My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2121 W CASINO RD WSIPC 2024-12-30
>
Address Records
>
W CASINO RD
>
2121
>
WSIPC
>
2121 W CASINO RD WSIPC 2024-12-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2024 1:10:59 PM
Creation date
12/17/2024 11:04:44 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2121
Tenant Name
WSIPC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GLUMAC <br /> COOLING TOWER SCHEDULE sustainable <br /> future <br /> engineers for a sustainable utu re <br /> WATER EL 1601 FiM16 Ave.,S-2210 <br /> NOM. AIMS MAKEUP �EIVIERG SUMP UNIT OPER. s ase.wn sa1o1 <br /> 0umac.wm <br /> TAG MANUFACTURER MODEL NUMBER TYPE CAP. FLOW WB LWT EWT P.D.+LIFT WATER FAN V/PH VFD POWER HTR SIZE WT. NOTES T.2a6.262.1010 <br /> MBH GPM °F °F F FT.WG. GPM HP Y/N /N KW L'Xw'xH' LBS a,eieccN.MaNUS 135 eGenn <br /> P,o :2 ger D N <br /> CT-1 BAC VF1-48-31N CLOSED CIRCUIT 1 1,890 380 1 67 1 85 95 1 20 1 9 (1)25 460/3 Y 1 N (1)3 1 12'-11"X 4'-9"X 10'-9"1 22,220 1 1 THRU 11 <br /> NOTES: <br /> 1.COORDINATE WITH ELECTRICAL FOR POWER AND DISCONNECT AS REQUIRED. <br /> 2.VARIABLE FREQUENCY DRIVE(VFD)PROVIDED BY MECHANICAL AND WIRED BY ELECTRICAL. <br /> 3.VFD TO BE REMOTELY MOUNTED OUTDOORS IN SAME LOCATION AS EXISTING AS INDICATED ON PLANS.ELECTRICAL TO PROVIDE SEPARATE DISCONNECT SWITCH AT TOWER. <br /> 4.PROVIDE MOTOR SHAFT GROUNDING SYSTEM ON MOTOR CONTROLLED BY VFD. <br /> 5.PROVIDE SEISMIC RATED CONNECTIONS TO THE EXISTING CONCRETE PAD.BID SHALL INCLUDE ALL REQUIREMENTS FOR THE DESIGN&CONSTRUCTION OF SEISMIC CONNECTIONS.SUBMIT DRAWINGS/CALCULATIONS AS A DIFFERED SUBMITTAL. <br /> 6.COOLING TOWER PERFORMANCE SHALL BE CTI CERTIFIED. <br /> 7.SEE SPECIFICATION 236500 FOR TOWER MATERIAL AND CONSTRUCTION REQUIREMENT <br /> B.PROVIDE BYPASS WATER PIPE CONNECTION AT THE SUMP LEVEL IN EACH BASIN. <br /> 9.PROVIDE INDIVIDUAL CELL,SUMP,FAN CONTROLS TO ALLOW FULL INDEPENDENT OPERATION OF EACH CELL. <br /> 10.CONNECT TO EXISTING WATER TREATMENT SYSTEM. Client <br /> 11.PROVIDE ELECTRIC WATER LEVEL CONTROL TO OPERATE SOLENOID MAKEUP WATER VALVE AND PROVIDE HIGH OVERFLOW AND LOW WATER ALARMS TO SAS SYSTEM.COORDINATE WITH ELECTRICAL FOR POWER AND WIRING. <br /> W S I P C <br /> Inspired by education. <br /> Empowered by technology." <br /> Project <br /> WSIPC Cooling <br /> Tower Replacement <br /> 2121 W.Casino Road, <br /> Everette,WA <br /> CT <br /> 1 <br /> COOLING <br /> TOWER <br /> ® DOMESTIC COLD <br /> WATER MAKEUP. <br /> 1"MIN. <br /> BUTTERFLY <br /> VALVE(TYP) <br /> TWO-POSITION W <br /> HIGH WATER BYPASS CONTROL <br /> VALVE(NC) <br /> LEVEL SENSOR V FT oy <br /> CWR _ <br /> NC is're '0 <br /> NC r C BYPASS WS lOgAy <br /> FLOOR SINK MOUNTED SIZE,SIZE,SEE NE SHALL MATCH CWR PLANS. ©2014-GLUMAC ALL RIGHTS RESERVED <br /> PLANS.PROVIDE HEAT <br /> COOLING TOWER TRACE THESE DRAWINGS ARE THE PROPERTY OF <br /> GLUMAC ARE NOT TO BE <br /> USED OR REPRODUCED IN ANY MANNER, <br /> NOTES: WITHOUT PRIOR WRITTEN PERMISSION <br /> 1. CONTRACTOR SHALL BECOME FAMILAR WITH THE EXISTING SAS CONTROLS LOGIC 1. REFER TO DRAWINGS FOR PIPE SIZES&CONTINUATION.PIPE SIZES SHALL MATCH TOWER CONNECTION SIZES Revisions <br /> FOR THE EXISTING TOWER PRIOR TO THE DEMOLITION OF EXISTING TOWER.NOTE 2. UNLESS NOTED ON FLOOR PLANS. # Description Date <br /> CONTROL POINTS&SEQUENCE TO INCLUDE IN THE BAS CONTROL <br /> DRAWINGS/DESIGN AS A DIFFERED SUBMITTAL. PROVIDE DRAIN VALVES AT SYSTEM LOW POINTS OF PIPING <br /> 3. PROVIDE ELECTRIC HEAT TRACE WIRING AND INSULATE WATER LINES IN FREEZING CLIMATES. <br /> 2. THE NEW TOWER SHALL OPERATE SIMILAR TO EXISTING FOR ENABLE/DISABLE CLIMATES. <br /> CONTROL,MONITORING&ALARMS.RECONNECT ANY NEW SENSORS PROVIDED ON 4. PROVIDE ELECTRIC HEAT TRACE WIRING AND INSULATE CONDENSER WATER SUPPLY AND RETURN WATER LINES, <br /> THIS PROJECT TO EXISTING CONTROL PANELS.INCLUDE NEW WIRING. IN FREEZING CLIMATES WHERE COOLING TOWERS WILL BE OPERATING IN THE WINTER. SHEET TITLE: <br /> 3. A TOWER FILL BYPASS LINE&(2)NEW VALVES ARE INCLUDED IN THIS SCOPE OF SCHEDULES & <br /> WORK.WHEN OUTDOOR AIR TEMPERATURES ARE BELOW 35F(ADJUSTABLE)& 5. ROUTE BYPASS PIPE THROUGH WATERTIGHT BULKHEAD FITTING ON SIDE OF BASIN AND TERMINATE BELOW <br /> TOWER IS ENABLED,BYPASS FILL/TOWER COIL DIRECT TO BASIN TO PROTECT OVERFLOW LEVEL. DIAGRAMS <br /> TOWER ELEMENTS FROM FREEZING.RETURN TO NORMAL OPERATION ABOVE 35F(ADJUSTABLE) 6. PROVIDE HIGH WATER LEVEL SENSOR BELOW OVERFLOW WITH BAS ALARM. <br /> DRAWN BY:Author <br /> CONTROLS DESCRIPTION COOLING TOWER PIPING DIAGRAM <br /> CHECKED BY:Checker <br /> 2 NTS NTS <br /> SHEET <br /> M0.1 <br /> JOB NO.24US00135 <br /> Construction Documents 2/19/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.