My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W 2025-01-06
>
Address Records
>
36TH AVE W
>
5900
>
5900 36TH AVE W 2025-01-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:28:40 PM
Creation date
12/18/2024 2:51:38 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1780
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Drainage <br />25 <br />The Biopod GULD letter states that for Biopods downstream <br />Report <br />of detention, the water quality design flow rate is the full 2- <br />year release of the detention facility. Per the provided <br />modeling results, this is 0.094056 cfs for Vault #3 and <br />0.053198 cfs for Vault #4. Update the text on page 25 in the <br />drainage report. However, it appears that the Biopods are <br />sufficiently sized. <br />6 <br />Drainage <br />Per the Ecology GULD letter for the Biopods, each site plan <br />Report <br />must undergo manufacturer review and approval before site <br />installation to ensure that site grading and slope are <br />appropriate for use of the Biopods. Provide a letter from the <br />manufacturer addressing this, and attach it to the drainage <br />report. <br />7 <br />Drainage <br />CSWPPP, <br />It appears that the project will use BMPT5.13 where there <br />Report <br />Element 13 <br />are no steep slopes. Include Element 13 in the construction <br />SWPPP and include language/BMPs to protect those areas <br />from compaction. <br />8 <br />Civil Plans <br />T5.13 <br />Include a detail for BMPT5.13 or call out DCSS Standard Plan <br />202 or 203 by reference. <br />9 <br />Drainage <br />33-36 <br />A single event hydrograph method should be used to <br />Report <br />calculate Q for BMP C241, instead of WWHM. If the <br />construction area is < 1 acre, then the Rational Method Can <br />be used. <br />10 <br />Drainage <br />Appendix E <br />If pipes downstream of detention are smaller than pipes <br />Report <br />Conveyance <br />upstream of detention, provide calculations that the <br />Calculations <br />downstream pipes are sized for the 100-yr storm for <br />documentation purposes. <br />11 <br />Drainage <br />Appendix <br />• The Storm Chamber System #1 model is missing. Attach <br />Report <br />D, Models <br />this to the drainage report. <br />• Provide sizing calculations to demonstrate that the <br />chamber and stone void space was accounted for in sizing <br />the Storm Chamber system to meet the modeled <br />detention requirements. <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.