP c. 2018 UNIFORM PLUMBING CODE(UPC)WITH STATE AND LOCAL AMENDMENTS. SHEET <br /> d. 2018 INTERNATIONAL FIRE CODE(IFC)WITH STATE AND LOCAL AMENDMENTS. <br /> z VALVE ON RISE e. 2020 NATIONAL ELECTRICAL CODE(NEC). <br /> 8, f. 2018 WASHINGTON STATE ENERGY CODE(WAC 51-11,WSEC). <br /> PIPE SIZE(DIAMETER IN INCHES) M O■O <br /> JOB NO.24US00135 <br /> Construction Documents 2/19/2024 <br />