Laserfiche WebLink
HARMONIOUS CAPITAL PARTNERS LLC <br /> Attn: Angie Kim, Senior Development Director <br /> February 28, 2022 <br /> Page-3- <br /> than what was noted in Soundview Warehouse/Distribution Facilities Traffic Generation <br /> Lette r. <br /> Traffic Mitigation <br /> Everett Municipal Code Section 19.51.100.D. Traffic Mitigation identifies that the rate at <br /> $3,994 per net new PM peak hour trip starting January 1, 2022. The site is located in the SW <br /> Subarea Plan that has a grandfathered rate of$1,006 per net new PM peak hour trip. <br /> The project would need to be constructed per applicable City requirements <br /> �4 <br /> Summary 03.17.2022 <br /> This letter has documented the projected trip generation for the proposed 36t"Avenue <br /> Warehouse/Distribution Facilities to be located at the north end of 36t"Ave. W. in Everett. <br /> Please contact me at 206.762.1978 or email me at jaketraffic@comcast.net if you have any <br /> questions. <br /> Sincerely, <br /> , , <br /> �i <br /> Mark J.Jacobs, PE, PTOE, President <br /> JAKE TRAFFIC ENGINEERING, INC <br /> MJJ: mjj ? A OZ .Zd' Z 0ZZ <br /> 0\-P,%—Gil ec\2022 C16-36N Ave WI,dus[rial-Bridge Indus-I-Everett\36th—I.d.—IlTrafflcLetter doc <br /> COLOR COPY ONLY <br />