Laserfiche WebLink
SOUNDVIEW TECHNOLOGY CENTER EVERETT, WA <br /> PROJECT LOCATION <br /> juim Tutairp LR.II Granite falls <br /> Mount Pe7ehexk <br /> Marysville A. <br /> Port Hadlock A► � <br /> =reelantl Lake Stevens Big Four Mountain <br /> Everett-\ A <br /> Leland li. S r o homish Galena <br /> Maxi Townsend Puget Sound <br /> r Port Gamble Mill Cr= %lonroe Gold Bar <br /> MOL"Walker <br /> .. PROJECT SITE Mount Index <br /> AL <br /> Port n sotFlel <br /> ulsbo Modaon Duvall <br /> MournJuprter [R MillerRivei <br /> 3 <br /> AL <br /> The Brothers r Redmond <br /> Silverdale Carnation <br /> 6866ft I Bainbridge <br /> Island Seattle Bellevue <br /> Holly Bremerton Mercer Island Mount Gar, <br /> ALALGoldMOLP'ton, Q ssaquahi rE <br /> r North Bend <br /> Renton TigerMountoin Asn10Q <br /> Belfair 16 .r_,shon <br /> Location: 5900 3611 Avenue W <br /> Section, Township, Range: Section 03, Township 28, Range 04 <br /> Tax Account Number: 28040300200100 <br /> Size: 1,718,342 SF (39.4 AC) <br /> City, County, State: Everett, Snohomish County, Washington State <br /> Governing Agency: City of Everett <br /> Stormwater Design Criteria: 2019 SWMMWW <br /> Civil Design Drawings: COE Design and Construction Standards and Specs.January 2017 <br /> Zoning: Industrial (M-1) <br /> SEPTEMBER 23, 2022 STORMWATER DRAINAGE REPORT PAGE 2 <br />