My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W 2025-01-06
>
Address Records
>
36TH AVE W
>
5900
>
5900 36TH AVE W 2025-01-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:28:40 PM
Creation date
12/18/2024 2:51:38 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1780
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOUNDVIEW TECHNOLOGY CENTER EVERETT, WA <br /> PROJECT OVERVIEW <br /> PROPOSED IMPROVEMENTS <br /> The proposed development will consist of three (3) 2-story buildings totaling approximately 485,700 SF <br /> with approximately 581 parking stalls, stormwater management facilities, utilities and on-site landscaping <br /> on a 39.4-acre site at 5900 36t" Avenue W in Everett, Washington. The property is zoned M-1 (Industrial) <br /> DESIGN CRITERIA <br /> At the time of the Public Works permit approval in 2017, the City of Everett utilized the 2014 Stormwater <br /> Management Manual for Western Washington (2012 manual amended in 2014) drainage requirements. <br /> The City has not adopted the 2019 Stormwater Management Manual for Western Washington. Since the <br /> proposed buildings were not approved for permit in 2017 along with the civil plans, runoff from the new <br /> building roof areas must be modelled in accordance with the 2019 stormwater manual requirements. To <br /> simplify modelling, the entire site has been designed using current WWHM stormwater modelling data. <br /> Stormwater discharges shall match developed discharge durations to predeveloped durations for the <br /> range of predeveloped discharge rates from 50 percent of the 2-year recurrence interval peak flow up to <br /> the full 50-year peak flow.The pre-developed condition to be matched shall be a forested land cover. <br /> Jurisdictional Requirements <br /> Table 1 below summarizes the City of Everett Stormwater requirements. <br /> TABLE 1 <br /> Jurisdictional Requirements <br /> Duration Analysis: <br /> 2-year: Reduce to 50% pre-developed duration <br /> 50- ear: Match pre-developed <br /> Water Quality Flow Rate: Vault#3 (Basin B) = 0.077 CFS <br /> Vault#4 (Basin C) = 0.044 CFS <br /> Downstream Analysis: <br /> Level 1: '/a mile downstream <br /> SEPTEMBER 23, 2022 STORMWATER DRAINAGE REPORT PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.