My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W 2025-01-06
>
Address Records
>
36TH AVE W
>
5900
>
5900 36TH AVE W 2025-01-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:28:40 PM
Creation date
12/18/2024 2:51:38 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1780
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's Structural Reviewers. All questions shall be routed through this project's Public Works Reviewer <br />Thad Newport with City of Everett Permit Services (TNewportccDeverettwa.gov). <br />q <br />Document I <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />Review Comments from DEPARTMENT NAME. Building Department , REVIEWER NAME. _Drew Martin <br />1 <br />General <br />- <br />All designs appear to have been produced 5-6 years ago using <br />The design followed recommendations <br />SRC/DC <br />(applies to all) <br />non -IBC documents. It is not clear if any of the standard or <br />presented in FHWA-NHI-14-007 Soil Nails <br />design procedures may have been superseded with more <br />Walls Reference Manual published in <br />current requirements or recommendations. The documents <br />February 2015. This manual was <br />should be revised as needed. The appropriate standard <br />developed using AASHTO LRFD Bridge <br />editions should be specified. <br />Design Specifications, 7th Edition. The <br />FHWA manual is the current state of the <br />practice for soil nail wall design. The <br />recommendations in the plans and <br />specifications have not been superseded <br />more current requirements. <br />2 <br />- <br />- <br />All wall types should specify special inspection requirements <br />There is a standard for soil nail <br />SRC/DC <br />in the respective drawings. Inspection schedules should list <br />construction quality assurance, testing, <br />the type and frequency of each inspection required. The MSE <br />and recording materials and inspection, <br />and rockery walls should specify geotechnical inspections per <br />by FHWA. The Industry Standard for Soil <br />IBC Table 1705.6. The soil nail walls should specify <br />Nail Walls was established by FHWA, and <br />geotechnical and structural inspections per IBC Tables 1705.3 <br />David Cotton, Principal Geotechnical <br />and 1705.6; additional tests per Table 1705.7 should be <br />Engineer for the design, was a coauthor of <br />specified as applicable. Inspections and tests should also be <br />two design and construction manuals for <br />listed as required by the specified design standards used for <br />FHWA, which is used Nation Wide for <br />each wall. <br />Permanent and Temporary Soil Nail Wall <br />design and construction monitoring and <br />testing. The current specifications meet <br />the Industry Standard of Practice and Care <br />by meeting the FHWA requirements for <br />testing and inspection. <br />Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.