My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W 2025-01-06
>
Address Records
>
36TH AVE W
>
5900
>
5900 36TH AVE W 2025-01-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:28:40 PM
Creation date
12/18/2024 2:51:38 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1780
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br />Drainage <br />Is the correct GU LD document from Ecology attached to the <br />Report <br />drainage report? <br />Per Ecology's GULD document, the site plans must undergo <br />manufacturer review and approval to ensure that design <br />parameters, including site grading and slope are appropriate <br />for use with the Biopod units. Attach the manufacturer's <br />review letter to the drainage report. <br />13 <br />Civil Plans <br />C-2.14 <br />Show the Bipod design water elevation. <br />Will fluctuating water levels in the Biopod units alter the <br />stage -discharge relationship of the flow restrictor? <br />14 <br />Other <br />Provide structural calculations and plans for the vaults and <br />Storm Chamber. These structures must meet City vehicle <br />loading requirements (attached). This can be a deferred <br />submittal. <br />15 <br />Other <br />It appears that a previous geotech study found groundwater <br />up to 1 ft below ground surface. Address whether detention <br />vault flotation will be an issue. You may provide buoyancy <br />calculations or address this in structural plans and explain in <br />the drainage report. <br />16 <br />Drainage <br />6-7 <br />• SEPA12-017 indicates that there are four wetlands onsite <br />Report <br />that will be filled and mitigated. The project shall provide <br />equivalent storage capacity for any filled wetlands. <br />• Will the project discharge, either directly or indirectly, to <br />any onsite or offsite wetland? If so MR #8, applies. City <br />mapping shows a wetland in the vicinity of the Basin D <br />outfall and a wetland near Japanese Gulch where Basin A <br />flows to. Update the downstream map and downstream <br />analysis to discuss this. <br />17 <br />Civil Plans <br />C-2.10 <br />Outfall A requires an easement from the adjacent property <br />owner. <br />Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.